Project overview

EKTA PARKSVILLE PHASE I is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000000116. EKTA PARKSVILLE PHASE I is located at 96/178, 7A Pt/7B Pt, 93/177/1/2 Pt. This is a Ongoing being developed by EKTA PARKSVILLE HOMES PVT. LTD..

EKTA PARKSVILLE PHASE I has 2 BHK Apartments with carpet areas ranging from 468 to 522 Sq.ft. Carpet. The Project has total 647 of which 15 are currently available for sale.

EKTA PARKSVILLE PHASE I is being developed on a total land area of 30601 Sq.ft. out of which 11229 Sq.ft. i.e 37% is reserved for recreational purposes. EKTA PARKSVILLE PHASE I has 9 Wings / Towers Central Park A Wing,Central Park B Wing,Central Park C Wing,Central Park D Wing,Central Park E Wing,Central Park F Wing,Central Park G Wing,Central Park H Wing,Central Park K Wing

ProjectDeveloperLocationPossession
GARDEN AVENUE - K K3SRIDUTT CONSTRUCTIONS5,5B30-12-2023 00:00:00
Acropolis 1Bhoomi & Arkade Associates37-46 Part 51-67Part 98-121Part 124 145 147 368 And Others As Per Title Certificate Attached30-12-2021 00:00:00
BHAVANI VIEWBhavani Construction91/176 Hissa No. 1/231-12-2019 00:00:00
Mahavir DarshanMahavir Realtors40130331-12-2020 00:00:00
VINAY UNIQUE HOMESVINAYUNIQUE REALTORSSurvey No 9131-12-2019 00:00:00
COSMOS SQUARESHRIPAL DEVELOPERS5 5B 5F 5G 5D30-12-2021 00:00:00
POONAM VISTAPABAL HOUSING PRIVATE LIMITED5/630-06-2025 00:00:00
SUPER HOMEZ - HARMONYMANGALMURTI VINAY UNIQUE REALTORSSurvey No 117, Hissa No 1 And 230-06-2027 00:00:00
EKTA PARKSVILLE PHASE IIIEKTA PARKSVILLE HOMES PVT. LTD.91/176, 94/185 Pt30-12-2020 00:00:00
BROOKLYN PARK PHASE IIEKTA PARKSVILLE HOMES PVT. LTD.69-172 Part, 14-438 Part31-10-2019 00:00:00
EKTA PARKSVILLE PHASE IIEKTA PARKSVILLE HOMES PVT. LTD.90/183 7/4 7/5Pt30-06-2021 00:00:00
EKTA PARKSVILLE PHASE IEKTA PARKSVILLE HOMES PVT. LTD.96/178, 7A Pt/7B Pt, 93/177/1/2 Pt31-12-2019 00:00:00
BROOKLYN PARK PHASE IEKTA PARKSVILLE HOMES PVT. LTD.69/172 Pt31-05-2019 00:00:00
BROOKLYN PARK PHASE IIIEKTA PARKSVILLE HOMES PVT. LTD.70/174 Pt, 69/172 Pt, 71/173 Pt28-02-2020 00:00:00
BACHRAJ LANDMARKBACHRAJ DEVELOPERS5,5B01-12-2018 00:00:00
Shree Shakun GreensShree Shakun Realty Pvt Ltd86/187 Hissa No 1 87/186 Hissa No 1 And 2 31-12-2019 00:00:00
Star HeightsStar Developers401203, Palghar31-12-2019 00:00:00
Ekta Parksville Phase IVEKTA PARKSVILLE HOMES PVT. LTD.91/176 1/2Pt, 91/176 2Pt, 91/176 3Pt30-06-2022 00:00:00
RUSTOMJEE VIRAR AVENUE D1 WING C AND WING DKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDAvenue D1 Pt Forming Part Of Larger Layout Bearing New Survey Numbers 5 5B 5D 5F 5G Village Dongre 30-12-2021 00:00:00
POONAM PARK VIEW PHASE IPOONAM HOMEMAKER LLPS No 5, 5B30-06-2019 00:00:00
VINAY UNIQUE HEIGHTSSUV DEVELOPERSSurvey No 71 Hissa No 1/1, 1/331-12-2019 00:00:00
RUSTOMJEE VIRAR AVENUE D1 WING A AND WING B AND RETAIL BUILDINGKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDAvenue D1 Pt Forming Part Of Larger Layout Bearing New Survey Numbers 5 5B 5D 5F 5G Village Dongre30-12-2021 00:00:00
Rustomjee Virar Avenue L1-L2 and L4 Wing A B and Retail BuildingKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPart Of Avenue L1-L2 L4 Being Pt Of Larger Layout Bearing Surve Nos 5 5B 5D 5F 5G Of Village Dongre31-07-2022 00:00:00
VINAY UNIQUE IMPERIAIMPERIUM BUILDCON LLP45, 46, 4731-12-2019 00:00:00
BLU PEARLSB LIFESPACES PVT LTD5, 5B04-10-2022 00:00:00
PRIYESH HEIGHTSPRIYESH ENTERPRISES91/176 Hissa No.230-06-2021 00:00:00
BROOKLYN PARKCHANDIWALA ENTERPRISES401303, Palghar31-12-2018 00:00:00
Cosmos SolitaireCosmos Prime Projects Ltd70 174/330-12-2022 00:00:00
LABH HEIGHTSLABH ASSOCIATESS No 87 H No 1 S No 88 H No 1 S No 89 H No 1 S No 90 H No 7/7 7/831-03-2019 00:00:00
RACHNA TOWERSVIKRAM BUILDWELL PVT LTDS No 65 H No 1 S No 66 H No 8 9 18 19 20 21 22/4 S No 68 H No 1 S No 72 H No 3/231-12-2019 00:00:00
Rustomjee Virar Avenue L1-L2 And L4 Wing C and DKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPart Of Avenue L1-L2- L4 Being Pt Of Larger Layout Bearing Surve Nos 5 5B 5D 5F 5G Of Village Dongre31-07-2022 00:00:00
Rustomjee Virar Avenue L1-L2 And L4 Wing E and F and Retail BuildingKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPart Of Avenue L1-L2 -L4 Being Pt Of Larger Layout Bearing Surve Nos 5 5B 5D 5F 5G Of Village Dongre28-02-2023 00:00:00
GARDEN AVENUE K- K4SRIDUTT CONSTRUCTIONS5,5B31-12-2018 00:00:00
Sumit Greendale NXSumit Pragati Shelters LLP5,5B31-10-2018 00:00:00
Mahavir HeightsMehta & Sons66/4 66/5 66/21 66/22/1/2/3/4 66/23 66/24/1/2 72/2/331-12-2019 00:00:00
YASH PLATINAMD REALTORS & DEVELOPERS LLPSurvey No. 346B And 356B Hissa No. B1 To B5, C And Survey No. 347C Hissa No. 1 And 2 And Survey No. 347A Hissa No. 4 Of Village Bolinj And Survey No. 21B Hissa No. 3 Of Village Dongare.30-09-2025 00:00:00
Jivdani VaibhavlaxmiKishor PatilPalghar, Virar West, 40130331-12-2023 00:00:00
Ocean PearlM.M.ConstructionVasai31-12-2020 00:00:00
MAITRY HEIGHTSRAJ MAITRY & ESKON DEVELOPERS65,46,66 Part31-07-2019 00:00:00
RME PLAZARME ASSOCIATES5,5B31-07-2018 00:00:00
Rustomjee Virar Avenue L1-L2 and L4 Wing KKEYSTONE INFRASTRUCTURE PRIVATE LIMITEDPt Of Avenue L1 L2 L4 Being Pt Of Larger Layout Being Sy No 5 5B 5D 5F 5G Of Village Dongre30-09-2023 00:00:00
BHAVANI HEIGHTSBhavani Developers69/172 Hissa No.5 , 72/167 Hissa No.3/1/1, 3/1/2.31-12-2019 00:00:00
Mahavir GardenMahavir DevelopersVirar West28-12-2018 00:00:00
ESSAR APEXARSIWALA CONSTRUCTIONS PRIVATE LIMITEDS.No.91 H.S.28,30-06-2021 00:00:00
VAMA PARADISEVAMA LIFESTYLES45/150 P.T30-12-2019 00:00:00
Swastick HeightsShree Swastick Builders7031-01-2019 00:00:00
Gokul Dham HeightsMayur DeshmukhShree Radha Krishna Mandir31-03-2023 00:00:00
Dhananjay SquareOM SADGURU ASSOCIATES1/A/1/1/10/1031-12-2026 00:00:00
ACROPOLIS 2Bhoomi & Arkade Associates37-46 Part 51-57Part 98-121Part 124, 145-147Part 368 And Others As Per Title Certificate Attached30-12-2022 00:00:00
Mandar AssociatesMandar AssociatesPalghar, 40130331-07-2019 00:00:00
Shree Nath Nagar No 1 And 2Shreenath Enterprises401203, Palghar31-07-2022 00:00:00
VINAY UNIQUE GARDENSVINAYUNIQUE DEVELOPERS93-2, 94-1,2,3,4,5,6,7,831-12-2019 00:00:00
Sun HeightsSun Vinay Unique Realty LlpChikhal Dongre Road30-06-2019 00:00:00
EVARANEMINATH POONAM REALTY LLP5/1, 5/2, 5/3, 5/4, 5/5A, 5/5B, 5/5C, 5/5D 5/5E31-12-2030 00:00:00
Project Details
  • Project:
    EKTA PARKSVILLE PHASE I
  • Location:
  • 96/178, 7A Pt/7B Pt, 93/177/1/2 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    EKTA PARKSVILLE HOMES PVT. LTD.
  • Phone:
  • Address:
  • Excel Entertainment
Project RERA Details
MAHA REARA No: P99000000116
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ajay Wade & Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 31 Mar 2023
Litigations No Litigations
Last Modified 25 Jul 2025
Last Retrived 14 Feb 2026
EKTA PARKSVILLE PHASE I QR Code
EKTA PARKSVILLE PHASE I
MahaRERA - P99000000116
Apartment Details & Configuration
TypeArea
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )
SHOP42A21.94 Sq.mts. ( 236 Sq.ft. )
SHOP42B18.55 Sq.mts. ( 200 Sq.ft. )
SHOP42C23.06 Sq.mts. ( 248 Sq.ft. )
SHOP42D23.68 Sq.mts. ( 255 Sq.ft. )
SHOP42E19.99 Sq.mts. ( 215 Sq.ft. )
SHOP42F24.8 Sq.mts. ( 267 Sq.ft. )
SHOP3620.55 Sq.mts. ( 221 Sq.ft. )
SHOP3717.05 Sq.mts. ( 184 Sq.ft. )
SHOP3819.85 Sq.mts. ( 214 Sq.ft. )
SHOP3920.37 Sq.mts. ( 219 Sq.ft. )
SHOP4017.18 Sq.mts. ( 185 Sq.ft. )
SHOP4121.38 Sq.mts. ( 230 Sq.ft. )
2 BHK45 Sq.mts. ( 484 Sq.ft. )
3 BHK74.28 Sq.mts. ( 800 Sq.ft. )
SHOP2213.16 Sq.mts. ( 142 Sq.ft. )
SHOP2312.29 Sq.mts. ( 132 Sq.ft. )
SHOP2414.35 Sq.mts. ( 154 Sq.ft. )
SHOP2513.19 Sq.mts. ( 142 Sq.ft. )
SHOP2617.42 Sq.mts. ( 188 Sq.ft. )
SHOP2716.28 Sq.mts. ( 175 Sq.ft. )
SHOP2813.61 Sq.mts. ( 146 Sq.ft. )
SHOP297.49 Sq.mts. ( 81 Sq.ft. )
SHOP3016.39 Sq.mts. ( 176 Sq.ft. )
SHOP3114.88 Sq.mts. ( 160 Sq.ft. )
SHOP3216.83 Sq.mts. ( 181 Sq.ft. )
SHOP3319.84 Sq.mts. ( 214 Sq.ft. )
SHOP3415.34 Sq.mts. ( 165 Sq.ft. )
SHOP3520.03 Sq.mts. ( 216 Sq.ft. )
SHOP1815.26 Sq.mts. ( 164 Sq.ft. )
SHOP1915.69 Sq.mts. ( 169 Sq.ft. )
SHOP2013.24 Sq.mts. ( 143 Sq.ft. )
SHOP2116.47 Sq.mts. ( 177 Sq.ft. )
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )
SHOP1011.79 Sq.mts. ( 127 Sq.ft. )
SHOP1110.21 Sq.mts. ( 110 Sq.ft. )
SHOP1213.93 Sq.mts. ( 150 Sq.ft. )
SHOP1312.67 Sq.mts. ( 136 Sq.ft. )
SHOP1415.13 Sq.mts. ( 163 Sq.ft. )
SHOP1614.44 Sq.mts. ( 155 Sq.ft. )
SHOP1714.86 Sq.mts. ( 160 Sq.ft. )
SHOP914.77 Sq.mts. ( 159 Sq.ft. )
SHOP114.46 Sq.mts. ( 156 Sq.ft. )
SHOP211.09 Sq.mts. ( 119 Sq.ft. )
SHOP319.14 Sq.mts. ( 206 Sq.ft. )
SHOP411.08 Sq.mts. ( 119 Sq.ft. )
SHOP58.94 Sq.mts. ( 96 Sq.ft. )
SHOP619.04 Sq.mts. ( 205 Sq.ft. )
SHOP712.36 Sq.mts. ( 133 Sq.ft. )
SHOP816.92 Sq.mts. ( 182 Sq.ft. )
2 BHK47.3 Sq.mts. ( 509 Sq.ft. )
2 BHK47.98 Sq.mts. ( 516 Sq.ft. )
2 BHK43.45 Sq.mts. ( 468 Sq.ft. )
2 BHK43.52 Sq.mts. ( 468 Sq.ft. )
2 BHK43.63 Sq.mts. ( 470 Sq.ft. )
2 BHK48.47 Sq.mts. ( 522 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of EKTA PARKSVILLE PHASE Ilast updated on 14 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Children Play Area100% completed
95% Complete
To Be Handed Over To Apex Body
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Solar Lights Provided Only On Landscape Area
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Work In Progress
Gazebo100% completed
95% Complete
To Be Handed Over To Apex Body
Jogging Track100% completed
95% Complete
To Be Handed Over To Apex Body
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed.
Shrub Beds100% completed
95% Complete
To Be Handed Over To Apex Body
Solid Waste Management And Disposal100% completed
95% Complete
Own Machine Installed
Storm Water Drains100% completed
95% Complete
Completed.
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Work In Progress
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in EKTA PARKSVILLE PHASE I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of EKTA PARKSVILLE PHASE I by EKTA PARKSVILLE HOMES PVT. LTD.last updated on 14 Feb 2026 as per information obtained from MARA RERA.

30601 Sq. ft.

Project Area

11229 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

647 apartments in total
Total
647
Booked
632
Available
15

Saleable Area Statistics (Sq. ft.)

270532 Total
Total
270532
Booked
263134
Available
7398
Total 647 apartments in project. 632 apartments booked. 97% apartments booked.
Total 270532 Sq.ft. saleable area. 263134 saleable area booked.
97% area booked.

Central Park A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park A WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )28
28 Booked100% Booked
100% Booked
SHOP42A21.94 Sq.mts. ( 236 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP42B18.55 Sq.mts. ( 200 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP42C23.06 Sq.mts. ( 248 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP42D23.68 Sq.mts. ( 255 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP42E19.99 Sq.mts. ( 215 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP42F24.8 Sq.mts. ( 267 Sq.ft. )1
1 Booked100% Booked
100% Booked
62 total apartments / 62 apartments booked. 100% apartments booked.
Work Description in Building Central Park A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the flats / premises
work-in-progress83% done
83% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park B WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )28
28 Booked100% Booked
100% Booked
SHOP3620.55 Sq.mts. ( 221 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3717.05 Sq.mts. ( 184 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3819.85 Sq.mts. ( 214 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3920.37 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP4017.18 Sq.mts. ( 185 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP4121.38 Sq.mts. ( 230 Sq.ft. )1
1 Booked100% Booked
100% Booked
62 total apartments / 62 apartments booked. 100% apartments booked.
Work Description in Building Central Park B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the flats / premises
work-in-progress83% done
83% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park C WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )56
56 Booked100% Booked
100% Booked
2 BHK45 Sq.mts. ( 484 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK74.28 Sq.mts. ( 800 Sq.ft. )15
15 Booked100% Booked
100% Booked
SHOP2213.16 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2312.29 Sq.mts. ( 132 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2414.35 Sq.mts. ( 154 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2513.19 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2617.42 Sq.mts. ( 188 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2716.28 Sq.mts. ( 175 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2813.61 Sq.mts. ( 146 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP297.49 Sq.mts. ( 81 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3016.39 Sq.mts. ( 176 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3114.88 Sq.mts. ( 160 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3216.83 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3319.84 Sq.mts. ( 214 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3415.34 Sq.mts. ( 165 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP3520.03 Sq.mts. ( 216 Sq.ft. )1
1 Booked100% Booked
100% Booked
100 total apartments / 100 apartments booked. 100% apartments booked.
Work Description in Building Central Park C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress89% done
89% Booked
Sanitary Fittings within the flats / premises
work-in-progress89% done
89% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park D WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )28
28 Booked100% Booked
100% Booked
SHOP1815.26 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP1915.69 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2013.24 Sq.mts. ( 143 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP2116.47 Sq.mts. ( 177 Sq.ft. )1
1 Booked100% Booked
100% Booked
60 total apartments / 60 apartments booked. 100% apartments booked.
Work Description in Building Central Park D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress89% done
89% Booked
Sanitary Fittings within the flats / premises
work-in-progress89% done
89% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park E WingDec 201916101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )56
56 Booked100% Booked
100% Booked
SHOP1011.79 Sq.mts. ( 127 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP1110.21 Sq.mts. ( 110 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP1213.93 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP1312.67 Sq.mts. ( 136 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP1415.13 Sq.mts. ( 163 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP1511.79 Sq.mts. ( 127 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP1614.44 Sq.mts. ( 155 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP1714.86 Sq.mts. ( 160 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP914.77 Sq.mts. ( 159 Sq.ft. )1
1 Booked100% Booked
100% Booked
66 total apartments / 66 apartments booked. 100% apartments booked.
Work Description in Building Central Park E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress84% done
84% Booked
Sanitary Fittings within the flats / premises
work-in-progress84% done
84% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park F WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )56
56 Booked100% Booked
100% Booked
2 BHK45 Sq.mts. ( 484 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )28
28 Booked100% Booked
100% Booked
SHOP114.46 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP211.09 Sq.mts. ( 119 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP319.14 Sq.mts. ( 206 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP411.08 Sq.mts. ( 119 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP58.94 Sq.mts. ( 96 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP619.04 Sq.mts. ( 205 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP712.36 Sq.mts. ( 133 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP816.92 Sq.mts. ( 182 Sq.ft. )1
1 Booked100% Booked
100% Booked
107 total apartments / 107 apartments booked. 100% apartments booked.
Work Description in Building Central Park F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress88% done
88% Booked
Sanitary Fittings within the flats / premises
work-in-progress88% done
88% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park G WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )54
54 Booked100% Booked
100% Booked
2 BHK45 Sq.mts. ( 484 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK74.28 Sq.mts. ( 800 Sq.ft. )14
14 Booked100% Booked
100% Booked
82 total apartments / 82 apartments booked. 100% apartments booked.
Work Description in Building Central Park G WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress84% done
84% Booked
Sanitary Fittings within the flats / premises
work-in-progress84% done
84% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park H WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.3 Sq.mts. ( 509 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK47.98 Sq.mts. ( 516 Sq.ft. )28
28 Booked100% Booked
100% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )12
12 Booked100% Booked
100% Booked
54 total apartments / 54 apartments booked. 100% apartments booked.
Work Description in Building Central Park H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress82% done
82% Booked
Sanitary Fittings within the flats / premises
work-in-progress82% done
82% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Central Park K Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Central Park K WingDec 201916101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK43.45 Sq.mts. ( 468 Sq.ft. )12
7 Booked58% Booked
58% Booked
2 BHK43.52 Sq.mts. ( 468 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK43.63 Sq.mts. ( 470 Sq.ft. )14
12 Booked85% Booked
85% Booked
2 BHK48.47 Sq.mts. ( 522 Sq.ft. )14
7 Booked50% Booked
50% Booked
54 total apartments / 39 apartments booked. 72% apartments booked.
Work Description in Building Central Park K WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
EKTA PARKSVILLE HOMES PVT. LTD.
for Project
EKTA PARKSVILLE PHASE I
last updated on 14 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation