Project overview

Ekta Crest is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800046149. Ekta Crest is located at 4Ydbz2ozvtahtitm3ggo0g==. This is a New being developed by Ekta Housing Private Limited.

Ekta Crest has 3 BHK, EXISTING OWNER & PENT HOUSE Apartments with carpet areas ranging from 1094 to 624 Sq.ft. Carpet. The Project has total 26 of which 0 are currently available for sale.

Ekta Crest is being developed on a total land area of 9896 Sq.ft. out of which 1491 Sq.ft. i.e 15% is reserved for recreational purposes. Ekta Crest has 1 Wings / Towers Ekta Crest

ProjectDeveloperLocationPossession
LegranzEkta Shubham VentureIip02h4c4qdflswhxxymuwky9mx7mg1ydsqicdzkwn4=31-12-2018 00:00:00
OrionNivaan Infratech Private Limited3Mix5lo1q3yqcacptqa2kidwbzfbeozlbpheboesotu=31-12-2017 00:00:00
GeetanjaliKukreja Construction CoP31rfnogjfcq4esmkquobzin+Ldwddgpsqd6dhyk7qbzygrar7v9nddqponfznts/9U6mr4z3iwdxodu9buu4jizrdod7uwfwnezmseb09jvvcpiqbeqwiedgvbaa1yz31-12-2017 00:00:00
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Zlqtqpaehjegd0mw3cvfdkwxgdvrs+Zr2/Nnzqpzlie=30-05-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.1Csmkvu20xokexjjha3xja==31-12-2019 00:00:00
Crystal Armus A To CSterling Buildcon Pvt LtdGvp9qkqpx5cnbw2beb79ndsuvdetjqkxjldsjd3szsujbj1gxbkrbrat0i3lcmy86pdqicmw2zooyc/Wvw2lkckwrbhryoqydefliqh4jijw1uqfyia4cdcumcpvkoaypy1quel8tfobcvahl9fnpg==30-12-2023 00:00:00
Arham AumMahavir Enterprises5N7tt36kmt/P+Fxf9grnwg==31-12-2017 00:00:00
The Golf Boulevard Building - 1Empress & Adishakti JvRsq90vchzchpc4mjx0q9wq==30-06-2022 00:00:00
Chaurang ShraddhaM/S. Chaurang DevelopersGp7cgmaovlrkyskyc7sqqw==31-12-2017 00:00:00
Sabari AshvilleSabari Jani AssociatesPlbtjq/Dxz5y3hsouzoy6x7edozsuehnhq8sgdxmmqe=31-12-2017 00:00:00
ApurvaSidhivinayak ConstructionsAfi/2Vowiqc2zqrb61d4e6f9jyy9s5qle2r0b9v1sro=31-12-2018 00:00:00
Krishvi ResidencyShagun Chembur (Aop)Auip8sa3ojpcpqf83vsywg==31-12-2019 00:00:00
PanoramaEkta Shubham VentureWfhhirekjlxknxo4onmoeq==31-12-2019 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.A3vj8ihzunalfed9holwdlkhrrksjy+Wbczaz5rz2uq=31-03-2019 00:00:00
Harvest MoonCalvin PropertiesWlt9cgarbyra7a4sq2qwje+3Qgwp4q0lgb1le05ijpr6uiyyjx1w9ijy9dx3/C7x31-12-2019 00:00:00
Balaji Arcade Wing CShikhar DevelopersJxsjjp5l3orfmdhomttxejlcocoqkisuwu2x/Mycojb2dwavpgd6sgywj1i2brkj31-12-2019 00:00:00
Shivpuri Building No.10 Chs Ltd - Shivam HeightsSidhivinayak Constructions3Z3dnc7lnnogdyp98aicqotwwqlqsh+0Sej1w8608+Dkrfhw7pycoycq7xpe42bs31-12-2018 00:00:00
Shubham Trident - Sundew, Sunrise And SunglowShubham Homes And Contractors Pvt. Ltd.V5gsrrmp7jmgvrkfdo3r49imxoakhlomi0/Fmmoycoomjsznq75yrbknoss71exe30-12-2023 00:00:00
Heritage PrideHeritage RealtorsLkxrjpwoneeb6wvhhingqbst6q0/Ekoapthn1amcrkvk8ysijcnsiw+Rru0pg7lv30-09-2018 00:00:00
Tridhaatu AumTridhaatu Ventures Llp40008808-07-2012 00:00:00
One Meraki - Wing A & Wing BMeraki Habitats LlpEbgaysclls2fwqrmabjjdwai67hp5gctbvm3uyi+4Zh5cw97agjlvavhrh1jxflzxvnexf+Otadhto08nwairw==30-12-2023 00:00:00
Ekjyot SanmaanDheeraj P Vohra6Lhrwpk8j6evuiegvxlskg==30-12-2023 00:00:00
Tridhaatu PrarambhPanch Tatva RealtyEuvveczir4+Vssyk0qpi8mv+X6uyogsimdopcvqye6zquno+Bx/Bx7ggq7eqn+Ms30-06-2021 00:00:00
Sabari Palm ViewSabari Developers LlpG1npbtzv74hueq16pqipstensepjhexr4rhxrkla5um=31-03-2019 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction Company2G9il53ls2xb1yntnubs+Q==31-12-2018 00:00:00
Amrita PriveSkree Krishna PropertiesIgihpwvslvxnntelr0lsxnhbk6jbe55fzvbt1nxu6cqth44sfowddbyolrvfsziw30-06-2019 00:00:00
Chembur Nandadeep Chs LtdOm Sai Developers400071, Mumbai Suburban, Kurla31-08-2022 00:00:00
Aura Apartments - Phase 2 11Th FloorBholenath Developers Ltd.2N13glzywz7fab4jj55mauejg01sz0gvhwmcsxjv/Xw=31-10-2018 00:00:00
Vandana ArtemisThree Towers Lifespace Llp0Xbm3vnls0kqunva9hktsg==30-12-2021 00:00:00
Swaraj KalashRaj Homes Pyramid GroupOlwtzw/Wnawhbypyp8m0s2em4mb7vehyr1hqfzcpuqiqrm3cvy7rdewk27jkhcp2cjiqawrm49lvhiaap8wnww==30-04-2019 00:00:00
Tulsi ChambersSurana Construction (Chembur )Ojgop6nt2s4ca4fq0ljqza==30-06-2021 00:00:00
Highway View Phase 1Unity Land ConsultancyWkrrbej3is8kyduolwmdgg==30-12-2020 00:00:00
Sahakar Nagar Grace Co-Op. Hsg. Soc. LtdApoorva Homes0Xbm3vnls0kqunva9hktsg==31-12-2019 00:00:00
Raj Ekjyot SukrutiSadguna RealtyIawkxqy0y+G5dhqojdti9a==31-12-2018 00:00:00
Pure GoldSudhir Vasu Shetty7Cds6wggqshsow9ngwg0da==31-03-2018 00:00:00
Hersh Aangan By TridhaatuTridhaatu Bharadwaj Developers Llp5Xpa26mlxw0agjwq9slrjeikid2rmweojmlmjvxfu/Kde0cq2ctz+Ihu1zcuoksh30-12-2023 00:00:00
Building On Plot Bearing Cts No 833 Pt At Mhada Layout As Rna Continental Subhash Nagar Mumbai 71G A Builders Pvt Ltd.Vjwztmsq+Dyuhkdsmrtpbxmtcvfvlguod09uwzuimgjg3jeloa6p3pj0lcxpp7l9kr/Yuqkfpcfwgq+J+S8phs4eakew49wvsvpgkbyd62jgbikvo3dw0qlssmf6xh0o31-01-2021 00:00:00
Little Malabar HillPardis Construction LlpMk7cogdqakqthgxpnlhbz6vayfmj5t35uhw1vn9hm1dwcj1xb4g1pas2riudu/Zg30-09-2020 00:00:00
Sabari ShobhaSabari Developers LlpH0cectqw7zj+1Z37zugrqwdsp9szj0ucg5dyrq+Xetlt8ocheg6zmpe/Blhxiorf30-11-2020 00:00:00
Safal Sky Redevelopment Of Ameya Chs LtdVarun Homes Pvt LtdIye8ox2ogejj/Dbs1io92edwlza7z84/Bhe0lx2cwnk=31-08-2020 00:00:00
StevelandCalvin PropertiesWavnnv5e7oukrefkmhwktpnqoxfujur7q5cwbdv3q8droz7yfk0emxoueajd/Awhptwhxwgurzji3pccyaio8g==30-12-2021 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles & Developers Pvt.Ltd.S0bndgvhy54ah0i8xfoju0skgcaqmgbhef70unelxkv/Vpd8lr3ticzfwz3isneq31-12-2019 00:00:00
SamaraCharisma Builders LtdG/Zudwj/J9iq5vegua2jhi/1Gwdguelq3npvxxprux4sfkj6ze3ulalpujmcyqdbkqp9pz2ir2ni8bbh5xzwcqbk3rxl9xnycyi6uoxs6xv7+Dupbapd5offwovm3amc30-03-2024 00:00:00
InnoventuresInnoventures Infrastructure Pvt LtdUslygxtg6ds8biwi9ibgoa==30-12-2024 00:00:00
United ElicasIi Walls Infra Llp60Wawfcqkeoatzfi2exehrb6qhssphnuhmfbljfuv5hohle6u8nlzniho6yen60q1knv6kv43k6qbycoioqy75ric6xepxoaksmohntwat8=30-12-2024 00:00:00
Central ParkShree Ganesh EnterprisesDgaghxrwikybev0sfdtalq5xcvyafgjmddosqrvujgc=31-12-2019 00:00:00
Andheri Sriram Krupa And Gurudev Nityanand Co-Operative Housing SocietyParsh Housing Pvt LtdJr1r0ljucemf2l8ksyfefw==30-09-2021 00:00:00
Chembur Shri Sai Shraddha ChsUnity Land ConsultancyUu516uyizwtwu7f590gn5g==31-12-2018 00:00:00
Vishnu ApolloThree Towers Lifespace Llp0Xbm3vnls0kqunva9hktsg==30-12-2021 00:00:00
Safal Sai And Safal SainathMangalnath Developers Pvt LtdInsafrztgkgyshxh7cz0xjxi4rkkc3wrtz4qbiwdrwc+Pylsy4vgnbs2+Cyc+Npa3amkbbvqdxgsvso+Gontcrvxoux4ycadwn4b5xhpnqm=30-12-2023 00:00:00
EdificeBuildproPo6qgihehk7mpxmgwog+Bcinmddypwuhkdp5odpvwuk=31-12-2017 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Ariso ApartmentKyraa Housing Projects2Kv9bhmzn6qao0mchai+Dfjxjjkl3jh6azlkoske11/9Xxkm4padrs5dgatrk+Xv30-12-2024 00:00:00
AbhilashSanjona Builders400071, Mumbai Suburban30-12-2017 00:00:00
Pearl BellezaChembur Hotels Private LimitedQfvsozer7phyhs0oav5sda==31-12-2018 00:00:00
Simran HeightsVikas Narayan Raikar+Yzqgustbnvdtldubbtni0xsiwldfrquxqoshoohz9bun5hoog30e1gia9sccszlc+1Asmqpwd+5K6ec2g2co2n+Jwz4wdf0dqf1xqw1ay01gmrzxkw3n6n/Uhsgsh3eubhmbymelq2rdyq2qa+Ndw==24-09-2019 00:00:00
AeraRe Infra Pvt Ltd28B7lchiwx5z4vdtx/0Cyjaralyx5ntu70ydetlhiiu=31-12-2018 00:00:00
Sai LeelaVriti Infrastructure Pvt. Ltd.F470oeedbdxcrc0cfgr1aph/T8dqw/E4+635Aeiqf2wgjm4fpnmrs+Gmtz2u/E83n93dfxtywe274q6juiwdug==31-12-2017 00:00:00
Hresa - Sainagar Apartment Pvt. Ltd.Bholenath Developers Ltd.Quq4zh2cqgpyl6grh7wr6fsslcj78udkm6uukqmgckw8wky8hf8qsu783/F5aeon14-11-2022 00:00:00
Shrikant Chembers IiShrikant Studios Pvt. Ltd.400071, Mumbai Suburban31-03-2022 00:00:00
Maa KamalVirat BuildersLmcfffmpxuidhdt7rhm3iq==31-07-2019 00:00:00
Chembur Manshanti ChslMenorah Realties Private LimitedDdhs1xpvl74eupnauimtsqdp2t5f4yioro4fv2re0gf2bhxsznghlgod5bm5pwk630-12-2023 00:00:00
Poonam EnclavePrakash PatelMumbai Suburban, 40007131-12-2015 00:00:00
LourdesVictor Homes Pvt Ltd40007130-12-2023 00:00:00
Parvati SadanMeena Builder Unit Of V N Raikar HufE/4M4d6l3/I58rz3rfkp1w==30-06-2021 00:00:00
Meraki ArenaMeraki Habitats LlpXmb7y7npasoee6pfyfo9lqrxj6z9qvhesira53gjro2kfkt9nxxvu4yr9jhjohngnc7di6wzx3j3qtxhpkllba==30-11-2020 00:00:00
RajeswariShree Krishna Homes Pvt LtdEuapfw9stv46l2mixsuhyf/Lzndq03aupnl11dpjwdrvskj9j+Djsqjvrdnankv526lrfi6il9d2uwprtx26vw==31-12-2017 00:00:00
Uday BuildingVikram Developers Private LimitedMumbai Suburban, 40008131-12-2019 00:00:00
RudrakshSandu DevelopersEnzojc9gzq3zy6j8ougvd90tijorxknfqd+Bb0puyac=31-10-2018 00:00:00
Udaya BhuvanShree Krishna Homes Pvt LtdTufqc39qybdr8mechuot/W==31-03-2019 00:00:00
JaihindS.P. Erectors And Developers Private Limited9G9mpzib84gu2u0wgbxa5a==31-12-2023 00:00:00
Le JardinJay Construction IndiaRnsb/6Fiegb2bmbciozzkcr8tc/Mf3ockzqqlcb9ftq=18-05-2018 00:00:00
Krishna NiwasShree Krishna Homes Pvt LtdHftfhuh0ueoewnlild8z0g==31-12-2017 00:00:00
NishirajUnique Builders & DevelopersQk5jh782+Wqvo5fcumgjc6mtu8doykjogrcdznwtnsi=31-03-2019 00:00:00
Subhash Nagar Building No 22G A Builders Pvt Ltd.Mumbai Suburban, 40007130-04-2022 00:00:00
Balaji EmpireM/S Trimurti &Amp; K. Mukesh Builders And DevelopersMumbai Suburban, 40007131-12-2008 00:00:00
Kranti HeightsSidhivinayak ConstructionsSkovcgaap3dtiyi+9Zks6q==30-09-2026 00:00:00
Akshar Amar MansionAkshar PropertiesOqyalikqq1rdcmcwunq3ww==31-12-2025 00:00:00
Arihant SkyArihant Builders & Developers0P2j2wk435wcxwqh2ohlhsbtcplr5s+Lagiczpaze5s=30-12-2026 00:00:00
Vishwa BhuvanMajestic Royale City DevelopersIrmbm9gmkwahzl25tkqmfrl+Gjxg3paasmoncvi67kq=31-03-2026 00:00:00
Vighnaharta Sra Chs LtdParsn Construction And Developers Private LimitedDjdn5glruvgpmti3743rrqhnu54ugisodv0durtrmengspz+Q1ummatzabfb1umg30-12-2024 00:00:00
The HarvestBindu Raheja And Sons Llp4Npdcso605o1plqxqap5dw==30-06-2028 00:00:00
Poddar Spraha Diamond Phase-IPoddar Housing And Development LimitedYzs6ldsd5jgmdf6q+2Z17t3yziz2chxzq02l9urz440=30-12-2021 00:00:00
Heritage SignatureHeritage Homes992/1-6, 99201-05-2025 00:00:00
RADHA CONTINENTALSACVIR DIMENSIONS LLPCentral Avenue Road, Chembur, 40007131-10-2027 00:00:00
Tricity NatrajTricity Realty Llp2Fvpssxcptlyvygpdi4wda==31-12-2025 00:00:00
Manshaya ApartmentsMass ConstructionFacvgi5golpjkj0jazmo/A==31-12-2026 00:00:00
InsigniaTwo Taurus Realty Llp36Tyxwwpap/Yp7ido5hlsipg5tt6bx9jo5vginzdjvko7nawyaxxuvpirzi+4Wch31-12-2026 00:00:00
27 PallazzoSiddharth Pankaj ChothaniNogbs845os59iqffgm0jzw==31-12-2025 00:00:00
Queens GloryVaibhavlaxmi Builders And Developers37Ssakgvkgq7e2d20futbw==31-12-2027 00:00:00
Serenity HeightsS And T DevelopersUqhiyviobpnikfwkesavnnha89rzuz9pljvftwkjy3s=31-12-2027 00:00:00
VishvaK.D AssociatesIktyke4zn6ajayueclr1yfbfusodghisu2mie/Iy5wxmlcvazfb+Rpgh/Yggpsbthgdt/Pwajdisof71hlohna==30-05-2029 00:00:00
Tridhaatu Aranya - A DreamTridhaatu Aranya Developers LlpYgmq5rk0qioap+7Cfvg7cb7mulyys2lwcy4fufrlp2+Mvmxarpuswqua7j+Rvmtatk7bmvgy3c5k4g1ufwio3g==31-12-2027 00:00:00
Rgs AnantyaSingh Holding Pvt LtdLuiq0ccm9vcnbcydbkkgtg==30-06-2023 00:00:00
Srushti EnclaveGadkari Builders & Associates5Ed5lht3eh6qgyt0ico+Lvvlu1pbymnn/Kor02pxedobt7t1rxmb2lwfwtbbnj6e31-12-2019 00:00:00
Godrej RksGodrej Projects Development Limited2Dpmjaptuv7ie6d+Wweuv9bbqv7dbb/Vgugsqkrlmcjjtukuaerah5yd2mzyrlqp35hs14v+F8mkxondlzh8vq==30-12-2024 00:00:00
Girivan La QuintaAbhishek Mahesh GarodiaU8vv7n1vb2x6ib0lkvsts9vzbjjwo5ysz51bgz/Sy38=30-04-2025 00:00:00
Casa CelesteAster Developers400071, Mumbai City31-12-2019 00:00:00
A.R VintageA.R AssociatesLtdmkpkuips1mzz3cloht8ftolasdvwyg7bfenjyjr0=30-05-2022 00:00:00
Shree VaniShree Krishna Properties31-03-2028 00:00:00
Prima Complex5Th Avenue Habitat Llp30-06-2028 00:00:00
One UttamShree Krishna Living Llp31-12-2029 00:00:00
One UttamShree Krishna Living Llp31-12-2029 00:00:00
Ekta CrestEkta Housing Private Limited4Ydbz2ozvtahtitm3ggo0g==31-12-2025 00:00:00
Jaydeep And Gami EvaraM/S Real Infrastructure Co31-12-2028 00:00:00
Golfshire BVensco Projects Llp31-12-2030 00:00:00
Project Details
  • Project:
    Ekta Crest
  • Location:
  • 4Ydbz2ozvtahtitm3ggo0g==
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Ekta Housing Private Limited
  • Phone:
  • Address:
  • Excel Media And Entertainment
Project RERA Details
MAHA REARA No: P51800046149
Project Type Residential / Group Housing
RERA Project Status New
Architect B H Wadhwa & Chhadva Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 20 Jun 2022
Last Retrived 13 Feb 2026
Ekta Crest QR Code
Ekta Crest
MahaRERA - P51800046149
Apartment Details & Configuration
TypeArea
3 BHK101.65 Sq.mts. ( 1094 Sq.ft. )
3 BHK116.16 Sq.mts. ( 1250 Sq.ft. )
EXISTING OWNER57.75 Sq.mts. ( 622 Sq.ft. )
EXISTING OWNER57.99 Sq.mts. ( 624 Sq.ft. )
PENT HOUSE155.7 Sq.mts. ( 1676 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ekta Crestlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Yet To Start
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
There Will Be No Receiving Station
Energy management
Yet To Start
Fire Protection And Fire Safety Requirements
Yet To Start
GYMNASIUM
Yet To Start
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Septic Tank And Stp
SOCIETY OFFICE
Yet To Start
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
Yet To Start
Buildings / Wings in Ekta Crest
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ekta Crest by Ekta Housing Private Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

9896 Sq. ft.

Project Area

1491 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

26 apartments in total
Total
26
Booked
26
Available
0

Saleable Area Statistics (Sq. ft.)

31367 Total
Total
31367
Booked
31367
Available
0
Total 26 apartments in project. 26 apartments booked. 100% apartments booked.
Total 31367 Sq.ft. saleable area. 31367 saleable area booked.
100% area booked.

Ekta Crest

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ekta CrestDec 202516101201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK101.65 Sq.mts. ( 1094 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK116.16 Sq.mts. ( 1250 Sq.ft. )12
12 Booked100% Booked
100% Booked
EXISTING OWNER116.16 Sq.mts. ( 1250 Sq.ft. )9
9 Booked100% Booked
100% Booked
EXISTING OWNER57.75 Sq.mts. ( 622 Sq.ft. )1
1 Booked100% Booked
100% Booked
EXISTING OWNER57.99 Sq.mts. ( 624 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENT HOUSE155.7 Sq.mts. ( 1676 Sq.ft. )1
1 Booked100% Booked
100% Booked
26 total apartments / 26 apartments booked. 100% apartments booked.
Work Description in Building Ekta CrestCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress83% done
83% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress62% done
62% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked
Channel Partners
Channel Partners Registered by Developer
Ekta Housing Private Limited
for Project
Ekta Crest
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation