Project overview
Aaradhya Nine is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000229. Aaradhya Nine is located at Pant Nagar, Ghatkopar East, Ghatkopar East. This is a New Project being developed by Micl Realty Llp.
Aaradhya Nine has 1 BHK, 1 BHK\REHAB, 1RK & 2 BHK Apartments with carpet areas ranging from 332 to 544 Sq.ft. Carpet. The Project has total 251 of which 5 are currently available for sale.
Aaradhya Nine is being developed on a total land area of 26498 Sq.ft. Aaradhya Nine has 4 Wings / Towers Wing A,Wing B,Wing C,Wing D
Project | Developer | Location | Possession |
-
Developer:
Micl Realty Llp
-
Phone:
-
Address:
-
12Th Floor, Krushal Commercial Complex, G. M. Road, Above Shopper Stop, Chembur West, 400089
MAHA REARA No: |
P51800000229 |
Project Type |
Residential |
RERA Project Status |
New Project |
Funding Bank |
KOTAK MAHINDRA BANK |
Proposed Possession |
30 Mar 2021 |
Revised Possession |
|
Extended Possession |
|
Litigations |
Yes |
Last Modified |
22 Jun 2021 |
Last Retrived |
15 Jan 2025 |
Aaradhya Nine QR Code
Aaradhya Nine
MahaRERA - P51800000229
Type | Area |
3 BHK | 79.25 Sq.mts. ( 853 Sq.ft. ) |
3 BHK | 90.95 Sq.mts. ( 979 Sq.ft. ) |
2 BHK | 56.11 Sq.mts. ( 604 Sq.ft. ) |
2 BHK | 66.61 Sq.mts. ( 717 Sq.ft. ) |
1 BHK\REHAB | 41.25 Sq.mts. ( 444 Sq.ft. ) |
1 BHK\REHAB | 41.43 Sq.mts. ( 446 Sq.ft. ) |
1 BHK | 41.53 Sq.mts. ( 447 Sq.ft. ) |
1RK | 30.84 Sq.mts. ( 332 Sq.ft. ) |
2 BHK | 50.54 Sq.mts. ( 544 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Aaradhya Ninelast updated on 15 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
No Receiving Station |
|
|
Na |
Fire Protection And Fire Safety
Requirements100% completed
|
|
- |
FITNESS CENTER AT TERRACE OF WING A AND B100% completed
|
|
Only For Members Of A And B Wing |
Landscaping & Tree Planting100% completed
|
|
- |
|
|
Na |
RECREATION AREA AT TERRACE OF WING A AND B100% completed
|
|
Only For Members Of A And B Wing |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
No Septic Tank |
Solid Waste Management And Disposal100% completed
|
|
- |
Storm Water Drains100% completed
|
|
- |
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water100% completed
|
|
- |
Water Conservation, Rain water Harvesting100% completed
|
|
Only Rain Water Harvesting |
Water Supply100% completed
|
|
- |
Buildings / Wings in Aaradhya Nine
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aaradhya Nine by Micl Realty Llplast updated on 15 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
251
apartments in total
Saleable Area Statistics (Sq. ft.)
151826
Total
Total 251 apartments in project. 246 apartments booked. 98% apartments booked.
Total 151826 Sq.ft. saleable area. 147435 saleable area booked.
97% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Wing A | Sep 2020 | 16 | 1 | 1 | 1 | 0 | 0 | 39 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
3 BHK | 79.25 Sq.mts. ( 853 Sq.ft. ) | 30 | |
3 BHK | 90.95 Sq.mts. ( 979 Sq.ft. ) | 29 | |
59 total apartments / 54 apartments booked. 91% apartments booked. |
Work Description in Building Wing A | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Wing B | Sep 2020 | 16 | 1 | 1 | 1 | 0 | 0 | 57 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
2 BHK | 56.11 Sq.mts. ( 604 Sq.ft. ) | 30 | |
2 BHK | 66.61 Sq.mts. ( 717 Sq.ft. ) | 29 | |
59 total apartments / 59 apartments booked. 100% apartments booked. |
Work Description in Building Wing B | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Wing C | Sep 2020 | 16 | 1 | 1 | 1 | 0 | 0 | 29 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK\REHAB | 41.25 Sq.mts. ( 444 Sq.ft. ) | 15 | |
1 BHK\REHAB | 41.43 Sq.mts. ( 446 Sq.ft. ) | 44 | |
59 total apartments / 59 apartments booked. 100% apartments booked. |
Work Description in Building Wing C | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Wing D | Sep 2020 | 16 | 1 | 1 | 1 | 0 | 0 | 29 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 41.43 Sq.mts. ( 446 Sq.ft. ) | 4 | |
1 BHK | 41.53 Sq.mts. ( 447 Sq.ft. ) | 4 | |
1 BHK\REHAB | 41.53 Sq.mts. ( 447 Sq.ft. ) | 11 | |
1 BHK\REHAB | 41.43 Sq.mts. ( 446 Sq.ft. ) | 11 | |
1 BHK\REHAB | 41.25 Sq.mts. ( 444 Sq.ft. ) | 15 | |
1RK | 30.84 Sq.mts. ( 332 Sq.ft. ) | 15 | |
2 BHK | 50.54 Sq.mts. ( 544 Sq.ft. ) | 14 | |
74 total apartments / 74 apartments booked. 100% apartments booked. |
Work Description in Building Wing D | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Micl Realty Llp
for Project
Aaradhya Nine
last updated on
15 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |