Project overview

Evershine Amavi 303 Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000024780. Evershine Amavi 303 Phase 1 is located at Chikhadongari Road, Global City Virar West, Global City Virar West. This is a New Project being developed by Evershine Developers.

Evershine Amavi 303 Phase 1 has 2 BHK & Shop Apartments with carpet areas ranging from 143 to 573 Sq.ft. Carpet. The Project has total 705 of which 254 are currently available for sale.

Evershine Amavi 303 Phase 1 is being developed on a total land area of 179350 Sq.ft. out of which 31248 Sq.ft. i.e 17% is reserved for recreational purposes. Evershine Amavi 303 Phase 1 has 10 Wings / Towers Building No 14,Building No 15,Building No 16,Building No 18,Building No 19,Building No 20,Building No 21,Building No 22,Building No 23,Building No17

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Evershine Amavi 303 Phase 1
  • Location:
  • Chikhadongari Road, Global City Virar West, Global City Virar West
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Evershine Developers
  • Phone:
  • Address:
  • 215, Veena Beena Shopping Centre, Guru Nanak Rod, Opp. Bandra Railwaystation, Bandra West, 400050
Project RERA Details
MAHA REARA No: P99000024780
Project Type Residential
RERA Project Status New Project
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 Feb 2024
Last Retrived 13 Jan 2025
Evershine Amavi 303 Phase 1 QR Code
Evershine Amavi 303 Phase 1
MahaRERA - P99000024780
Apartment Details & Configuration
TypeArea
2 BHK44.55 Sq.mts. ( 480 Sq.ft. )
2 BHK46.49 Sq.mts. ( 500 Sq.ft. )
Shop21.6 Sq.mts. ( 233 Sq.ft. )
Shop22.19 Sq.mts. ( 239 Sq.ft. )
Shop24.08 Sq.mts. ( 259 Sq.ft. )
Shop34.93 Sq.mts. ( 376 Sq.ft. )
Shop24.09 Sq.mts. ( 259 Sq.ft. )
2 BHK53.21 Sq.mts. ( 573 Sq.ft. )
Shop13.26 Sq.mts. ( 143 Sq.ft. )
Shop18.02 Sq.mts. ( 194 Sq.ft. )
Shop18.6 Sq.mts. ( 200 Sq.ft. )
Shop24.65 Sq.mts. ( 265 Sq.ft. )
Shop30.4 Sq.mts. ( 327 Sq.ft. )
2 BHK51.11 Sq.mts. ( 550 Sq.ft. )
2 BHK51.38 Sq.mts. ( 553 Sq.ft. )
2 BHK52.15 Sq.mts. ( 561 Sq.ft. )
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )
1 BHK33.5 Sq.mts. ( 361 Sq.ft. )
1 BHK37.39 Sq.mts. ( 402 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Evershine Amavi 303 Phase 1last updated on 13 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
To Be Updated By Promoter
Energy management100% completed
95% Complete
To Be Updated By Promoter
Fire Protection And Fire Safety Requirements100% completed
95% Complete
To Be Updated By Promoter
Landscaping & Tree Planting100% completed
95% Complete
To Be Updated By Promoter
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
To Be Updated By Promoter
Solid Waste Management And Disposal100% completed
95% Complete
To Be Updated By Promoter
Storm Water Drains100% completed
95% Complete
To Be Updated By Promoter
Street Lighting100% completed
95% Complete
To Be Updated By Promoter
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
To Be Updated By Promoter
Water Conservation, Rain water Harvesting100% completed
95% Complete
To Be Updated By Promoter
Water Supply100% completed
95% Complete
To Be Updated By Promoter
Buildings / Wings in Evershine Amavi 303 Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Evershine Amavi 303 Phase 1 by Evershine Developerslast updated on 13 Jan 2025 as per information obtained from MARA RERA.

179350 Sq. ft.

Project Area

31248 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

705 apartments in total
Total
705
Booked
451
Available
254

Saleable Area Statistics (Sq. ft.)

316242 Total
Total
316242
Booked
190694
Available
125548
Total 705 apartments in project. 451 apartments booked. 63% apartments booked.
Total 316242 Sq.ft. saleable area. 190694 saleable area booked.
60% area booked.

Building No 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 14Dec 202315101012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.55 Sq.mts. ( 480 Sq.ft. )27
8 Booked29% Booked
29% Booked
2 BHK46.49 Sq.mts. ( 500 Sq.ft. )26
24 Booked92% Booked
92% Booked
Shop21.6 Sq.mts. ( 233 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop22.19 Sq.mts. ( 239 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop24.08 Sq.mts. ( 259 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop34.93 Sq.mts. ( 376 Sq.ft. )1
1 Booked100% Booked
100% Booked
58 total apartments / 37 apartments booked. 63% apartments booked.
Work Description in Building Building No 14Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 15Dec 202315101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.55 Sq.mts. ( 480 Sq.ft. )27
17 Booked62% Booked
62% Booked
2 BHK46.49 Sq.mts. ( 500 Sq.ft. )26
7 Booked26% Booked
26% Booked
Shop22.19 Sq.mts. ( 239 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop24.08 Sq.mts. ( 259 Sq.ft. )2
2 Booked100% Booked
100% Booked
57 total apartments / 28 apartments booked. 49% apartments booked.
Work Description in Building Building No 15Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 16

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 16Dec 202315101011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.55 Sq.mts. ( 480 Sq.ft. )27
27 Booked100% Booked
100% Booked
2 BHK46.49 Sq.mts. ( 500 Sq.ft. )26
Shop21.6 Sq.mts. ( 233 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.19 Sq.mts. ( 239 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop24.09 Sq.mts. ( 259 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop34.93 Sq.mts. ( 376 Sq.ft. )1
1 Booked100% Booked
100% Booked
58 total apartments / 35 apartments booked. 60% apartments booked.
Work Description in Building Building No 16Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 18

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 18Dec 2023151010161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.21 Sq.mts. ( 573 Sq.ft. )26
Shop13.26 Sq.mts. ( 143 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop18.02 Sq.mts. ( 194 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.6 Sq.mts. ( 200 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop24.65 Sq.mts. ( 265 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop30.4 Sq.mts. ( 327 Sq.ft. )1
1 Booked100% Booked
100% Booked
33 total apartments / 8 apartments booked. 24% apartments booked.
Work Description in Building Building No 18Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 19

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 19Dec 2023151010161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK51.11 Sq.mts. ( 550 Sq.ft. )27
8 Booked29% Booked
29% Booked
2 BHK51.38 Sq.mts. ( 553 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK52.15 Sq.mts. ( 561 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.21 Sq.mts. ( 573 Sq.ft. )26
16 Booked61% Booked
61% Booked
55 total apartments / 26 apartments booked. 47% apartments booked.
Work Description in Building Building No 19Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 20

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 20Dec 2023151010181
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK51.11 Sq.mts. ( 550 Sq.ft. )27
9 Booked33% Booked
33% Booked
2 BHK51.38 Sq.mts. ( 553 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK52.15 Sq.mts. ( 561 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.21 Sq.mts. ( 573 Sq.ft. )26
8 Booked30% Booked
30% Booked
55 total apartments / 19 apartments booked. 34% apartments booked.
Work Description in Building Building No 20Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 21

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 21Dec 2023151010151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK33.5 Sq.mts. ( 361 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK37.39 Sq.mts. ( 402 Sq.ft. )54
36 Booked66% Booked
66% Booked
110 total apartments / 92 apartments booked. 83% apartments booked.
Work Description in Building Building No 21Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 22

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 22Dec 2023151010151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )28
18 Booked64% Booked
64% Booked
1 BHK33.5 Sq.mts. ( 361 Sq.ft. )28
22 Booked78% Booked
78% Booked
1 BHK37.39 Sq.mts. ( 402 Sq.ft. )54
44 Booked81% Booked
81% Booked
110 total apartments / 84 apartments booked. 76% apartments booked.
Work Description in Building Building No 22Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 23

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 23Dec 2023151010151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.35 Sq.mts. ( 359 Sq.ft. )28
15 Booked53% Booked
53% Booked
1 BHK33.5 Sq.mts. ( 361 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK37.39 Sq.mts. ( 402 Sq.ft. )54
54 Booked100% Booked
100% Booked
110 total apartments / 97 apartments booked. 88% apartments booked.
Work Description in Building Building No 23Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No17Dec 2023151010161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK51.11 Sq.mts. ( 550 Sq.ft. )27
8 Booked29% Booked
29% Booked
2 BHK53.21 Sq.mts. ( 573 Sq.ft. )26
13 Booked50% Booked
50% Booked
Shop13.26 Sq.mts. ( 143 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop18.02 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.6 Sq.mts. ( 200 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop30.4 Sq.mts. ( 327 Sq.ft. )1
1 Booked100% Booked
100% Booked
59 total apartments / 25 apartments booked. 42% apartments booked.
Work Description in Building Building No17Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Evershine Developers
for Project
Evershine Amavi 303 Phase 1
last updated on 13 Jan 2025 as per information obtained from MARA RERA.