Aaradhya Nine is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000229. Aaradhya Nine is located at Pant Nagar, Ghatkopar East, Ghatkopar East. This is a New Project being developed by Micl Realty Llp.

Aaradhya Nine has 1 BHK, 1 BHK\REHAB, 1RK & 2 BHK Apartments with carpet areas ranging from 332 to 544 Sq.ft. Carpet. The Project has total 251 of which 5 are currently available for sale.

Aaradhya Nine is being developed on a total land area of 26498 Sq.ft. Aaradhya Nine has 4 Wings / Towers Wing A,Wing B,Wing C,Wing D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Aaradhya Nine
  • Location:
  • Pant Nagar, Ghatkopar East, Ghatkopar East
  • Const. Stage:
    New Project
  • Possession:
    30 Mar 2021
Developer Details

  • Developer:
    Micl Realty Llp
  • Phone:
  • Address:
  • 12Th Floor, Krushal Commercial Complex, G. M. Road, Above Shopper Stop, Chembur West, 400089
Project RERA Details
MAHA REARA No: P51800000229
Project Type Residential
RERA Project Status New Project
Funding Bank KOTAK MAHINDRA BANK
Proposed Possession 30 Mar 2021
Revised Possession
Extended Possession
Litigations Yes
Last Modified 22 Jun 2021
Last Retrived 15 Jan 2025
Aaradhya Nine QR Code
Aaradhya Nine
MahaRERA - P51800000229
Apartment Details & Configuration
TypeArea
3 BHK79.25 Sq.mts. ( 853 Sq.ft. )
3 BHK90.95 Sq.mts. ( 979 Sq.ft. )
2 BHK56.11 Sq.mts. ( 604 Sq.ft. )
2 BHK66.61 Sq.mts. ( 717 Sq.ft. )
1 BHK\REHAB41.25 Sq.mts. ( 444 Sq.ft. )
1 BHK\REHAB41.43 Sq.mts. ( 446 Sq.ft. )
1 BHK41.53 Sq.mts. ( 447 Sq.ft. )
1RK30.84 Sq.mts. ( 332 Sq.ft. )
2 BHK50.54 Sq.mts. ( 544 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya Ninelast updated on 15 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
-
FITNESS CENTER AT TERRACE OF WING A AND B100% completed
95% Complete
Only For Members Of A And B Wing
Landscaping & Tree Planting100% completed
95% Complete
-
Open Parking
Na
RECREATION AREA AT TERRACE OF WING A AND B100% completed
95% Complete
Only For Members Of A And B Wing
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
No Septic Tank
Solid Waste Management And Disposal100% completed
95% Complete
-
Storm Water Drains100% completed
95% Complete
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
-
Water Conservation, Rain water Harvesting100% completed
95% Complete
Only Rain Water Harvesting
Water Supply100% completed
95% Complete
-
Buildings / Wings in Aaradhya Nine
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya Nine by Micl Realty Llplast updated on 15 Jan 2025 as per information obtained from MARA RERA.

26498 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

251 apartments in total
Total
251
Booked
246
Available
5

Saleable Area Statistics (Sq. ft.)

151826 Total
Total
151826
Booked
147435
Available
4391
Total 251 apartments in project. 246 apartments booked. 98% apartments booked.
Total 151826 Sq.ft. saleable area. 147435 saleable area booked.
97% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ASep 2020161110039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK79.25 Sq.mts. ( 853 Sq.ft. )30
26 Booked86% Booked
86% Booked
3 BHK90.95 Sq.mts. ( 979 Sq.ft. )29
28 Booked96% Booked
96% Booked
59 total apartments / 54 apartments booked. 91% apartments booked.
Work Description in Building Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BSep 2020161110057
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.11 Sq.mts. ( 604 Sq.ft. )30
30 Booked100% Booked
100% Booked
2 BHK66.61 Sq.mts. ( 717 Sq.ft. )29
29 Booked100% Booked
100% Booked
59 total apartments / 59 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CSep 2020161110029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK\REHAB41.25 Sq.mts. ( 444 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 BHK\REHAB41.43 Sq.mts. ( 446 Sq.ft. )44
44 Booked100% Booked
100% Booked
59 total apartments / 59 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DSep 2020161110029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.43 Sq.mts. ( 446 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK41.53 Sq.mts. ( 447 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK\REHAB41.53 Sq.mts. ( 447 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK\REHAB41.43 Sq.mts. ( 446 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK\REHAB41.25 Sq.mts. ( 444 Sq.ft. )15
15 Booked100% Booked
100% Booked
1RK30.84 Sq.mts. ( 332 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK50.54 Sq.mts. ( 544 Sq.ft. )14
14 Booked100% Booked
100% Booked
74 total apartments / 74 apartments booked. 100% apartments booked.
Work Description in Building Wing DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Micl Realty Llp
for Project
Aaradhya Nine
last updated on 15 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation