Project overview

Dosti West County - Dosti Tulip is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700032666. Dosti West County - Dosti Tulip is located at Balkum Bhiwandi Wadpa Road, Thane, Thane. This is a New Project being developed by Dosti Enterprises.

Dosti West County - Dosti Tulip has 2 BHK & 3 BHK Apartments with carpet areas ranging from 534 to 873 Sq.ft. Carpet. The Project has total 672 of which 163 are currently available for sale.

Dosti West County - Dosti Tulip is being developed on a total land area of 120664 Sq.ft. out of which 31722 Sq.ft. i.e 26% is reserved for recreational purposes. Dosti West County - Dosti Tulip has 3 Wings / Towers Building 1 Wing A,Building 2 Wing B,Building 3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Dosti West County - Dosti Tulip
  • Location:
  • Balkum Bhiwandi Wadpa Road, Thane, Thane
  • Const. Stage:
    New Project
  • Possession:
    31 Oct 2026
Developer Details

  • Developer:
    Dosti Enterprises
  • Phone:
  • Address:
  • Dosti Group, Lawrence &Amp; Mayo 276, D N Road Fort, Khadibhandar, Mumbai, 400001
Project RERA Details
MAHA REARA No: P51700032666
Project Type Residential
RERA Project Status New Project
Architect Architect Jay R Vora
Funding Bank KOTAK MAHINDRA BANK
Proposed Possession 31 Oct 2026
Revised Possession
Extended Possession
Litigations Yes
Last Modified 04 Feb 2024
Last Retrived 16 Jan 2025
Dosti West County - Dosti Tulip QR Code
Dosti West County - Dosti Tulip
MahaRERA - P51700032666
Apartment Details & Configuration
TypeArea
2 BHK45.76 Sq.mts. ( 493 Sq.ft. )
2 BHK56.74 Sq.mts. ( 611 Sq.ft. )
2 BHK57.8 Sq.mts. ( 622 Sq.ft. )
2 BHK65.24 Sq.mts. ( 702 Sq.ft. )
3 BHK81.13 Sq.mts. ( 873 Sq.ft. )
Shop13.32 Sq.mts. ( 143 Sq.ft. )
Shop15 Sq.mts. ( 161 Sq.ft. )
Shop16.53 Sq.mts. ( 178 Sq.ft. )
Shop27.22 Sq.mts. ( 293 Sq.ft. )
Shop27.86 Sq.mts. ( 300 Sq.ft. )
Shop28.77 Sq.mts. ( 310 Sq.ft. )
Shop30.2 Sq.mts. ( 325 Sq.ft. )
Shop30.54 Sq.mts. ( 329 Sq.ft. )
Shop31.62 Sq.mts. ( 340 Sq.ft. )
2 BHK49.37 Sq.mts. ( 531 Sq.ft. )
2 BHK56.43 Sq.mts. ( 607 Sq.ft. )
Shop13.29 Sq.mts. ( 143 Sq.ft. )
Shop13.62 Sq.mts. ( 147 Sq.ft. )
Shop14.96 Sq.mts. ( 161 Sq.ft. )
Shop27.23 Sq.mts. ( 293 Sq.ft. )
Shop27.88 Sq.mts. ( 300 Sq.ft. )
Shop28.81 Sq.mts. ( 310 Sq.ft. )
Shop30.58 Sq.mts. ( 329 Sq.ft. )
Shop31.6 Sq.mts. ( 340 Sq.ft. )
2 BHK49.59 Sq.mts. ( 534 Sq.ft. )
2 BHK57.92 Sq.mts. ( 623 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dosti West County - Dosti Tuliplast updated on 16 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Sanctioned Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
No Receiving Station
Energy management
Provision Made For Solar Panel On Terrace
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Provision Made In Layout
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Provision Made In Layout
Solid Waste Management And Disposal
Provision Made In Layout
Storm Water Drains
Provision Made In Layout
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Provision Of Owc Made In Layout
Water Conservation, Rain water Harvesting
Provision Made In Layout
Water Supply
By Tmc
Buildings / Wings in Dosti West County - Dosti Tulip
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dosti West County - Dosti Tulip by Dosti Enterpriseslast updated on 16 Jan 2025 as per information obtained from MARA RERA.

120664 Sq. ft.

Project Area

31722 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

672 apartments in total
Total
672
Booked
509
Available
163

Saleable Area Statistics (Sq. ft.)

437926 Total
Total
437926
Booked
332668
Available
105259
Total 672 apartments in project. 509 apartments booked. 75% apartments booked.
Total 437926 Sq.ft. saleable area. 332668 saleable area booked.
76% area booked.

Building 1 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1 Wing AOct 20263010130249
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK45.76 Sq.mts. ( 493 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK56.74 Sq.mts. ( 611 Sq.ft. )58
58 Booked100% Booked
100% Booked
2 BHK57.8 Sq.mts. ( 622 Sq.ft. )60
59 Booked98% Booked
98% Booked
2 BHK65.24 Sq.mts. ( 702 Sq.ft. )2
1 Booked50% Booked
50% Booked
3 BHK81.13 Sq.mts. ( 873 Sq.ft. )58
55 Booked94% Booked
94% Booked
Shop13.32 Sq.mts. ( 143 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop15 Sq.mts. ( 161 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop16.53 Sq.mts. ( 178 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop27.22 Sq.mts. ( 293 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop27.86 Sq.mts. ( 300 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop28.77 Sq.mts. ( 310 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop30.2 Sq.mts. ( 325 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop30.54 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.62 Sq.mts. ( 340 Sq.ft. )2
2 Booked100% Booked
100% Booked
196 total apartments / 185 apartments booked. 94% apartments booked.
Work Description in Building Building 1 Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress78% done
78% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 2 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2 Wing BOct 20263010130297
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK49.37 Sq.mts. ( 531 Sq.ft. )52
52 Booked100% Booked
100% Booked
2 BHK56.43 Sq.mts. ( 607 Sq.ft. )60
59 Booked98% Booked
98% Booked
2 BHK56.74 Sq.mts. ( 611 Sq.ft. )58
57 Booked98% Booked
98% Booked
2 BHK65.24 Sq.mts. ( 702 Sq.ft. )3
2 Booked66% Booked
66% Booked
3 BHK81.13 Sq.mts. ( 873 Sq.ft. )57
53 Booked92% Booked
92% Booked
Shop13.29 Sq.mts. ( 143 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.62 Sq.mts. ( 147 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.96 Sq.mts. ( 161 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop16.53 Sq.mts. ( 178 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop27.23 Sq.mts. ( 293 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop27.88 Sq.mts. ( 300 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop28.81 Sq.mts. ( 310 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop30.58 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.6 Sq.mts. ( 340 Sq.ft. )2
1 Booked50% Booked
50% Booked
245 total apartments / 232 apartments booked. 94% apartments booked.
Work Description in Building Building 2 Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress78% done
78% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 3Oct 2026291013048
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK49.59 Sq.mts. ( 534 Sq.ft. )52
19 Booked36% Booked
36% Booked
2 BHK56.43 Sq.mts. ( 607 Sq.ft. )60
26 Booked43% Booked
43% Booked
2 BHK56.74 Sq.mts. ( 611 Sq.ft. )29
12 Booked41% Booked
41% Booked
2 BHK57.92 Sq.mts. ( 623 Sq.ft. )30
13 Booked43% Booked
43% Booked
2 BHK65.24 Sq.mts. ( 702 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK81.13 Sq.mts. ( 873 Sq.ft. )59
22 Booked37% Booked
37% Booked
231 total apartments / 92 apartments booked. 39% apartments booked.
Work Description in Building Building 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress48% done
48% Booked
Channel Partners
Channel Partners Registered by Developer
Dosti Enterprises
for Project
Dosti West County - Dosti Tulip
last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation