Project overview

Auralis The Twins is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700009177. Auralis The Twins is located at +Dxf2i8gozq4k5wncymckq==. This is a Ongoing being developed by Deep Homes & Constructions Llp.

Auralis The Twins has 2.5 BHK & 3.5 BHK Apartments with carpet areas ranging from 1244 to 1008 Sq.ft. Carpet. The Project has total 682 of which 85 are currently available for sale.

Auralis The Twins is being developed on a total land area of 90636 Sq.ft. out of which 14140 Sq.ft. i.e 16% is reserved for recreational purposes. Auralis The Twins has 3 Wings / Towers Rental,Tower-1,Tower-2

ProjectDeveloperLocationPossession
Laxmi KeshavAditya AssociatesAiootvwknmwvawjsh1t2shcerashzzd+Vvufqo+X3kit/Aiukd18wmc9jsyez5xiebu0z08jgohaj8rjggoapq==31-12-2019 00:00:00
Abhijeet Co-Op Hsg SocietyContinental Maniratna Builders &Amp; Developers400602, Thane30-11-2020 00:00:00
The Vivek Flat Owners Chs LtdYash AshokaQcgpm0tc9+Spob1abuwfj/Dvv2no8abqk5ssofeqajietxbb38qrw9o3z0t5n0copvxwj4x8mwlmdwi33ksomg==25-12-2022 00:00:00
Madhuban Co-Operative Housing Society Ltd.Mahesh Shriram BorkarP9dsv03zmv7+Ngctrwoz9asvyvjsyjr54mvimhxnrdempcfx2vmvd7ciowje0gvh30-12-2020 00:00:00
Shree Krishna ChsVaibhav DevelopersC8bjqxgwo1fvz2enmax3sq==31-12-2025 00:00:00
Highland Sky Towers A BuildingProvidence Realty LlpYblpbmol6kqlnsctlzm+Hdi4iw+7Ad5tdj/Fvec3b68=31-12-2026 00:00:00
Laaman Industrial ParkLaaman DevelopersDp5plqpku8yvnaqhy3bz9g==31-12-2024 00:00:00
Shyam-KamalManvaibhav ConstructionsTxoxrrep5smjterikgpq6ugoqh8c4xm0qfawiu2s2ks=30-12-2021 00:00:00
Automatic Co-Operative Housing Society LtdJoshi Enterprises/1Mqh5jkxgmg/Coxmynfpw==30-06-2021 00:00:00
Nalanda ChsYash InfraWlsevfoftbcfp4mp4rfoxpa0grnuysjzxloklfbontvtljt199lisz54+Dkzyqmz28-02-2021 00:00:00
Kamdhenu Prasad Chs Ltd.Mahesh Shriram BorkarEkuqxntuk+Iodeinsl6whq==31-01-2018 00:00:00
GiriviharAbhinandan EnterpriseNjmntqdegqntrp+Ptq1nmg==31-05-2019 00:00:00
Rohit Co-Op Housing Society LtdVedant Construction7Anzu7s8l00fxpcsdhbtex0ux1+Dyg7ces6xey5ztar3ygg5e8nklnnpwtsbpcfztnd1e81nyxt0htdnzibzcq==31-12-2024 00:00:00
Empire HeritageLakhani Builders Pvt LtdRgql8bvirw4hdmfanz1p6g==31-07-2027 00:00:00
Empire PresidencyLakhani Builders Pvt LtdTierpnapb2kdkzzz9p+Qhw==31-07-2025 00:00:00
Vakratunda ChsArya EnterprisesZtdik/Yxaaagucrn66xolg==31-12-2025 00:00:00
BeliciaRajshila Construction LlpGpiiipbgp28qskvunvn2lcw9pfblsynxy1bkhlcwsmit3+Ns/Vep38ztx8nwd1zrzpq+Omldr8sdejmxnqvlrbpvtcjntel9cgwszvl8oeu=30-06-2028 00:00:00
CenturionShree Anant EnterprisesWfa3bh8efsrf2jzujt+1Cg==31-01-2026 00:00:00
New Kirtikar ProposedChaturthi Developers40060201-07-2025 00:00:00
Shanti KunjShreyas EnterprisesSbqnk/Pb/W5kkfo/Hyi2mw==31-12-2017 00:00:00
AtlantisAshwamedh Builders & DevelopersIvlvpwdqdft65dfycojz9pwn3x3gu2t648gbjpp4ve4=30-06-2021 00:00:00
PadmalaxmiKedar Bhikaji BapatCpr9o8d9/Hbpynbt5xwsw/Xd7blhhh5txvx273z4mea=31-03-2018 00:00:00
Ashar 16 Wing C Phase IiiMs Ashar RealtorsQyr9lprdhw12bqlsnqsjmtg6udcruoajouzcztrxlya0dfvepfaec+Axmr2e1zelntajhbqdfgzkyrjnouludg==31-12-2018 00:00:00
SushanVenus RealtorsY37et+8Av92cc3ubutaoclgo4i+Kjb5srtgti0cgxq0=30-12-2022 00:00:00
Urban VillaYash Infra1Gr8xjq7ee03whct/Maoag==15-12-2022 00:00:00
Siddhashram Chs LtdStandard InfrastructureQztlml1zhln+Itinf8vngq==01-10-2018 00:00:00
Empire TowersLakhani Realty LlpI8yttrkcrvg9e4frywvuqg==31-07-2024 00:00:00
CentrumShree Neminath BuildproZ4uibr6etnbbkiinjiauka==30-12-2023 00:00:00
Sandhya BuildingS D Bhalerao Constructions Pvt Ltd - SandhyaKi+3J2zwezzxzlyhwnxbxuk06xtxc3uiz2pr6m+Azsu=31-03-2019 00:00:00
Rameshwar Co-Op Housing Society Ltd.Aditya AssociatesMek/Ekyfrcycxboqx0c0uctqomhzyaq70k/Lwvk9lw0hemueqddnxcgrnwbfx7oh10-03-2027 00:00:00
Blue BerryAshwamedh CorporationUfzgcgzpcc5hyksnacuxg4jlvwu7a5oyqtgcoqbm0dnorhzpessm5ogk1cc269ba30-06-2026 00:00:00
Veer VishwaVeer Life Spaces LlpPzam9sosrnlebhnvpkyu3xmereefhbz7fnqnkruzgeq=20-02-2027 00:00:00
Ashar 16 Wing E Phase IMs Ashar RealtorsDcisp2r4tnravmrpgiz/8Gj0lbwyfkbcyn85vt9emmoyi8vd+Hpmr7lyu/Ccen8t31-12-2018 00:00:00
Ashwa PlatinumAshwamedh Builders And Developers6Isxyewy7qqtx/Iotpveog==31-12-2019 00:00:00
Ashar 16 Wing A Phase VMs Ashar RealtorsQyr9lprdhw12bqlsnqsjmtg6udcruoajouzcztrxlya0dfvepfaec+Axmr2e1zel0bmhdmsag10ayozx3jzoiw==31-12-2018 00:00:00
Auralis The TwinsDeep Homes & Constructions Llp+Dxf2i8gozq4k5wncymckq==01-03-2019 00:00:00
Nandishwar PlazaNandishwar Cons CoB3yie2onrb67neq9sbwycivhpvl0kiqaehtbxvpsxgi=10-08-2023 00:00:00
Gautam Co-Operative Housing SocietyMahesh Shriram BorkarEc8voyi4zudwxtmxfqdyta1glwigygq3hwicv+4Cjxu=31-07-2018 00:00:00
Morya HeightsMorya Infraconstruct Private LimitedYw5twfhrbtaarhu3odrjxw==30-12-2024 00:00:00
Sahakar NiwasJnm EnterprisesA+Vkqhamy9hbjuuv+Fjg6z+Hxbx0wauydiaohr8h/4E=31-08-2018 00:00:00
Opal SquareShuban Buildpro LlpTnjizpkcv0lupiylieteda==30-06-2019 00:00:00
Eashan Dattaprasad Co Op Hsg Society LtdSripad Vallabh VenturesNfcrzioaxtuxpgb3w5murwk3ekwtfq1frh+6Hat2iqe=30-03-2023 00:00:00
Sai Lavkik HeightsSailavkik Realty Private Limited8Widqbxevlcsqgicezhc+Rp9ly7qefq6e/6Bnaf3abo=30-12-2021 00:00:00
Ghantali Sainath PlazaKalpataru EnterprisesRgq1njssk+Ult+4Blx8em9nonpkr3jjnqt52x1jzkc4=10-08-2022 00:00:00
Shree SadanShrinivas Dattatray KaleL7bjbkmb11f90ax1u/Pfdw==31-01-2020 00:00:00
Rajesh Co-Operative Housing SocietyJoshi EnterprisesThane, 40060208-08-2019 00:00:00
Wagle Trade SquareSquarefeet Real EstateDthpzmzlg+3Qhdhxrqowsg==31-08-2027 00:00:00
Thane Shivam Chs LtdMahesh Shriram BorkarD2evvcnwulayyxqtbiiwkdis6gwi3hdj7a5c8mchfi5lzynwscrszvpif9ewz6ayskiu+Ckulds20bzj1m+Przxl2vndi32lq7svsvwoczj1iuf/Eft/Fq09tx4yfu0i4gqzrxi4wogc4sbhw79e3w==31-12-2026 00:00:00
Seasons EliteSai Mahavir DevelopersB5hnphkv8xdmxtxrvn+Wdwyw52cfdaqyodggrbqjcj+Dnihpfy/Vp18rivgin0qgta8ukpvrgder/9Is2ghiig==31-08-2019 00:00:00
Om Shiv Samarth ChsShree Saibaba Constructions Private LimitedSuri/9Jjlasgbrwef66i1q==31-12-2019 00:00:00
ShivkrupaAnant Arjun Madhavi+Ergnd+8Qudhbi4x9efycq==31-03-2018 00:00:00
Shree DattaAadyashakti EnterprisesNvjkd1fkptxs074pomwcaufsuampoebv0zb0/Uatrx0=30-12-2022 00:00:00
Priyadarshani Chs LimitedAniruddha Group Shilpali ProjectSsfsysf+67Yb1q5dmsap7q==30-12-2021 00:00:00
Samrin HeritageSamrin Infra Private LimitedIw3ki2u8kgrx3p0pk1suuw==30-12-2023 00:00:00
Dhanashree Co-Operative Housing SocietyL. K. Realtors400602, Thane31-12-2019 00:00:00
Laabh NeelkanthLaabh BuildtechY0dzrlmno95ql7nigttqww==31-12-2019 00:00:00
Godrej Alive AModella Textile Industries Limited40060231-12-2020 00:00:00
Ashar 16 Wing B Phase IvMs Ashar RealtorsQyr9lprdhw12bqlsnqsjmtg6udcruoajouzcztrxlya0dfvepfaec+Axmr2e1zel0bmhdmsag10ayozx3jzoiw==31-12-2018 00:00:00
Redevelopment Of Parijat Building Of Sanksriti Nagar Coop Hsg Soc LtdOjass ConstructionsGw8betc32dinsqp8nz6hmjgx0cvf3g9dlvizsjqw3df1qfnjl9vn1a4mbe/3Ltzqy90vns2zblzodntf4h7ub484t9mnjck1bllttibyix0=19-12-2021 00:00:00
Primus Business ParkHemant KashikarKmtxr1pmy8duqya6s8n3/G==30-10-2022 00:00:00
White RoseM/S Eeshan EnterprisesH6siidk71pvzzcy5zawzuw==30-03-2024 00:00:00
ManeeshaPadmanabh Developers0Rmis2xl+Truypbxulkhhlzrpsr5gt+Uekeczz1w2vvcfumfbzpmiagm4lyyr6jb30-05-2022 00:00:00
Geeta PlazaRoyal DevelopersVzlugvh2ufmwygvprczem+Kvzhfmajtovy924juspli=30-06-2026 00:00:00
Highland Sky ArcadeProvidence Realty LlpRwp8zc5pu6nnrlndmhqo2gdqivcm7v6lptfermcewpu=31-08-2024 00:00:00
Rahul Co.Op. Housing Society LtdSna Build-Tech4Ssjcyxj1gw4hhg3gkopkq==15-02-2025 00:00:00
Highland Sky Tower Damani B BuildingProvidence Realty LlpYblpbmol6kqlnsctlzm+Hdi4iw+7Ad5tdj/Fvec3b68=30-04-2025 00:00:00
Mai Kripa Co. Op. Hsg. Soc.Ojass ConstructionsVmbnvnk1ewxivhbrdlaam2cmvxdvzix4b/Lajp6dwmm=31-03-2024 00:00:00
Veer HeightsVEER LIFE SPACES LLPFinal Plot No 101 Part T.P. Scheme 130-04-2028 00:00:00
Madan VilasIshaan Enterprise0Gqnj6vj0il6ngertdaabq==31-03-2018 00:00:00
Ashar 16 Wing D Phase IiMs Ashar RealtorsQyr9lprdhw12bqlsnqsjmab41brxjs/Zw+Rxsuq1tzqkyl4pzkpfftpub9q0kafi31-12-2018 00:00:00
Thana Co-Op Housing Society SopanAditya AssociatesDkv4atn2xql1npkg6n14gq/3Fqanugzoiki8ldiuvrdy52rqbvan1no+Wlhwcqwklu93coxoyxxzzw3q+N2hxba5svqecfgp3umxqfqmqbjx1airstzg8d9i03viuzcr31-12-2019 00:00:00
Valencia ParkPrakash Trading CompanyA+Tmlm3vjowz5zqiin15ng==31-12-2019 00:00:00
Tropical EliteSchema Enterprises Private LimitedGycphfiaugcg3vuzo0u1piafaxr3w1xogcqfv0lcpbw=31-05-2018 00:00:00
Orchid Square Phase 2M/S Squarefeet Eco Housing Llp+O6zo+Fd/See9dqzbypfcq==31-12-2018 00:00:00
Ashwa AnnexAshwamedh ConstructionQwdraiczn3tbiow7+Fjq7w==31-05-2018 00:00:00
Anmol SapphireM/S Ekdant HousingK+Viu63fpckmv1sq2gdrmg==01-08-2019 00:00:00
Oasis RoyaleMagestic Premises Private LimitedHo8ra21x+Ugiki4bqopmtwv7uzbtotynz4u3e/Gmgk4=31-12-2018 00:00:00
Redevelopment Of The Bombay Thana ChsGaurang Properties Pvt. Ltd.Shivaji Nagar, 40060231-12-2019 00:00:00
MaithiliSharda Vastu Nirmitee Pvt. Ltd.Rqq/Cxqzvuwl9uket15kfg6cyvfqhkb7bpfhvcvrjfgm5uoalv5quskanqgvi4xu31-03-2019 00:00:00
Indraprastha Co-Operative Housing Society LimitedAgile EnterprisesW03w7a+F7z/Xkb7axrhgum7pyjwvx704e7h39upq+Zq=30-12-2023 00:00:00
Bhairaav Milestone Phase IiSharpmind Consultancy Services Private LimitedUd02fd2krh2hvc/A3yxbzmkktuogisz+Yvzlek01vzedzsbslab4w5q5uuvai/Dk30-12-2022 00:00:00
SindhusmrutiYogiraj Powertech Pvt Ltd0Vws4tyz14hgmqmk6fxmcrzfgdbnxzc0swl3m49seqe=30-11-2018 00:00:00
Ashar MillenniaMs Ashar VenturesGd7didee3xbn7cvvdgvgbffdod61o8cqqvvaby3t7x+5Zv1heulryioersfxmymmvftsxztpoklvsltymj+C2a==30-06-2018 00:00:00
Anand Bhavan Co op Hsg.Shri Swami Samarth Developers219 B30-12-2024 00:00:00
TRUSHNA CHS LTDMahesh Shriram BorkarOriginal Survey No 337, Final Plot No 36230-06-2024 00:00:00
RhythmAradhana Lifespace LLPCts 247/230-06-2026 00:00:00
NEW THANA CHSGAURANG PROPERTIES PVT. LTD.Eastern Express Highway, 40060223-09-2018 00:00:00
Raghuanand ChsVijay Sawant400602, Thane30-06-2018 00:00:00
EOS IT PARKADYAH VENTURESPlot No A-21331-12-2027 00:00:00
TRIVIDHCosmos SKyline Green View LLP60/A28-02-2029 00:00:00
HiveMehta RealtorsPlot No B-21 And B-2431-12-2027 00:00:00
TIMES SQUARESUPPER SQUAREFEET INFRAVENTURES LLPPlot No A-11 And B-1731-12-2029 00:00:00
Suraj Rama HeightsShree Rama Shree Construction Pvt LtdAwqux7y31u/Ggpc6lqr0ts3xr1tqq/Ebdcvpuwjh7q0=30-06-2021 00:00:00
Mauli Krupa ApartmentJayvijay Builders And Developers9Hqpg1wxrmvkqjgraszvrw==30-09-2018 00:00:00
Kalika HeightsSanjay PandeyPanchpakhadi01-01-2011 00:00:00
Dev AshokaDev Land & Housing Pvt Ltd+Fwetpmxybfl1ldugkmff+Xy8tmaqn55y8mdvrwtgqc=31-05-2019 00:00:00
StarlivingTheme Developers Private Limited39Lh8hhxdeaqr5niqkeqs5mgczyiq01bcn8jq4ltozsr0axripg8udwpq43kw4qj89y6xfzlykeasjnhpeqjag==30-12-2025 00:00:00
Sapphire HeightsSpace CorporationC156ucvzk76+Vxcjdx26ug==25-12-2024 00:00:00
MaansarovarMeridian Buildpro Private LimitedA6pdrbe1xfnfgaslkobibhjoul7y41/Ixjho13/Elsw=30-12-2022 00:00:00
Matru MandirParnad Anil GuptePltlo9oatryvqxtqe3+G/1Odcweatx3ebnw3ko1vs+E=31-12-2026 00:00:00
Saptashree Global Tech CenterSaptashree Tech WorldQx8riwd6st0avi3z6wxj6isjgxmhfawt8xt6eqbmcyy=31-12-2028 00:00:00
Solanki Co-op. Hsg. Soc. Ltd.REAL HOMES DEVELOPERSFinal Plot No. 112 (Part)31-03-2027 00:00:00
Hks Silver PalaceHk RealtorsC3uxpdjf7zhqyqwj4ovkrb+Sehevxkjsarw2m/Fkzdk=31-12-2027 00:00:00
Arvind Co-Op Housing Society LtdAditya AssociatesCiad3ktzxrgo72mxr9id9cfi0alksnc4q9uhv1wplq+Hijrrt9t5kmzgjdcwdeybipgb4qk0j7clhy5jggnbyg==08-06-2027 00:00:00
Suasha Co.Operative Housing Society LimitedAnantnath Enterprises2Zwkihiqjb708+Ssbanuwcvkwouv9vakiagvc3zzmmtsreeehs8qusjudzf8vgvs3nu76tpkrpmfdytwgp45nw==31-12-2027 00:00:00
Narsinha Co-Op. Hsg. Soc. Ltd.Real Homes DevelopersDzls1npuzaclcipmvrrcl8txdbh3aaxteh5qa6qxgj5klo/Srkhfctep6ksimq4y31-12-2027 00:00:00
Infinity OneVeedhan BuildtechZ09vvlzw3qcnuadn8qb+Rg==29-02-2028 00:00:00
Adityaraj SahyadriAdityaraj Builders And DevelopersDjm1juyoaumtaxi09du+V8wtrz5swz7hhwhj1gu9+Eo=31-01-2029 00:00:00
Krishna DhamKarma ConstructionThane, 40110531-07-2018 00:00:00
Dream PragatiEmpire Horizons Private Limited31-12-2028 00:00:00
Lumos CrestReva Realty Developers Llp31-12-2031 00:00:00
Lumos 1Reva Realty Developers Llp31-12-2031 00:00:00
Anupam Chs. Ltd.Shree Mangalmurti Enterprises25-12-2029 00:00:00
Poonam Chhaya ChslVastu Vaibhav Creations Llp31-12-2026 00:00:00
Pradeep Co-Operative Housing Society Ltd.Squarefeet Real EstateF8o+Orelf8nr9uwd+Bkhuwrhtavwcdumc6uk3v5lihbh6buvb08viexghtaoei9l30-09-2027 00:00:00
Empire DynastyLakhani Builders Pvt Ltd6Pmygb5i9gmkldffoqsavw==31-12-2030 00:00:00
Manohar MahalSharda Vastu Nirmitee Pvt. Ltd.O7dyaplfbdu5xpfr0xynaxvbj/Onqxfeuhepu5a98yl6geky8wsiainrwxujmuy331-12-2025 00:00:00
Ashtavinayak ResidencyAshvattha Realty LlpRoi5uff/Cab+Zxepxrah1lwj3mp67lrcjpy7q7u5f6e=31-12-2025 00:00:00
ParadiseShree Yash DevelopersQe1qpfgva0w+P2z3iyepva==30-03-2022 00:00:00
CELEBRATIONSHINDUSTAN CONSTRUCTION CORPORATIONPlot No.2331-12-2017 00:00:00
Devyani CHSShree Swami Sanket Enterprises31-05-2028 00:00:00
Naiks Central PlazaClean Construction Co.Opp Gaondevi Ground31-12-2018 00:00:00
KISHIN MAHAL CO OPERATIVE SOCIETYKISHIN MAHAL CO OP HSG SOCIETY LIMITED31-12-2028 00:00:00
MohandeepMagestic Premises Private Limited15-06-2027 00:00:00
Sapphire SquareVedant Construction31-05-2027 00:00:00
Ekatva CrescentJ V Buildpro Llp31-12-2028 00:00:00
Nav OmkarAvighna Redevelopers Nav Omkar31-12-2028 00:00:00
PRAKASH VILLA CHS LTD.SHARDAVENUE REALTYSPACES LLP31-05-2028 00:00:00
Project Details
  • Project:
    Auralis The Twins
  • Location:
  • +Dxf2i8gozq4k5wncymckq==
  • Const. Stage:
    Ongoing
  • Possession:
    01 Mar 2019
Developer Details

  • Developer:
    Deep Homes & Constructions Llp
  • Phone:
  • Address:
  • Na
Project RERA Details
MAHA REARA No: P51700009177
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mr.Anil Jagwani
Funding Bank HDFC BANK
Proposed Possession 01 Mar 2019
Revised Possession 01 Mar 2019
Extended Possession 31 Jan 2021
Litigations No Litigations
Last Modified 19 Nov 2020
Last Retrived 13 Feb 2026
Auralis The Twins QR Code
Auralis The Twins
MahaRERA - P51700009177
Apartment Details & Configuration
TypeArea
SINGLE ROOM15.21 Sq.mts. ( 164 Sq.ft. )
2 BHK70.18 Sq.mts. ( 755 Sq.ft. )
3 BHK103.85 Sq.mts. ( 1118 Sq.ft. )
2.5 BHK93.64 Sq.mts. ( 1008 Sq.ft. )
3.5 BHK115.54 Sq.mts. ( 1244 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Auralis The Twinslast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Done Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Will Be Done Prior To Oc
Energy management45% completed
45% Complete
Will Be Done Prior To Oc
Fire Protection And Fire Safety Requirements60% completed
60% Complete
Will Be Done Prior To Oc
Landscaping & Tree Planting45% completed
45% Complete
Will Be Done Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Will Be Done Prior To Oc
Solid Waste Management And Disposal65% completed
65% Complete
Will Be Done Prior To Oc
Storm Water Drains95% completed
95% Complete
Will Be Done Prior To Oc
Street Lighting
Will Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water85% completed
85% Complete
Will Be Done Prior To Oc
Water Conservation, Rain water Harvesting85% completed
85% Complete
Will Be Done Prior To Oc
Water Supply
Will Be Done Prior To Oc
Buildings / Wings in Auralis The Twins
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Auralis The Twins by Deep Homes & Constructions Llplast updated on 13 Feb 2026 as per information obtained from MARA RERA.

90636 Sq. ft.

Project Area

14140 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

682 apartments in total
Total
682
Booked
597
Available
85

Saleable Area Statistics (Sq. ft.)

297619 Total
Total
297619
Booked
205310
Available
92308
Total 682 apartments in project. 597 apartments booked. 87% apartments booked.
Total 297619 Sq.ft. saleable area. 205310 saleable area booked.
69% area booked.

Rental

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
RentalJan 190020101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SINGLE ROOM15.21 Sq.mts. ( 164 Sq.ft. )468
468 Booked100% Booked
100% Booked
468 total apartments / 468 apartments booked. 100% apartments booked.
Work Description in Building RentalCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower-1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-1Jan 20193211110221
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.18 Sq.mts. ( 755 Sq.ft. )51
39 Booked76% Booked
76% Booked
3 BHK103.85 Sq.mts. ( 1118 Sq.ft. )56
41 Booked73% Booked
73% Booked
107 total apartments / 80 apartments booked. 74% apartments booked.
Work Description in Building Tower-1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower-2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-2Jan 20192811110220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK93.64 Sq.mts. ( 1008 Sq.ft. )56
32 Booked57% Booked
57% Booked
3.5 BHK115.54 Sq.mts. ( 1244 Sq.ft. )51
17 Booked33% Booked
33% Booked
107 total apartments / 49 apartments booked. 45% apartments booked.
Work Description in Building Tower-2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Deep Homes & Constructions Llp
for Project
Auralis The Twins
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation