Project overview

Aman is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800006880. Aman is located at Rjxii70tfvu3bqaxtaqv9a==. This is a Ongoing being developed by Kandur Corporation.

Aman has RESIDENTIAL Apartments with carpet areas ranging from 53049 to 53049 Sq.ft. Carpet. The Project has total 90 of which 30 are currently available for sale.

Aman is being developed on a total land area of 23006 Sq.ft. Aman has 1 Wings / Towers Aman

ProjectDeveloperLocationPossession
Buildings On Portion Of Sub Plot A Cts No 671A 662A 610A Etc Of KandivaliAnubhav Anilkumar AggarwalR/Akft9wmsc1cjdh9sg+Mkjlydbdi1nqg/Sdstlhgvfzbhlhqnk9v0pbtmgygxpiq0+Yuot5+/31Ysgsz8dk5hc62cqrjbjntfwig9avzxldrsrd0dxs9db957ixxgizef3fc6n4u0mfw4e0p6a9hg==30-04-2018 00:00:00
IbisBau Developers Private LimitedWj0vgjb3haafvuh8s2h3irpqya1sahdvojddgbh7hsmu45cnoatltbdlcozx0fz7/Eom04oocplji0zitpilua==31-12-2017 00:00:00
Sarla AvenueSandeep Mahendra KanakiaOjyapeb42wp+Kvq1dbkndw==31-10-2018 00:00:00
J-25 Icon HeightsIcon DevelopersNext To Axis Bank31-12-2019 00:00:00
Raj ResidencyRajesh SurtiMumbai Suburban07-01-2009 00:00:00
Phase 1 Shree NikunjMamtora EnterpriseCawi61d36pxzswedmy+Axfrc7supfwkguwgucsedbqpvfoipmxxzq3aflx7qmojr31-01-2018 00:00:00
AurumTrinity Consortium Development Private Limited400067, Mumbai Suburban31-12-2024 00:00:00
Delphine ChslGlasswood Realty Private LimitedMumbai Suburban, 40006731-03-2019 00:00:00
Plot No 3 Charkop Sector 8Maharashtra Housing And Area Development AuthorityWpjlb5bobunni0anmltk9q==31-12-2018 00:00:00
Plot No.2Maharashtra Housing And Area Development AuthorityT9kxkqbfifq7pq4z7gverxxvogeq+A6tknhya8phzig=30-12-2018 00:00:00
Constn Of 219 Ts And 172 Mig Ts On Cts No 128 A 12 Pt At Mahaveer Nagar Kandivali W Mumbai Maharashtra Housing And Area Development AuthorityB6lxvsg9v8clv/3Jh2iuew==31-12-2019 00:00:00
Building On Sub Plot F Of Cts No 283 A And 238 B Of Kandivali WestRna Palazzo Residents Welfare AssociationGqs8qburmyt57v4xfau0uztyhacor/Wd+Bmozjvq1dazoyiqctrhjg3u8e4pmcymw+Hud9mmqvoiwchvhlhflfr/H+Sgtl/Lktjxqj4aeoestwc4oidrx4yloyho9mht31-07-2019 00:00:00
Tanna HeightsTanna HousingFmtti3gmw6/Zgc2osnloizgn+Dkcwhke/S/Erfiwase=30-12-2021 00:00:00
Hiral LegacyHiral Homes400067, Mumbai Suburban30-06-2018 00:00:00
Const Of 586 Ews 234 Mig Tenaments On Land Bearing Cts No 1 C 1 1 Borivali West Mumbai 67Maharashtra Housing And Area Development AuthorityJlzwhifshsva/T7jdvg2xg==31-12-2017 00:00:00
Kandivali Shiv Krupa ChslNeminath ConstructionD5ol0idjxoweohn2uzcxxg==31-10-2019 00:00:00
Anant BhoomiM Construction Company & Associates6Bkkv2tt7gowgjbcb6ncyg==30-12-2020 00:00:00
Kanyakumari HeightsKanyakumari EnterprisesTxnfm9zppsfiqsjzkf2pnq==31-03-2018 00:00:00
Jeevan HeightsJ. P. RealtorsFeyazcguwftkkgx0356yla==30-12-2020 00:00:00
Dharti SraMilan Nemji GalaIkzvcvvxlsitcmotqhxmum3gqzxtkjr+Iyzx33lfyp8fozgfoapzblalf1pjh1cnfsfxoztzqi8jqy/Wzfrhppcs+Vdyqcmmcloal1bdjyk2ja6jw7d5bpsk0mwarditnlojvh4zwp1ua6x4hfphtq==31-12-2017 00:00:00
Siddha SeabrookM/S Brizeal Realtors & Developers LlpC+R68zd8yuulc2wapwrls4mxf+Ggijoh/5F/Dgdee24=30-12-2022 00:00:00
Kandivali Satyam Apartment Chs LtdJinam K2 RealtorsFhk9bfaletlfzxfpgogczg==31-12-2018 00:00:00
Zee SahyadriZee Com Trade Private LimitedSu36ti1mw8opc9rusvag/Nqtz2yzs7hazdsjr018euu=30-12-2023 00:00:00
Arpan Chs LtdParshvanath Superstructures Private LimitedX0w8nhbp+Zeh6fjs7+C9za==31-12-2019 00:00:00
Shree Prafull ChslShree Shyam Developers3Gp9jzxrdwbbalcfyyfc70udxe6mjsxceiskhaefpdc=01-03-2021 00:00:00
Building On Portion Of Sub Plot D Cts No 625 A 4 625 B Pt 627 A Of Kandivali West Mumbai 67 East And West BuildersR/Akft9wmsc1cjdh9sg+Mkjlydbdi1nqg/Sdstlhgvebid8nkqfmoi6hlkocg1zksd62x7k1gwvbtjaafcjdooat4vybwb5tzzfapnznlzwijiyz1k7fbaz9etbtxbps30-12-2023 00:00:00
Radhakrishna Chs LtdWestin Sankalp Developers9Lcdzjksclysovny5yxrwsq5+Yvbpm+Zwhoxagisdc0=30-12-2022 00:00:00
Kailash EnclaveShrreeya DeveloperssYelhynrtbyprvz3r0kza8w==30-06-2024 00:00:00
Khar Kalpak Co. Op. Hsg. Soc. Ltd.Precons Developments Private Limited1Jkkfs7chqb2hmog8qtx9akqoo/Z5yzlg2pihvreaws=31-01-2021 00:00:00
Kavya Shree LaxmiKavya Kcd DevelopersAtbyrxlhltyqeex55fxdtlzojya+5L3vpfrsdlw5updkngfo07ve3g2gngyspx5l30-06-2021 00:00:00
Medha ChslC H Patil And Sons LlpJii6/Yhox8dmnls4ybl2lq==31-03-2019 00:00:00
Gyan KutirSungreens CorpD505wblxkpaabsbgsw8k/G==31-03-2018 00:00:00
Charkop 1 Abhilasha Co Operative Housing Society LimitedCharkop (1) Abhilasha Co Operative Housing Society LimitedF4iudllkg+Blhvzg70hf9vs3vmusa12nes/Msiifgus=31-12-2026 00:00:00
ShreejiaikyamRushabh DevelopersGr3dzmqbw0i2ox427e7z0g==31-12-2028 00:00:00
Puja HeightsC G Housing Infra Pvt Ltd C G Housing Infra Pvt LtdMumbai Suburban31-03-2019 00:00:00
Modi HouseModi EnterpriseAcm+1Znrggsh3xmort7/Da==31-12-2017 00:00:00
Neelyog AashiyanaNeelyog Construction Pvt LtdHsvfzokqe+37Spz4ic9jflmpc/Wejemrpa0v4il2xnw=30-03-2023 00:00:00
Ruparel Skygreens IShree Siddhivinayak Infrastructure & RealtyLoqvsgwby5xpu+Epmlpfkllqhbrky8pzy6sy1eepxqgbgqks7tou5kxtnbv+O1fiwlzgbib/Ak+K9qta+Ft+0G==30-12-2022 00:00:00
Meridian Courts Tower 2Vijaykamal Properties Pvt LtdMumbai Suburban, 40006730-12-2024 00:00:00
Patel Associates A/C Jay SonalPatel Associates A/C Jay SonalM5ygmb/U8ndjqbl93p5whbxpihzgaqepjzlqqnodmuwczz0ptrfjvdawucicxxpa30-06-2021 00:00:00
Burhani BuildingMs DevelopersG52bzvgmqaao3zzkmr2euyclg4xx8we4rrd53h4p8o4=30-12-2020 00:00:00
Bhavya HeightsBhavya Infrastructures India Private LimitedErvnqdxjbkzfhawd4cnhbw==31-12-2019 00:00:00
Kamala Chs LtdPravesh Kirti Kanther5Qc04wasfzuso3p7sgjmvsbenwtp75gt8le1vziu9gzfi1pgcfklfjvb5cw/Sijquos6hstvedfujlk/P35wvg==31-12-2024 00:00:00
Ajit Mulund ChsYug DevelopersN45styb2ggtsbc/Unvecxjk38jicncsyv4lflr8ldu9sn6e4ihdjcudicekbu9mb2abkvhuzriswvxabdeymda==31-03-2024 00:00:00
Neelyog Aashiyana IiNeelyog Construction Pvt LtdJebjyyrtw1a8c0wt/Z+Pcq==30-06-2026 00:00:00
Kandivali Geeta Sadan Chs LtdMs Prathmesh Landmark Consultancy4W/Ktz5h4jcbpzmalajtow+Gcffinivmjq1vcft/+5F9mpxex80jlm2yjib3ewl530-06-2019 00:00:00
AmanKandur CorporationRjxii70tfvu3bqaxtaqv9a==30-06-2018 00:00:00
Royal Samarpan Phase 1Shreeji ConstructionR/Qcqi7jm6/Dre3jog1isw==30-06-2021 00:00:00
Rite DivineRite Developers Pvt. Ltd.Ldhz/Stfa5yq11phwl95jbtootxezppome7fk1wituy=31-12-2017 00:00:00
LoginBombay Slum Redevelopment Corporation Pvt. Ltd.Hyzqgxqr3nfs0w31ifmvrw==30-09-2022 00:00:00
Rite BlissRite Developers Pvt. Ltd.40006730-12-2021 00:00:00
Parekh RadianceParekh Buildprojects Private Limited46O5e4tznbsxzf2xdpvcda==31-03-2026 00:00:00
Vaswani Vista OneVaswani Projects Private LimitedIq1e07esei9jmxssnj+Sig==31-12-2026 00:00:00
Jaswanti JewelParadise Construction CompanyN88qtb6oenmybtabkjsqng==31-12-2027 00:00:00
Silver AvenueAfroz SyedMumbai Suburban, 40006731-03-2019 00:00:00
Ruparel Palacio Ph IShree Siddhivinayak Infrastructure & Realty7F5nylu1ccu6x6fhszbdlq==30-12-2023 00:00:00
Redevelopment Of Existing Building No. 5 Known As Mahavir Nagar Tri-Star ChslBharat Realty Venture Private Limited9Snp2tgr8fah0kdy0prudqkdizxnc8nt1e+Bj056eutjzpqj1hf79x9hq/8Rveud30-12-2023 00:00:00
Adarsh Nagar Sra Chs Ltd.Bombay Slum Redevelopment Corporation Pvt. Ltd.Hyzqgxqr3nfs0w31ifmvrw==30-03-2023 00:00:00
Prathamesh EliteShree Sainath DevelopersVnmhgarqiagra615azgeia==31-12-2026 00:00:00
CastaliaTriax Developers LlpCtw78uivbxiumussp7y6eqkaof4mtz4dgg3rd2byy5jxo5bi5ks8lhgsmg2e5ysb31-12-2025 00:00:00
Solitaire IiTulsi Enterprise Joint VentureYxamuehwvgiczbuc7ztopebpzpk3j/K15min/Hdxlni=31-12-2018 00:00:00
Gabadia HeightsGurdeep, Kuldeep, Nirmal, Jaswinder, Ranjeet3Aueva70q4o3v2ump4g1im93gokxefoaofm32y9pac5i62ft4xhl2fe+T6iityp728-02-2021 00:00:00
Avenue Wing BDharmesh Constructions Private LimitedW8ggz11b+Pk+Fymwrrptewrxbmqahu2uyf+Dymoedti=30-06-2021 00:00:00
Skylon SuburbiaSai Krupa DevelopersAcm6ts5rq4k6g1xivhdqdq==30-12-2025 00:00:00
Modirealty WisteriaModirealty Developers Pvt LtdKtwj80f/Y+L1yi3tmmgmk0owi4ri9ozoucab98xlq6hdxyluolwrtdspxmowekio31-03-2026 00:00:00
Rashmi SheelaModis Navnirman LlpKfbooxgjddgqi4ejfgdpgw==11-02-2021 00:00:00
Ruparel ElaraShree Siddhivinayak Infrastructure & Realty6Dqeth/4Oqgyduroznq5xq==31-12-2019 00:00:00
Shriji HeritageShriji Apartments Co-Operative Housing Society LimitedPi4yrtammxxsodhnolngi2chsctnqqs/7V53ckmoh2u=30-11-2020 00:00:00
Kalpavruksh Garden IiiMahendra J Vora & OthersBk/0Svgkxv6euhzlqf3n2ht9lgnjqtkd6thpwtlrgrdf4q6ko+Vqnpewbnhgqshm30-06-2021 00:00:00
Meridian Court 1Vijaykamal Properties Pvt LtdNvdal85eoexmtkquvk2z6a==30-12-2024 00:00:00
Ruparel WestskyRuparel Shreeji Construction Pvt LtdJ2cebx8yi6ie9d5p3x8nzo+Cicc6t5kciikfqkbp7wm=30-06-2023 00:00:00
Xpoint Redevelopment Of Prem Bhavna ChslRodium Properties Division Of Rodium Realty Ltd.Lsmvw3mmz3ibfmq/Fblddnpgouphjvotzl4kegjtp4g=30-12-2021 00:00:00
Raviraj RoyalM/S Raviraj Developers+J2yascw4lxf/Vi5rs9b9w==15-05-2022 00:00:00
Avenue Wing ADharmesh Constructions Private LimitedDjiag0juo5kmbeczskk3gnfbw2mv0ow8m/Xu0kdfijsqcrhuupypnwmj54mxxecy31-12-2019 00:00:00
Shreenath EnclaveShreenathji Infracon Build Pvt. Ltd.Phrblypjukm9e3c/Knflsq==30-11-2025 00:00:00
Rock HighlandRock EstatesGap1agwr2fqz4kcziotwoqppakor7zryvnjnxqah+Lci1nmzamed86wf79niczaga0wg9hzynutwm7uzf0hhyg+S8nhuof641hyhz4symwlzgq6j8u49tb4px7xrvc0ja8szcx4toc3noqn/Hlnhpep3kc6dgrs2zxxmswov+G8=30-12-2026 00:00:00
Gaurav PalaceRavi FoundationWwp/Dxvxkix134rbknaima==31-12-2017 00:00:00
TandiceManish Mahesh DholakiaZvgynoydf6yagwn+W3zmd3i0ufqlianmbqdla6mk+Jw=31-07-2019 00:00:00
Gabadia HomesGurdeep, Kuldeep, Nirmal, Jaswinder, Ranjeet3Aueva70q4o3v2ump4g1iooogcbf/Ychw0b5retgazvenzpstadmnzsc4suvdkzh28-02-2021 00:00:00
Swami DarshanGirish Rupshi Gada386Qadxzspmomzeibidysg==30-12-2022 00:00:00
Charkop Jinprem Co Op Housing Society LtdCharkop Jinprem Co. Op. Housing Society Ltd67Oxj+Pmytjys9vqjqkqo6xbwkiu9dzfkndiphdssamxwjlsg7gpxquvfpvq0gk/30-12-2021 00:00:00
73 East A3uqhgqggce3yom4inmedyrtkb5ti9p/Lszkb+Ostj+Frs9h1fiokpeaun8bicb9gjsrxguvnao8dmkpo2wgpq==30-12-2025 00:00:00
J-24 Mahavir Nagar Chs LtdKonark Rajendra ShahMzmywkc6e4smgehgkyu4/Q==31-03-2025 00:00:00
ArthayaSri Artha Buildtech Private LimitedPuvvbyjy2fzmmhflcuecjg==30-04-2028 00:00:00
Sai EleganceNirav Thaker Buildcon LlpEmckpbywprar7tibvnh/Pa==31-03-2026 00:00:00
Hum Sub ChslShraddharpan Developers7Xaea9ajaa2jslhgot/Nu+Arpegtgqgtyddqmrmjczi=30-06-2018 00:00:00
Rite CelestaRite Developers Pvt. Ltd.Nmhpadwahhqxhkm3vj1daq==31-12-2017 00:00:00
Rudra HeightsSwayam DevelopersMumbai Suburban, 40006701-01-2021 00:00:00
ShantiniketanNamorealty And Infra LlpMn8vu5gi48bnm+Xvcj8uzuy0qlsepw6n9bcuhiougk8=30-11-2022 00:00:00
Anant TaraAnant Chhaya DevelopersQl+Domzeuwnblfxa9r3h9ep9njwdgj+4Yihjfoxeggq=30-06-2025 00:00:00
Kush EleganteKush Realcon LlpKdpyy+68Xfz13tbu4b2fyundan0bgiwft7dl55yaz80=30-06-2024 00:00:00
Amrut TaraShree Ram BuildeersKdj/Furx60/Jvuh1si92pq==30-12-2023 00:00:00
KalpvrukshIkira Build Tech LlpMuj0ctjldgjpjid4jlhsoq==30-06-2021 00:00:00
Sugra Heritage Chs LtdMs DevelopersVww6vj8adfruhxr8niizsa==30-12-2021 00:00:00
Kailash HeightsRanjana Construction Pvt Ltd259Mntzuesos7fpwygalqq==31-12-2019 00:00:00
Kavya Kcd PrestineKavya Kcd Buildcon LlpSdefroa+/E4mzjhoifqkcq==29-02-2020 00:00:00
Rashmi SadhnaModis Navnirman LlpYb3q5cbjvl52q1tkwouhvscmd9bndo2kl3ak01zupbolcrbt/I9aojgewvn+Rd0puuy9ebauan/Gngptgtum5tzwfap7mkzalyljlzyw4hxiuipfegjpsgfucivp6nfi11-08-2019 00:00:00
Sudha AvenueM/S. Chamunda EnterprisesWhhmhstw9skx0+Xujgr6eq==31-12-2018 00:00:00
Shree Abhishek Co-Operative Housing Society LimitedDivya Enterprise8Om94yiilyz9uaxfevlpbpuzvd+Os9cyn/N2r4jqitu=30-11-2020 00:00:00
Ghansham HeightGhansham Properties4Uo3aaknooxyymrgmsyd2a==31-12-2017 00:00:00
Kandivali Basant BaharWestin Sankalp DevelopersIkx2rojh+L65weows7rryg==31-12-2023 00:00:00
Ambrose HeightsDadamiya Infrastructure LlpYlbascrpjinzsf6qnmqdnw==31-03-2027 00:00:00
AlokShree Dhanesh Buildcon51Jfsvflthebz4omgg7wva==30-09-2026 00:00:00
Damodar TowerJaanvi DevelopersJ4lorkh6s6voualrm7byhmuxvnhdqpdbq3bs5shwtzks8xyg51atgnq5bu/Foctq/Hfy04gm8qng3eqxpz7/Heg1emk/Mxn9xqfshumrxmg=31-03-2026 00:00:00
Shreyaan ResidencyVidisha Real Estate Developers Pvt LtdCn3sr51/Mzlgas7igd1imw==30-09-2027 00:00:00
Madhuban HeghtsHiral Real Estate Developers Llp5Mheqchoptttrc//5Wchyg==17-05-2025 00:00:00
Building On Sub Plot A Cts No 283 D Pt 287 A Pt 287 B 1 And 616 A At Kandivali WestSkyline Construction Co.Gqs8qburmyt57v4xfau0u9+Nb3au8hd1e0lbgugkffvbpby7frz48z3a9nayldsusfayxxm0wn2hzakh7s9thjqukk2zebqdujjvatvqtki47t+Jwzazgscmhky/Mhxh31-12-2019 00:00:00
Raj HeightsShree Raj Developers401203, Palghar31-07-2020 00:00:00
Spring DaleSunrise AssociatesPcjo/Sf4cn17y1ytom4fxspk4belch9pc033t76jdu8=30-09-2018 00:00:00
Hum SolarisHum Developers Private LimitedTr1frv94vtt6zncpmv9+5Jwgjtgxgputvzm5lptmldk=31-12-2026 00:00:00
Sai DivineShreeji DevelopersXfr/Iyhimj+7A60hb+Qyy/Zfqkrrfxbrd8xi8q7+Xbfzbj7g797cypbjquk5pxru31-12-2026 00:00:00
Shree Laxmi VandanPragati Land DevelopersFrpohqoufa2l0npg+Tydxw==30-06-2023 00:00:00
GAURAV HEIGHTSMAHAVIR DEVELOPERSS No. 36, H No. 401-06-2019 00:00:00
Anshul Heights C WingChandrakosha Kontructions Private LimitedRbtmhekv23sqxxjfm4tklg==28-02-2021 00:00:00
Dtg Aspire Dhariwal Thirani Builders Llp30-06-2029 00:00:00
Jay Co-Operative Housing Society LimitedMs Developers31-12-2028 00:00:00
RudraMahavir Land Developers Llp31-12-2029 00:00:00
Sigma AmberDrashti Realtors Pvt Ltd28-12-2028 00:00:00
Project Details
  • Project:
    Aman
  • Location:
  • Rjxii70tfvu3bqaxtaqv9a==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    Kandur Corporation
  • Phone:
  • Address:
  • Hafizi House,
Project RERA Details
MAHA REARA No: P51800006880
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Atul A Rana
Funding Bank DCB BANK LIMITED
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession 30 Jun 2019
Litigations No Litigations
Last Modified 16 Oct 2018
Last Retrived 13 Feb 2026
Aman QR Code
Aman
MahaRERA - P51800006880
Apartment Details & Configuration
TypeArea
RESIDENTIAL4928.39 Sq.mts. ( 53049 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Amanlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
0
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
0
Landscaping & Tree Planting100% completed
95% Complete
15 Trees Existing As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
0
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
0
Water Supply
0
Buildings / Wings in Aman
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Aman by Kandur Corporationlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

23006 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

90 apartments in total
Total
90
Booked
60
Available
30

Saleable Area Statistics (Sq. ft.)

4774427 Total
Total
4774427
Booked
3182951
Available
1591476
Total 90 apartments in project. 60 apartments booked. 66% apartments booked.
Total 4774427 Sq.ft. saleable area. 3182951 saleable area booked.
67% area booked.

Aman

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AmanJan 1900101010084
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL4928.39 Sq.mts. ( 53049 Sq.ft. )90
60 Booked66% Booked
66% Booked
90 total apartments / 60 apartments booked. 66% apartments booked.
Work Description in Building AmanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kandur Corporation
for Project
Aman
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation