Project overview

Aaradhya Highpark - Project 1 Of Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017865. Aaradhya Highpark - Project 1 Of Phase I is located at Vxetnqhzudm7lyorhp7iijpsmtog2se4cwsqoosk1h3trmac7w59kstmewqk6yrq. This is a New being developed by Man Vastucon Llp.

Aaradhya Highpark - Project 1 Of Phase I has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 408 to 782 Sq.ft. Carpet. The Project has total 671 of which 2 are currently available for sale.

Aaradhya Highpark - Project 1 Of Phase I is being developed on a total land area of 51842 Sq.ft. out of which 16953 Sq.ft. i.e 33% is reserved for recreational purposes. Aaradhya Highpark - Project 1 Of Phase I has 4 Wings / Towers Shopline,Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Aaradhya Highpark - Project 1 Of Phase IMan Vastucon LlpVxetnqhzudm7lyorhp7iijpsmtog2se4cwsqoosk1h3trmac7w59kstmewqk6yrq30-03-2025 00:00:00
Aaradhya Highpark - Project 2 Of Phase IMan Vastucon LlpNsclkkfzgjoxlncaq9hdhf93dvu08xodzkdcejjm3+4+Azpmtwbix9085fktvwz830-03-2025 00:00:00
Aaradhya Parkwood 1Man Vastucon LlpXtktt01wbm5scdwbnbe/1Iuzs4leqxfincy3z4gednehkaak4jjdf01i1z28pgpcwiywyvlrkvaq8xycputqmw==31-12-2028 00:00:00
S3 SkygreensS3 Smart Spaces Private Limited6Ttmt7xjbumyfrtsvd3blvqlvzlyfldoocki3la8ayb4narhte3qwijfkyz2h2olvgdcwv5h7v6mvhudkotvwlt9xs9oyoyzslowzd0nz4gx2rbptqy9qty5jnqewpohtlcbni/Gbagu6seqhtg1eg==30-06-2028 00:00:00
127 Raj Homes B And C WingRaj HomesWz7itp03h3ey2etowdlfparzfbhvkir4plwtgo94nu2fj2/Dajoz1u26yybk8k+V31-12-2026 00:00:00
127 Raj Homes D WingRaj HomesXebohvwp3s1rx/Tzcs5h+Rjmvpp9wlljkfe0g8u8harepgbrb0lyhzdg4hd5v9io31-12-2026 00:00:00
Sector 2A - Wing CEversmile Properties Private Limited7Vpeds5cx1yor8y9dkjwyjzhyaxctke2uopssifj3djxofo/587I2vsxxuc0tfrfasudesvvdnwf/Hoznzcf1g==30-06-2027 00:00:00
127 Raj Homes A WingRaj HomesT4u8s9zt0d5k6ccbfaudgg4xfb4co9iss8rrcbvnrph9tzlluhybrn2gmeajn3us30-09-2025 00:00:00
Krishna PrestigeM/S. Arun Bhoomi CorporationLyzv3zezmyfoqrcuu0jezw==29-12-2022 00:00:00
AARADHYA PARKWOOD 2MAN VASTUCON LLPOld Survey No 260 Part/New Survey No 12 Hissa No 231-12-2028 00:00:00
RAJ ULTIMATE E-WINGS D U TRADELINK PVT LTD.Old S No 127, New S No 49 Hissa No 1931-12-2026 00:00:00
S3 SkyriseS3 Smart Spaces Private LimitedMjip1lf8a8t+Rnkuqwnwnaet6ds/Yndmfddfane/5Ahitn0xzvvsse1mpwfeeokumykhckbjijdzid+Aobndmd3wmlnwwrasxm+Nxq1fblf9t2zp89t3ode84k4h5vx6ttyhlw7/Xuig1peod/1Iqa==31-12-2027 00:00:00
Avanya Tower AAniline Properties Private LimitedE1fzjwnyz/Hwf92ohpwfrq==30-12-2023 00:00:00
Ganesh DarshanJ.V. RealtyOelyyq1k6gfhvcuk+Ye5vrzu1tblq9wlpjzhdiw8s0m+Hgxhhvur4mwdy62/4Uy030-07-2026 00:00:00
Madhuban A And A1 WingM.D. DevelopersToib077mc4qbaw9lcpqqxcaw732t+P6tprrmnolfiildgfe37u04ogujjyqxql61bzzuws4hxnh5nysseq+Gxfrt+Madvoek0cqvhcl6cl8=31-12-2018 00:00:00
Sanghvi S3 Ecocity WoodsSanghvi Premises Pvt. Ltd.S No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi30-12-2023 00:00:00
Sanghvi S3 Ecocity OrchidSanghvi Premises Pvt LtdS No 102/26 And 88/13 Village Mire And S No 11/1/2 Village Mahajanwadi30-12-2023 00:00:00
Prestige Garden TrailsPrestige Estates Projects Limited31-10-2030 00:00:00
Crescent Wtc (Western Trade Center)Crescent SheltersTaqd3sj8vbmz4k8w6vmkcubjfwir8oj6mtyzdvuyxmfcuyon1joi21ddj8tcbeyempdbj46r0qnr3odunzh0popjwynbaazbis+Lpwbjstdgzdjk+Obxwlerwi5vohcurw46avglhbtx+Pbjrqbdug==30-06-2027 00:00:00
CRESCENT WTC - WESTERN TRADE CENTER - PHASE - II, BUILDING A 1 - 2CRESCENT SHELTERS4152, 4153, 4316, 4351, 4352, 4354, 4355, 4356, 4357, 4358, 4359, 4360, 4404, 440530-06-2028 00:00:00
Westin Darvesh HorizonDarvesh Properties Private LimitedOpaxeore3qb5kn/Ed6o0kzbxi808m20ba0r1ckx9hprjuqgwrk4z0ujgprumwfo5idbuwajt6zax8xu7vq63hxx4hny2ivgtgymy2qbz9wz1wmos/Dnvhkuygolty9nw13igd8zzyuil5ha6y6d6la==30-06-2021 00:00:00
Imperial GardenS. K. Heights Builders & Developers LlpQe51lve9mvibwdeerztlyir4fqpihpxputh7r0euc7zai9rn1ywpj3xolulxq3gc10mp48jvksmmsfznil08uehewmekowxael068usinkl9n+5Powa3nqdcbciu7yir/1Nij8aw/M/+Qj3pyk45jyr+Ph1j7xy1os/Tymvafevuo/7Ybj6nhvujg0hjmg4mqj+0Oxaqdelnaczhloig+O6h9vhybi1dqggieqe5wvy6hrnksyagfhfucqwdbqebw4gxusvvdeqewhmozl1vuw==31-03-2031 00:00:00
Db OzoneNeelkamal Realtors Suburban Private LimitedP+Hoiy3+Fbnfffnkxkxo7xw8w4z0izjyfkn4uzhadogg9zbpxt+Ds9/Ahpmipzpwdle+Xoenl3tbdkrkcjaz5nfg/Rp0h9qpm3my1gmzcki2vjq6kra+Xtrg1fqzbxld31-12-2019 00:00:00
A H SapphireA.H. Constructions4273,4274,427530-06-2024 00:00:00
Aaradhya Highpark Project Iii Of Phase 1Man Vastucon LlpC1rkmzzmohymg2l3mpcv3hejvgo2i4rc/+Bmuj+33Rfu6h1/3O1auobfb95x/Gyp31-12-2025 00:00:00
DELTA GARDENDelta ventureCts1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 21032157 2158 2221 2222 2294 2295 174131-07-2018 00:00:00
Avanya Tower CAniline Properties Private LimitedWgsymwfiyqalm0j3gyjneq==31-03-2026 00:00:00
TowncrestShree Sai Enterprises31-12-2029 00:00:00
Man OpusMan Global Ltd.Kdpfz1fcmtjsxdilibbyrr8na+4Ddbkcwmtgxsk7qenjnwcfyceezdp//2Uqjc0p0uylmwdnki0i7l9/Wjpw4tpjxxtxcqmlngoybacwcerxf/Yaf2ctlegsomjioek431-12-2018 00:00:00
Avanya Tower DAniline Properties Private Limited30-09-2028 00:00:00
Avanya Tower BAniline Properties Private Limited2Dcmvhhhzwwh4mk6461zsa==30-09-2025 00:00:00
Project Details
  • Project:
    Aaradhya Highpark - Project 1 Of Phase I
  • Location:
  • Vxetnqhzudm7lyorhp7iijpsmtog2se4cwsqoosk1h3trmac7w59kstmewqk6yrq
  • Const. Stage:
    New
  • Possession:
    30 Mar 2025
Developer Details

  • Developer:
    Man Vastucon Llp
  • Phone:
  • Address:
  • Krushal Commercial Complex
Project RERA Details
MAHA REARA No: P51700017865
Project Type Others
RERA Project Status New
Architect Disha Design Consultants
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Jul 2019
Last Retrived 13 Feb 2026
Aaradhya Highpark - Project 1 Of Phase I QR Code
Aaradhya Highpark - Project 1 Of Phase I
MahaRERA - P51700017865
Apartment Details & Configuration
TypeArea
SHOP18.65 Sq.mts. ( 201 Sq.ft. )
SHOP24.3 Sq.mts. ( 262 Sq.ft. )
SHOP26.9 Sq.mts. ( 290 Sq.ft. )
SHOP27.17 Sq.mts. ( 292 Sq.ft. )
SHOP27.9 Sq.mts. ( 300 Sq.ft. )
SHOP34.17 Sq.mts. ( 368 Sq.ft. )
SHOP35.88 Sq.mts. ( 386 Sq.ft. )
SHOP51.29 Sq.mts. ( 552 Sq.ft. )
SHOP60.79 Sq.mts. ( 654 Sq.ft. )
SHOP GR PLUS 1194.54 Sq.mts. ( 2094 Sq.ft. )
SHOP Gr. plus 162.56 Sq.mts. ( 673 Sq.ft. )
SHOP Gr. plus 165.69 Sq.mts. ( 707 Sq.ft. )
SHOP Gr. plus 167.87 Sq.mts. ( 731 Sq.ft. )
SHOP Gr. plus 167.97 Sq.mts. ( 732 Sq.ft. )
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )
2 BHK47.15 Sq.mts. ( 508 Sq.ft. )
2 BHK47.38 Sq.mts. ( 510 Sq.ft. )
3 BHK62.31 Sq.mts. ( 671 Sq.ft. )
3 BHK62.74 Sq.mts. ( 675 Sq.ft. )
1 BHK36.09 Sq.mts. ( 388 Sq.ft. )
1 BHK37.05 Sq.mts. ( 399 Sq.ft. )
2 BHK52.02 Sq.mts. ( 560 Sq.ft. )
1 BHK37.89 Sq.mts. ( 408 Sq.ft. )
2 BHK53.31 Sq.mts. ( 574 Sq.ft. )
2 BHK53.4 Sq.mts. ( 575 Sq.ft. )
3 BHK72.67 Sq.mts. ( 782 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya Highpark - Project 1 Of Phase Ilast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Aaradhya Highpark - Project 1 Of Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya Highpark - Project 1 Of Phase I by Man Vastucon Llplast updated on 13 Feb 2026 as per information obtained from MARA RERA.

51842 Sq. ft.

Project Area

16953 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

671 apartments in total
Total
671
Booked
669
Available
2

Saleable Area Statistics (Sq. ft.)

325767 Total
Total
325767
Booked
323166
Available
2602
Total 671 apartments in project. 669 apartments booked. 99% apartments booked.
Total 325767 Sq.ft. saleable area. 323166 saleable area booked.
99% area booked.

Shopline

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ShoplineMar 20242120000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SHOP18.65 Sq.mts. ( 201 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP24.3 Sq.mts. ( 262 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP26.9 Sq.mts. ( 290 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP27.17 Sq.mts. ( 292 Sq.ft. )10
10 Booked100% Booked
100% Booked
SHOP27.9 Sq.mts. ( 300 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP34.17 Sq.mts. ( 368 Sq.ft. )16
16 Booked100% Booked
100% Booked
SHOP35.88 Sq.mts. ( 386 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP51.29 Sq.mts. ( 552 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP60.79 Sq.mts. ( 654 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP GR PLUS 1194.54 Sq.mts. ( 2094 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP Gr. plus 162.56 Sq.mts. ( 673 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP Gr. plus 165.69 Sq.mts. ( 707 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP Gr. plus 167.87 Sq.mts. ( 731 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP Gr. plus 167.97 Sq.mts. ( 732 Sq.ft. )1
1 Booked100% Booked
100% Booked
41 total apartments / 40 apartments booked. 97% apartments booked.
Work Description in Building ShoplineCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AMar 20243112120161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )24
24 Booked100% Booked
100% Booked
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )84
84 Booked100% Booked
100% Booked
2 BHK47.15 Sq.mts. ( 508 Sq.ft. )84
83 Booked98% Booked
98% Booked
2 BHK47.38 Sq.mts. ( 510 Sq.ft. )24
24 Booked100% Booked
100% Booked
3 BHK62.31 Sq.mts. ( 671 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK62.74 Sq.mts. ( 675 Sq.ft. )6
6 Booked100% Booked
100% Booked
228 total apartments / 227 apartments booked. 99% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BMar 20243112120146
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.01 Sq.mts. ( 388 Sq.ft. )84
84 Booked100% Booked
100% Booked
1 BHK36.09 Sq.mts. ( 388 Sq.ft. )24
24 Booked100% Booked
100% Booked
1 BHK37.05 Sq.mts. ( 399 Sq.ft. )24
24 Booked100% Booked
100% Booked
2 BHK47.15 Sq.mts. ( 508 Sq.ft. )84
84 Booked100% Booked
100% Booked
2 BHK52.02 Sq.mts. ( 560 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK62.74 Sq.mts. ( 675 Sq.ft. )6
6 Booked100% Booked
100% Booked
228 total apartments / 228 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CMar 20243111120138
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.89 Sq.mts. ( 408 Sq.ft. )60
60 Booked100% Booked
100% Booked
2 BHK53.31 Sq.mts. ( 574 Sq.ft. )24
24 Booked100% Booked
100% Booked
2 BHK53.4 Sq.mts. ( 575 Sq.ft. )30
30 Booked100% Booked
100% Booked
3 BHK72.67 Sq.mts. ( 782 Sq.ft. )60
60 Booked100% Booked
100% Booked
174 total apartments / 174 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Man Vastucon Llp
for Project
Aaradhya Highpark - Project 1 Of Phase I
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation