Project overview

BROOKLYN PARK PHASE III is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000000148. BROOKLYN PARK PHASE III is located at 70/174 Pt, 69/172 Pt, 71/173 Pt. This is a Ongoing being developed by EKTA PARKSVILLE HOMES PVT. LTD..

BROOKLYN PARK PHASE III has 1 BHK, 2 BHK, SHOPTYPE1, SHOPTYPE10, SHOPTYPE11, SHOPTYPE2, SHOPTYPE3, SHOPTYPE4, SHOPTYPE5, SHOPTYPE6, SHOPTYPE7, SHOPTYPE8 & SHOPTYPE9 Apartments with carpet areas ranging from 134 to 544 Sq.ft. Carpet. The Project has total 195 of which 6 are currently available for sale.

BROOKLYN PARK PHASE III is being developed on a total land area of 9894 Sq.ft. out of which 8450 Sq.ft. i.e 85% is reserved for recreational purposes. BROOKLYN PARK PHASE III has 3 Wings / Towers Sec Iii Building No 9 Wing A,Sec Iii Building No 9 Wing B,Sec Iii Building No 9 Wing C

ProjectDeveloperLocationPossession
RACHNA TOWERSVIKRAM BUILDWELL PVT LTDS No 65 H No 1 S No 66 H No 8 9 18 19 20 21 22/4 S No 68 H No 1 S No 72 H No 3/231-12-2019 00:00:00
POONAM VISTAPABAL HOUSING PRIVATE LIMITED5/630-06-2025 00:00:00
EKTA PARKSVILLE PHASE IIIEKTA PARKSVILLE HOMES PVT. LTD.91/176, 94/185 Pt30-12-2020 00:00:00
BROOKLYN PARK PHASE IIEKTA PARKSVILLE HOMES PVT. LTD.69-172 Part, 14-438 Part31-10-2019 00:00:00
EKTA PARKSVILLE PHASE IIEKTA PARKSVILLE HOMES PVT. LTD.90/183 7/4 7/5Pt30-06-2021 00:00:00
EKTA PARKSVILLE PHASE IEKTA PARKSVILLE HOMES PVT. LTD.96/178, 7A Pt/7B Pt, 93/177/1/2 Pt31-12-2019 00:00:00
BROOKLYN PARK PHASE IEKTA PARKSVILLE HOMES PVT. LTD.69/172 Pt31-05-2019 00:00:00
BROOKLYN PARK PHASE IIIEKTA PARKSVILLE HOMES PVT. LTD.70/174 Pt, 69/172 Pt, 71/173 Pt28-02-2020 00:00:00
Shree Shakun GreensShree Shakun Realty Pvt Ltd86/187 Hissa No 1 87/186 Hissa No 1 And 2 31-12-2019 00:00:00
AGARWAL PARAMOUNTAGARWAL REALTORSNew Survey No. 5,5B,5D,5F30-12-2023 00:00:00
VINAY UNIQUE HEIGHTSSUV DEVELOPERSSurvey No 71 Hissa No 1/1, 1/331-12-2019 00:00:00
BROOKLYN PARKCHANDIWALA ENTERPRISES401303, Palghar31-12-2018 00:00:00
ZEAL REGENCYBLUE BARON REALTORS4531-12-2018 00:00:00
Cosmos SolitaireCosmos Prime Projects Ltd70 174/330-12-2022 00:00:00
LABH HEIGHTSLABH ASSOCIATESS No 87 H No 1 S No 88 H No 1 S No 89 H No 1 S No 90 H No 7/7 7/831-03-2019 00:00:00
AGARWAL SOLITAIREAGARWAL BUILDERSS.No 9 H.No.1,2,3/131-03-2019 00:00:00
GARDEN AVENUE K- K4SRIDUTT CONSTRUCTIONS5,5B31-12-2018 00:00:00
YASHWANT HEIGHTSMANGALMURTI DEVELOPERSS.No.277,H.No.6/1,8,9,S.No. 27831-12-2018 00:00:00
Sumit Greendale NXSumit Pragati Shelters LLP5,5B31-10-2018 00:00:00
Gokul ParkShyaam Realty (Prop.- L. P. Agarwal)38331-03-2018 00:00:00
Mahavir HeightsMehta & Sons66/4 66/5 66/21 66/22/1/2/3/4 66/23 66/24/1/2 72/2/331-12-2019 00:00:00
Ocean PearlM.M.ConstructionVasai31-12-2020 00:00:00
MAITRY HEIGHTSRAJ MAITRY & ESKON DEVELOPERS65,46,66 Part31-07-2019 00:00:00
Parshwa Heights G WingParasnath BuildersPalghar, 40130331-03-2020 00:00:00
ACROPOLIS 2Bhoomi & Arkade Associates37-46 Part 51-57Part 98-121Part 124, 145-147Part 368 And Others As Per Title Certificate Attached30-12-2022 00:00:00
Poonam PrimePrime DevelopersSno 355 Hno 8 To 2301-01-2019 00:00:00
Parshwa Heights F WingParasnath Builders401303, Palghar31-03-2020 00:00:00
GARDEN AVENUE - K K3SRIDUTT CONSTRUCTIONS5,5B30-12-2023 00:00:00
Acropolis 1Bhoomi & Arkade Associates37-46 Part 51-67Part 98-121Part 124 145 147 368 And Others As Per Title Certificate Attached30-12-2021 00:00:00
BHAVANI VIEWBhavani Construction91/176 Hissa No. 1/231-12-2019 00:00:00
Mahavir DarshanMahavir Realtors40130331-12-2020 00:00:00
VINAY UNIQUE HOMESVINAYUNIQUE REALTORSSurvey No 9131-12-2019 00:00:00
KAILASH TOWERKAILASH DEVELOPERSSurvey No 72 H No 1/1 1/3 3/1/1 10 1131-12-2019 00:00:00
VINAY UNIQUE IMPERIAIMPERIUM BUILDCON LLP45, 46, 4731-12-2019 00:00:00
BLU PEARLSB LIFESPACES PVT LTD5, 5B04-10-2022 00:00:00
PRIYESH HEIGHTSPRIYESH ENTERPRISES91/176 Hissa No.230-06-2021 00:00:00
BHAVANI HEIGHTSBhavani Developers69/172 Hissa No.5 , 72/167 Hissa No.3/1/1, 3/1/2.31-12-2019 00:00:00
Mahavir GardenMahavir DevelopersVirar West28-12-2018 00:00:00
ESSAR APEXARSIWALA CONSTRUCTIONS PRIVATE LIMITEDS.No.91 H.S.28,30-06-2021 00:00:00
Y. K. NAGAR NXSHREE ASHTAVINAYAK BUILDERSSurvey No 347/B31-12-2017 00:00:00
VAMA PARADISEVAMA LIFESTYLES45/150 P.T30-12-2019 00:00:00
Swastick HeightsShree Swastick Builders7031-01-2019 00:00:00
Mandar AssociatesMandar AssociatesPalghar, 40130331-07-2019 00:00:00
Shree Nath Nagar No 1 And 2Shreenath Enterprises401203, Palghar31-07-2022 00:00:00
VINAY UNIQUE GARDENSVINAYUNIQUE DEVELOPERS93-2, 94-1,2,3,4,5,6,7,831-12-2019 00:00:00
Sun HeightsSun Vinay Unique Realty LlpChikhal Dongre Road30-06-2019 00:00:00
Star HeightsStar Developers401203, Palghar31-12-2019 00:00:00
Ekta Parksville Phase IVEKTA PARKSVILLE HOMES PVT. LTD.91/176 1/2Pt, 91/176 2Pt, 91/176 3Pt30-06-2022 00:00:00
RUSTOMJEE VIRAR AVENUE D1 WING C AND WING DKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDAvenue D1 Pt Forming Part Of Larger Layout Bearing New Survey Numbers 5 5B 5D 5F 5G Village Dongre 30-12-2021 00:00:00
RUSTOMJEE VIRAR AVENUE D1 WING A AND WING B AND RETAIL BUILDINGKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDAvenue D1 Pt Forming Part Of Larger Layout Bearing New Survey Numbers 5 5B 5D 5F 5G Village Dongre30-12-2021 00:00:00
Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail BuildingKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPart Of Avenue L1-L2 L4 Being Pt Of Larger Layout Bearing Surve Nos 5 5B 5D 5F 5G Of Village Dongre31-07-2022 00:00:00
Rustomjee Virar Avenue L1-L2 And L4 Wing C and DKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPart Of Avenue L1-L2- L4 Being Pt Of Larger Layout Bearing Surve Nos 5 5B 5D 5F 5G Of Village Dongre31-07-2022 00:00:00
Rustomjee Virar Avenue L1-L2 And L4 Wing E and F and Retail BuildingKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPart Of Avenue L1-L2 -L4 Being Pt Of Larger Layout Bearing Surve Nos 5 5B 5D 5F 5G Of Village Dongre28-02-2023 00:00:00
YASH PLATINAMD REALTORS & DEVELOPERS LLPSurvey No. 346B And 356B Hissa No. B1 To B5, C And Survey No. 347C Hissa No. 1 And 2 And Survey No. 347A Hissa No. 4 Of Village Bolinj And Survey No. 21B Hissa No. 3 Of Village Dongare.30-09-2025 00:00:00
PENINSULA RESIDENCYPRIESKA REAL ESTATES PVT. LTD.Survey No 346 Hissa No 6, 731-03-2023 00:00:00
Jivdani VaibhavlaxmiKishor PatilPalghar, Virar West, 40130331-12-2023 00:00:00
Gokul Dham HeightsMayur DeshmukhShree Radha Krishna Mandir31-03-2023 00:00:00
Rustomjee Virar Avenue L1-L2 and L4 Wing KKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPt Of Avenue L1 L2 L4 Being Pt Of Larger Layout Being Sy No 5 5B 5D 5F 5G Of Village Dongre30-09-2023 00:00:00
Dhananjay SquareOM SADGURU ASSOCIATES1/A/1/1/10/1031-12-2026 00:00:00
EVARANEMINATH POONAM REALTY LLP5/1, 5/2, 5/3, 5/4, 5/5A, 5/5B, 5/5C, 5/5D 5/5E31-12-2030 00:00:00
Project Details
  • Project:
    BROOKLYN PARK PHASE III
  • Location:
  • 70/174 Pt, 69/172 Pt, 71/173 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    28 Feb 2020
Developer Details

  • Developer:
    EKTA PARKSVILLE HOMES PVT. LTD.
  • Phone:
  • Address:
  • Excel Entertainment
Project RERA Details
MAHA REARA No: P99000000148
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ajay Wade And Associates
Funding Bank HDFC BANK
Proposed Possession 28 Feb 2020
Revised Possession 28 Feb 2020
Extended Possession 30 Apr 2023
Litigations No Litigations
Last Modified 23 Jun 2025
Last Retrived 14 Feb 2026
BROOKLYN PARK PHASE III QR Code
BROOKLYN PARK PHASE III
MahaRERA - P99000000148
Apartment Details & Configuration
TypeArea
2 BHK48.31 Sq.mts. ( 520 Sq.ft. )
SHOPTYPE110.75 Sq.mts. ( 116 Sq.ft. )
SHOPTYPE213.17 Sq.mts. ( 142 Sq.ft. )
SHOPTYPE312.47 Sq.mts. ( 134 Sq.ft. )
SHOPTYPE414.46 Sq.mts. ( 156 Sq.ft. )
1 BHK34.57 Sq.mts. ( 372 Sq.ft. )
2 BHK50.01 Sq.mts. ( 538 Sq.ft. )
2 BHK50.58 Sq.mts. ( 544 Sq.ft. )
SHOPTYPE112.45 Sq.mts. ( 134 Sq.ft. )
SHOPTYPE1016.62 Sq.mts. ( 179 Sq.ft. )
SHOPTYPE1116.38 Sq.mts. ( 176 Sq.ft. )
SHOPTYPE213.26 Sq.mts. ( 143 Sq.ft. )
SHOPTYPE315.15 Sq.mts. ( 163 Sq.ft. )
SHOPTYPE416.77 Sq.mts. ( 181 Sq.ft. )
SHOPTYPE515.27 Sq.mts. ( 164 Sq.ft. )
SHOPTYPE614.01 Sq.mts. ( 151 Sq.ft. )
SHOPTYPE712.56 Sq.mts. ( 135 Sq.ft. )
SHOPTYPE815.01 Sq.mts. ( 162 Sq.ft. )
SHOPTYPE919 Sq.mts. ( 205 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of BROOKLYN PARK PHASE IIIlast updated on 14 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Completed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Gazebo100% completed
95% Complete
Gazebo Fixed.
Landscaping & Tree Planting100% completed
95% Complete
Completed
LAWN100% completed
95% Complete
To Be Handed Over To The Apex Body
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Oragnic Waste Composter Iinstalled.
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Inside Work Completed
Buildings / Wings in BROOKLYN PARK PHASE III
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of BROOKLYN PARK PHASE III by EKTA PARKSVILLE HOMES PVT. LTD.last updated on 14 Feb 2026 as per information obtained from MARA RERA.

9894 Sq. ft.

Project Area

8450 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

195 apartments in total
Total
195
Booked
189
Available
6

Saleable Area Statistics (Sq. ft.)

83813 Total
Total
83813
Booked
80693
Available
3120
Total 195 apartments in project. 189 apartments booked. 96% apartments booked.
Total 83813 Sq.ft. saleable area. 80693 saleable area booked.
96% area booked.

Sec Iii Building No 9 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sec Iii Building No 9 Wing AFeb 202013101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK48.31 Sq.mts. ( 520 Sq.ft. )47
44 Booked93% Booked
93% Booked
SHOPTYPE110.75 Sq.mts. ( 116 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOPTYPE213.17 Sq.mts. ( 142 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOPTYPE312.47 Sq.mts. ( 134 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOPTYPE414.46 Sq.mts. ( 156 Sq.ft. )2
2 Booked100% Booked
100% Booked
55 total apartments / 52 apartments booked. 94% apartments booked.
Work Description in Building Sec Iii Building No 9 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress74% done
74% Booked
Sanitary Fittings within the flats / premises
work-in-progress74% done
74% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sec Iii Building No 9 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sec Iii Building No 9 Wing BFeb 202013101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK48.31 Sq.mts. ( 520 Sq.ft. )47
44 Booked93% Booked
93% Booked
SHOPTYPE110.75 Sq.mts. ( 116 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOPTYPE213.17 Sq.mts. ( 142 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOPTYPE312.47 Sq.mts. ( 134 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOPTYPE414.46 Sq.mts. ( 156 Sq.ft. )2
2 Booked100% Booked
100% Booked
55 total apartments / 52 apartments booked. 94% apartments booked.
Work Description in Building Sec Iii Building No 9 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress81% done
81% Booked
Sanitary Fittings within the flats / premises
work-in-progress81% done
81% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Sec Iii Building No 9 Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sec Iii Building No 9 Wing CFeb 202013101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.57 Sq.mts. ( 372 Sq.ft. )47
47 Booked100% Booked
100% Booked
2 BHK50.01 Sq.mts. ( 538 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK50.58 Sq.mts. ( 544 Sq.ft. )12
12 Booked100% Booked
100% Booked
SHOPTYPE112.45 Sq.mts. ( 134 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE1016.62 Sq.mts. ( 179 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE1116.38 Sq.mts. ( 176 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE213.26 Sq.mts. ( 143 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOPTYPE315.15 Sq.mts. ( 163 Sq.ft. )3
3 Booked100% Booked
100% Booked
SHOPTYPE416.77 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE515.27 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE614.01 Sq.mts. ( 151 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE712.56 Sq.mts. ( 135 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE815.01 Sq.mts. ( 162 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOPTYPE919 Sq.mts. ( 205 Sq.ft. )1
1 Booked100% Booked
100% Booked
85 total apartments / 85 apartments booked. 100% apartments booked.
Work Description in Building Sec Iii Building No 9 Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress68% done
68% Booked
Sanitary Fittings within the flats / premises
work-in-progress68% done
68% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
EKTA PARKSVILLE HOMES PVT. LTD.
for Project
BROOKLYN PARK PHASE III
last updated on 14 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation