Project overview
Crescent Bay - T5 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900004544. Crescent Bay - T5 is located at Mumbai City, 400012. This is a On-Going Project being developed by L&Amp;T Parel Project Llp (Jv With Ordpl).
Crescent Bay - T5 has 3 BHK Grandio A, 3 BHK Grandio B, 3 BHK Imperia II A, 3 BHK Imperio I A, 3 BHK Imperio I B, 3 BHK Imperio I C, 3 BHK Imperio II B & 3 BHK Imperio II C Apartments with carpet areas ranging from 1163 to 1068 Sq.ft. Carpet. The Project has total 298 of which 27 are currently available for sale.
Crescent Bay - T5 is being developed on a total land area of 14049 Sq.ft. Crescent Bay - T5 has 1 Wings / Towers Crescent Bay - T5
Project | Developer | Location | Possession |
Tropical Panache | Waterfront Buildcon Llp | Thane, 400015 | 30-03-2022 00:00:00 |
Shahid Nagar | Neumec And Sangam Jv | 207 Regent Chamber, Nariman Point, Nariman Point | 30-06-2023 00:00:00 |
Krypton Twin Tower Building B Wing Ii | Krypton Construction Private Limited | Mumbai City, 400015 | 31-12-2014 00:00:00 |
Ruparel Ariana | Shree Sukhakarta Developers Pvt.Ltd. | Jerbai Wadia Raod, Parel, Parel | 31-12-2019 00:00:00 |
Matoshree Pride Building 2 | Matoshree Properties | G D Ambekar Marg, Parel, Parel | 31-03-2018 00:00:00 |
Crescent Bay - T5 | L&Amp;T Parel Project Llp (Jv With Ordpl) | Mumbai City, 400012 | 31-03-2018 00:00:00 |
Building No 4 On Portion Of Cts No 442 Part 444 Part 447 Part And 625 Part | East And West Builders | Mumbai City, 400015 | 31-12-2020 00:00:00 |
Spenta Nest | Shubh Enterprises | Mumbai City, 400014 | 31-12-2025 00:00:00 |
Balaji Sharan | Haresh Chandan | Bhawanji Arjun Khamji Marg, Matunga, Matunga | 19-10-2020 00:00:00 |
Jubilee Mill | Mhada | Mumbai City, 400015 | 15-10-2017 00:00:00 |
Kalpataru Avana | Kalpataru Limited | Gen. Nagesh Marg Off Dr Ss Rao Road, Parel-Sewri Division, Parel-Sewri Division | 31-03-2019 00:00:00 |
Dosti Belleza | Crystal Builders And Developers | G D Ambekar Marg, Parel Village, Parel Village | 30-12-2021 00:00:00 |
-
Project:
Crescent Bay - T5
-
Location:
-
Mumbai City, 400012
-
Const. Stage:
On-Going Project
-
Possession:
31 Mar 2018
-
Developer:
L&Amp;T Parel Project Llp (Jv With Ordpl)
-
Phone:
-
Address:
-
L&Amp;T House, L&Amp;T House, N.M Marg, Ballard Estate, Ballard Estate, 400001
MAHA REARA No: |
P51900004544 |
Project Type |
Residential |
RERA Project Status |
On-Going Project |
Architect |
Sandeep Shikre Associates |
Funding Bank |
Kotak Mahindra Bank Ltd |
Proposed Possession |
31 Mar 2018 |
Revised Possession |
31 Aug 2018 |
Extended Possession |
|
Litigations |
Yes |
Last Modified |
30 Oct 2021 |
Last Retrived |
14 Jan 2025 |
Crescent Bay - T5 QR Code
Crescent Bay - T5
MahaRERA - P51900004544
Type | Area |
3 BHK Grandio A | 99.26 Sq.mts. ( 1068 Sq.ft. ) |
3 BHK Grandio B | 108.05 Sq.mts. ( 1163 Sq.ft. ) |
3 BHK Imperia II A | 89.34 Sq.mts. ( 962 Sq.ft. ) |
3 BHK Imperio I A | 87.1 Sq.mts. ( 938 Sq.ft. ) |
3 BHK Imperio I B | 94.43 Sq.mts. ( 1016 Sq.ft. ) |
3 BHK Imperio I C | 92.76 Sq.mts. ( 998 Sq.ft. ) |
3 BHK Imperio II B | 96.61 Sq.mts. ( 1040 Sq.ft. ) |
3 BHK Imperio II C | 81.9 Sq.mts. ( 882 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Crescent Bay - T5last updated on 14 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station44% completed
|
|
- |
Energy management60% completed
|
|
For Cluster Of Towers |
Fire Protection And Fire Safety
Requirements84% completed
|
|
- |
Jogging Track with Associated amenities21% completed
|
|
For Cluster Of Towers |
Landscaping & Tree Planting6% completed
|
|
For Larger Layout |
|
|
Na |
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
|
|
Stp Will Be Shared By Cluster Of Towers |
Solid Waste Management And Disposal
|
|
For Larger Layout |
Storm Water Drains70% completed
|
|
For Larger Layout |
Street Lighting12% completed
|
|
For Larger Layout |
Treatment And Disposal Of Sewage And Sullage Water87% completed
|
|
For Cluster Of Towers |
Water Conservation, Rain water Harvesting80% completed
|
|
For Cluster Of Towers |
Water Supply85% completed
|
|
For Larger Layout |
Buildings / Wings in Crescent Bay - T5
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Crescent Bay - T5 by L&Amp;T Parel Project Llp (Jv With Ordpl)last updated on 14 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
298
apartments in total
Saleable Area Statistics (Sq. ft.)
294645
Total
Total 298 apartments in project. 271 apartments booked. 90% apartments booked.
Total 294645 Sq.ft. saleable area. 267823 saleable area booked.
91% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Crescent Bay - T5 | Jan 1900 | 57 | 1 | 0 | 0 | 7 | 0 | 574 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
3 BHK Grandio A | 99.26 Sq.mts. ( 1068 Sq.ft. ) | 86 | |
3 BHK Grandio B | 108.05 Sq.mts. ( 1163 Sq.ft. ) | 4 | |
3 BHK Imperia II A | 89.34 Sq.mts. ( 962 Sq.ft. ) | 98 | |
3 BHK Imperio I A | 87.1 Sq.mts. ( 938 Sq.ft. ) | 98 | |
3 BHK Imperio I B | 94.43 Sq.mts. ( 1016 Sq.ft. ) | 4 | |
3 BHK Imperio I C | 92.76 Sq.mts. ( 998 Sq.ft. ) | 2 | |
3 BHK Imperio II B | 96.61 Sq.mts. ( 1040 Sq.ft. ) | 4 | |
3 BHK Imperio II C | 81.9 Sq.mts. ( 882 Sq.ft. ) | 2 | |
298 total apartments / 271 apartments booked. 90% apartments booked. |
Work Description in Building Crescent Bay - T5 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
L&Amp;T Parel Project Llp (Jv With Ordpl)
for Project
Crescent Bay - T5
last updated on
14 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |