Project overview
Dosti West County - Dosti Tulip is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700032666. Dosti West County - Dosti Tulip is located at Balkum Bhiwandi Wadpa Road, Thane, Thane. This is a New Project being developed by Dosti Enterprises.
Dosti West County - Dosti Tulip has 2 BHK & 3 BHK Apartments with carpet areas ranging from 534 to 873 Sq.ft. Carpet. The Project has total 672 of which 163 are currently available for sale.
Dosti West County - Dosti Tulip is being developed on a total land area of 120664 Sq.ft. out of which 31722 Sq.ft. i.e 26% is reserved for recreational purposes. Dosti West County - Dosti Tulip has 3 Wings / Towers Building 1 Wing A,Building 2 Wing B,Building 3
Project | Developer | Location | Possession |
-
Project:
Dosti West County - Dosti Tulip
-
Location:
-
Balkum Bhiwandi Wadpa Road, Thane, Thane
-
Const. Stage:
New Project
-
Possession:
31 Oct 2026
-
Developer:
Dosti Enterprises
-
Phone:
-
Address:
-
Dosti Group, Lawrence &Amp; Mayo 276, D N Road Fort, Khadibhandar, Mumbai, 400001
MAHA REARA No: |
P51700032666 |
Project Type |
Residential |
RERA Project Status |
New Project |
Architect |
Architect Jay R Vora |
Funding Bank |
KOTAK MAHINDRA BANK |
Proposed Possession |
31 Oct 2026 |
Revised Possession |
|
Extended Possession |
|
Litigations |
Yes |
Last Modified |
04 Feb 2024 |
Last Retrived |
16 Jan 2025 |
Dosti West County - Dosti Tulip QR Code
Dosti West County - Dosti Tulip
MahaRERA - P51700032666
Type | Area |
2 BHK | 45.76 Sq.mts. ( 493 Sq.ft. ) |
2 BHK | 56.74 Sq.mts. ( 611 Sq.ft. ) |
2 BHK | 57.8 Sq.mts. ( 622 Sq.ft. ) |
2 BHK | 65.24 Sq.mts. ( 702 Sq.ft. ) |
3 BHK | 81.13 Sq.mts. ( 873 Sq.ft. ) |
Shop | 13.32 Sq.mts. ( 143 Sq.ft. ) |
Shop | 15 Sq.mts. ( 161 Sq.ft. ) |
Shop | 16.53 Sq.mts. ( 178 Sq.ft. ) |
Shop | 27.22 Sq.mts. ( 293 Sq.ft. ) |
Shop | 27.86 Sq.mts. ( 300 Sq.ft. ) |
Shop | 28.77 Sq.mts. ( 310 Sq.ft. ) |
Shop | 30.2 Sq.mts. ( 325 Sq.ft. ) |
Shop | 30.54 Sq.mts. ( 329 Sq.ft. ) |
Shop | 31.62 Sq.mts. ( 340 Sq.ft. ) |
2 BHK | 49.37 Sq.mts. ( 531 Sq.ft. ) |
2 BHK | 56.43 Sq.mts. ( 607 Sq.ft. ) |
Shop | 13.29 Sq.mts. ( 143 Sq.ft. ) |
Shop | 13.62 Sq.mts. ( 147 Sq.ft. ) |
Shop | 14.96 Sq.mts. ( 161 Sq.ft. ) |
Shop | 27.23 Sq.mts. ( 293 Sq.ft. ) |
Shop | 27.88 Sq.mts. ( 300 Sq.ft. ) |
Shop | 28.81 Sq.mts. ( 310 Sq.ft. ) |
Shop | 30.58 Sq.mts. ( 329 Sq.ft. ) |
Shop | 31.6 Sq.mts. ( 340 Sq.ft. ) |
2 BHK | 49.59 Sq.mts. ( 534 Sq.ft. ) |
2 BHK | 57.92 Sq.mts. ( 623 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Dosti West County - Dosti Tuliplast updated on 16 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
As Per Sanctioned Plan |
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
No Receiving Station |
|
|
Provision Made For Solar Panel On Terrace |
Fire Protection And Fire Safety
Requirements
|
|
As Per Cfo Noc |
Landscaping & Tree Planting
|
|
Provision Made In Layout |
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Provision Made In Layout |
Solid Waste Management And Disposal
|
|
Provision Made In Layout |
|
|
Provision Made In Layout |
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Provision Of Owc Made In Layout |
Water Conservation, Rain water Harvesting
|
|
Provision Made In Layout |
|
|
By Tmc |
Buildings / Wings in Dosti West County - Dosti Tulip
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dosti West County - Dosti Tulip by Dosti Enterpriseslast updated on 16 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
672
apartments in total
Saleable Area Statistics (Sq. ft.)
437926
Total
Total 672 apartments in project. 509 apartments booked. 75% apartments booked.
Total 437926 Sq.ft. saleable area. 332668 saleable area booked.
76% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building 1 Wing A | Oct 2026 | 30 | 1 | 0 | 1 | 3 | 0 | 249 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
2 BHK | 45.76 Sq.mts. ( 493 Sq.ft. ) | 3 | |
2 BHK | 56.74 Sq.mts. ( 611 Sq.ft. ) | 58 | |
2 BHK | 57.8 Sq.mts. ( 622 Sq.ft. ) | 60 | |
2 BHK | 65.24 Sq.mts. ( 702 Sq.ft. ) | 2 | |
3 BHK | 81.13 Sq.mts. ( 873 Sq.ft. ) | 58 | |
Shop | 13.32 Sq.mts. ( 143 Sq.ft. ) | 2 | |
Shop | 15 Sq.mts. ( 161 Sq.ft. ) | 2 | |
Shop | 16.53 Sq.mts. ( 178 Sq.ft. ) | 2 | |
Shop | 27.22 Sq.mts. ( 293 Sq.ft. ) | 2 | |
Shop | 27.86 Sq.mts. ( 300 Sq.ft. ) | 2 | |
Shop | 28.77 Sq.mts. ( 310 Sq.ft. ) | 1 | |
Shop | 30.2 Sq.mts. ( 325 Sq.ft. ) | 1 | |
Shop | 30.54 Sq.mts. ( 329 Sq.ft. ) | 1 | |
Shop | 31.62 Sq.mts. ( 340 Sq.ft. ) | 2 | |
196 total apartments / 185 apartments booked. 94% apartments booked. |
Work Description in Building Building 1 Wing A | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building 2 Wing B | Oct 2026 | 30 | 1 | 0 | 1 | 3 | 0 | 297 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
2 BHK | 49.37 Sq.mts. ( 531 Sq.ft. ) | 52 | |
2 BHK | 56.43 Sq.mts. ( 607 Sq.ft. ) | 60 | |
2 BHK | 56.74 Sq.mts. ( 611 Sq.ft. ) | 58 | |
2 BHK | 65.24 Sq.mts. ( 702 Sq.ft. ) | 3 | |
3 BHK | 81.13 Sq.mts. ( 873 Sq.ft. ) | 57 | |
Shop | 13.29 Sq.mts. ( 143 Sq.ft. ) | 2 | |
Shop | 13.62 Sq.mts. ( 147 Sq.ft. ) | 1 | |
Shop | 14.96 Sq.mts. ( 161 Sq.ft. ) | 2 | |
Shop | 16.53 Sq.mts. ( 178 Sq.ft. ) | 2 | |
Shop | 27.23 Sq.mts. ( 293 Sq.ft. ) | 2 | |
Shop | 27.88 Sq.mts. ( 300 Sq.ft. ) | 2 | |
Shop | 28.81 Sq.mts. ( 310 Sq.ft. ) | 1 | |
Shop | 30.58 Sq.mts. ( 329 Sq.ft. ) | 1 | |
Shop | 31.6 Sq.mts. ( 340 Sq.ft. ) | 2 | |
245 total apartments / 232 apartments booked. 94% apartments booked. |
Work Description in Building Building 2 Wing B | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building 3 | Oct 2026 | 29 | 1 | 0 | 1 | 3 | 0 | 48 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
2 BHK | 49.59 Sq.mts. ( 534 Sq.ft. ) | 52 | |
2 BHK | 56.43 Sq.mts. ( 607 Sq.ft. ) | 60 | |
2 BHK | 56.74 Sq.mts. ( 611 Sq.ft. ) | 29 | |
2 BHK | 57.92 Sq.mts. ( 623 Sq.ft. ) | 30 | |
2 BHK | 65.24 Sq.mts. ( 702 Sq.ft. ) | 1 | |
3 BHK | 81.13 Sq.mts. ( 873 Sq.ft. ) | 59 | |
231 total apartments / 92 apartments booked. 39% apartments booked. |
Work Description in Building Building 3 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Dosti Enterprises
for Project
Dosti West County - Dosti Tulip
last updated on
16 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |