Project overview

Crescent Bay - T1 - 40, 41 Floors is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900008032. Crescent Bay - T1 - 40, 41 Floors is located at Mumbai City, 400012. This is a On-Going Project being developed by L&Amp;T Parel Project Llp (Jv With Ordpl).

Crescent Bay - T1 - 40, 41 Floors has 2 BHK Classic, 2 BHK Premier & 3 BHK Elegante Apartments with carpet areas ranging from 723 to 901 Sq.ft. Carpet. The Project has total 12 of which 11 are currently available for sale.

Crescent Bay - T1 - 40, 41 Floors is being developed on a total land area of 9792 Sq.ft. Crescent Bay - T1 - 40, 41 Floors has 1 Wings / Towers Crescent Bay - T1 - 40, 41 Floors

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Crescent Bay - T1 - 40, 41 Floors
  • Location:
  • Mumbai City, 400012
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Oct 2017
Developer Details

  • Developer:
    L&Amp;T Parel Project Llp (Jv With Ordpl)
  • Phone:
  • Address:
  • L&Amp;T House, L&Amp;T House, N.M Marg, Ballard Estate, Ballard Estate, 400001
Project RERA Details
MAHA REARA No: P51900008032
Project Type Residential
RERA Project Status On-Going Project
Architect Sandeep Shikre Associates
Funding Bank Kotak Mahindra Bank Ltd
Proposed Possession 31 Oct 2017
Revised Possession 31 Mar 2018
Extended Possession
Litigations Yes
Last Modified 16 Dec 2021
Last Retrived 14 Jan 2025
Crescent Bay - T1 - 40, 41 Floors QR Code
Crescent Bay - T1 - 40, 41 Floors
MahaRERA - P51900008032
Apartment Details & Configuration
TypeArea
2 BHK Classic67.13 Sq.mts. ( 723 Sq.ft. )
2 BHK Premier68.57 Sq.mts. ( 738 Sq.ft. )
3 BHK Elegante83.72 Sq.mts. ( 901 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Crescent Bay - T1 - 40, 41 Floorslast updated on 14 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
-
Energy management70% completed
70% Complete
For Cluster Of Towers
Fire Protection And Fire Safety Requirements90% completed
90% Complete
-
Landscaping & Tree Planting6% completed
6% Complete
For Larger Layout
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Stp Will Be Shared By Cluster Of Towers
Solid Waste Management And Disposal
For Larger Layout
Storm Water Drains90% completed
90% Complete
For Larger Layout
Street Lighting12% completed
12% Complete
For Larger Layout
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
For Cluster Of Towers
Water Conservation, Rain water Harvesting75% completed
75% Complete
For Cluster Of Towers
Water Supply90% completed
90% Complete
For Larger Layout
Buildings / Wings in Crescent Bay - T1 - 40, 41 Floors
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Crescent Bay - T1 - 40, 41 Floors by L&Amp;T Parel Project Llp (Jv With Ordpl)last updated on 14 Jan 2025 as per information obtained from MARA RERA.

9792 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
1
Available
11

Saleable Area Statistics (Sq. ft.)

9447 Total
Total
9447
Booked
723
Available
8725
Total 12 apartments in project. 1 apartments booked. 8% apartments booked.
Total 9447 Sq.ft. saleable area. 723 saleable area booked.
8% area booked.

Crescent Bay - T1 - 40, 41 Floors

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Crescent Bay - T1 - 40, 41 FloorsJan 190020000026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK Classic67.13 Sq.mts. ( 723 Sq.ft. )4
1 Booked25% Booked
25% Booked
2 BHK Premier68.57 Sq.mts. ( 738 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK Elegante83.72 Sq.mts. ( 901 Sq.ft. )4
None Booked0% Booked
0% Booked
12 total apartments / 1 apartments booked. 8% apartments booked.
Work Description in Building Crescent Bay - T1 - 40, 41 FloorsCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
L&Amp;T Parel Project Llp (Jv With Ordpl)
for Project
Crescent Bay - T1 - 40, 41 Floors
last updated on 14 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation