Project overview
Galaxy Apartments Cdf Wings is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800010758. Galaxy Apartments Cdf Wings is located at Near Bunder Bhavan, Kurla East, Kurla East. This is a On-Going Project being developed by Housing Development And Infrastructure Ltd.
Galaxy Apartments Cdf Wings has RESIDENTIAL, SHOP & SHOPS Apartments with carpet areas ranging from 163 to 89 Sq.ft. Carpet. The Project has total 371 of which 0 are currently available for sale.
Galaxy Apartments Cdf Wings is being developed on a total land area of 32441 Sq.ft. out of which 25188 Sq.ft. i.e 78% is reserved for recreational purposes. Galaxy Apartments Cdf Wings has 3 Wings / Towers Wing - D,Wing - F,Wing C
Project | Developer | Location | Possession |
-
Project:
Galaxy Apartments Cdf Wings
-
Location:
-
Near Bunder Bhavan, Kurla East, Kurla East
-
Const. Stage:
On-Going Project
-
Possession:
30 Nov 2017
-
Developer:
Housing Development And Infrastructure Ltd
-
Phone:
-
Address:
-
9-01, Hdil Towers, Anant Kanekar Marg, Near Small Causes Court, Bandra(East), 400051
MAHA REARA No: |
P51800010758 |
Project Type |
Others |
RERA Project Status |
On-Going Project |
Architect |
Indrajeet S. Deshmukh |
Funding Bank |
BHARAT COOPERATIVE BANK LIMITED |
Proposed Possession |
30 Nov 2017 |
Revised Possession |
31 Jan 2021 |
Extended Possession |
|
Litigations |
No Litigations |
Last Modified |
19 Apr 2019 |
Last Retrived |
15 Jan 2025 |
Galaxy Apartments Cdf Wings QR Code
Galaxy Apartments Cdf Wings
MahaRERA - P51800010758
Type | Area |
RESIDENTIAL | 36.75 Sq.mts. ( 396 Sq.ft. ) |
RESIDENTIAL | 52.19 Sq.mts. ( 562 Sq.ft. ) |
SHOPS | 16.15 Sq.mts. ( 174 Sq.ft. ) |
SHOPS | 17.22 Sq.mts. ( 185 Sq.ft. ) |
SHOPS | 19.98 Sq.mts. ( 215 Sq.ft. ) |
SHOPS | 20.55 Sq.mts. ( 221 Sq.ft. ) |
SHOPS | 21.61 Sq.mts. ( 233 Sq.ft. ) |
SHOPS | 22.18 Sq.mts. ( 239 Sq.ft. ) |
SHOPS | 31.32 Sq.mts. ( 337 Sq.ft. ) |
RESIDENTIAL | 36.42 Sq.mts. ( 392 Sq.ft. ) |
RESIDENTIAL | 55.63 Sq.mts. ( 599 Sq.ft. ) |
RESIDENTIAL | 56.41 Sq.mts. ( 607 Sq.ft. ) |
SHOPS | 11.25 Sq.mts. ( 121 Sq.ft. ) |
SHOPS | 16.14 Sq.mts. ( 174 Sq.ft. ) |
SHOPS | 18.6 Sq.mts. ( 200 Sq.ft. ) |
SHOPS | 19.95 Sq.mts. ( 215 Sq.ft. ) |
SHOPS | 20.53 Sq.mts. ( 221 Sq.ft. ) |
SHOPS | 21.59 Sq.mts. ( 232 Sq.ft. ) |
SHOPS | 31.99 Sq.mts. ( 344 Sq.ft. ) |
RESIDENTIAL | 36.6 Sq.mts. ( 394 Sq.ft. ) |
RESIDENTIAL | 52.25 Sq.mts. ( 562 Sq.ft. ) |
SHOP | 8.27 Sq.mts. ( 89 Sq.ft. ) |
SHOP | 15.16 Sq.mts. ( 163 Sq.ft. ) |
SHOP | 17.18 Sq.mts. ( 185 Sq.ft. ) |
SHOP | 18.12 Sq.mts. ( 195 Sq.ft. ) |
SHOP | 19.87 Sq.mts. ( 214 Sq.ft. ) |
SHOPS | 7.82 Sq.mts. ( 84 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Galaxy Apartments Cdf Wingslast updated on 15 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
To Commence |
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station50% completed
|
|
Work In Progress |
|
|
To Commence |
Fire Protection And Fire Safety
Requirements
|
|
To Commence |
Landscaping & Tree Planting
|
|
Na |
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
|
|
Work In Progress |
Solid Waste Management And Disposal
|
|
To Commence |
|
|
To Commence |
|
|
To Commence |
Treatment And Disposal Of Sewage And Sullage Water
|
|
To Commence |
Water Conservation, Rain water Harvesting
|
|
To Commence |
|
|
To Commence |
Buildings / Wings in Galaxy Apartments Cdf Wings
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Galaxy Apartments Cdf Wings by Housing Development And Infrastructure Ltdlast updated on 15 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
371
apartments in total
Saleable Area Statistics (Sq. ft.)
176683
Total
Total 371 apartments in project. 371 apartments booked. 100% apartments booked.
Total 176683 Sq.ft. saleable area. 176683 saleable area booked.
100% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Wing - D | Jan 1900 | 18 | 1 | 2 | 1 | 0 | 0 | 39 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
RESIDENTIAL | 36.75 Sq.mts. ( 396 Sq.ft. ) | 32 | |
RESIDENTIAL | 52.19 Sq.mts. ( 562 Sq.ft. ) | 101 | |
SHOPS | 16.15 Sq.mts. ( 174 Sq.ft. ) | 2 | |
SHOPS | 17.22 Sq.mts. ( 185 Sq.ft. ) | 2 | |
SHOPS | 19.98 Sq.mts. ( 215 Sq.ft. ) | 1 | |
SHOPS | 20.55 Sq.mts. ( 221 Sq.ft. ) | 3 | |
SHOPS | 21.61 Sq.mts. ( 233 Sq.ft. ) | 4 | |
SHOPS | 22.18 Sq.mts. ( 239 Sq.ft. ) | 1 | |
SHOPS | 31.32 Sq.mts. ( 337 Sq.ft. ) | 1 | |
147 total apartments / 147 apartments booked. 100% apartments booked. |
Work Description in Building Wing - D | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Wing - F | Jan 1900 | 18 | 1 | 2 | 1 | 0 | 0 | 31 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
RESIDENTIAL | 36.42 Sq.mts. ( 392 Sq.ft. ) | 50 | |
RESIDENTIAL | 55.63 Sq.mts. ( 599 Sq.ft. ) | 34 | |
RESIDENTIAL | 56.41 Sq.mts. ( 607 Sq.ft. ) | 15 | |
SHOPS | 11.25 Sq.mts. ( 121 Sq.ft. ) | 4 | |
SHOPS | 16.14 Sq.mts. ( 174 Sq.ft. ) | 1 | |
SHOPS | 18.6 Sq.mts. ( 200 Sq.ft. ) | 2 | |
SHOPS | 19.95 Sq.mts. ( 215 Sq.ft. ) | 1 | |
SHOPS | 20.53 Sq.mts. ( 221 Sq.ft. ) | 1 | |
SHOPS | 21.59 Sq.mts. ( 232 Sq.ft. ) | 1 | |
SHOPS | 31.99 Sq.mts. ( 344 Sq.ft. ) | 1 | |
110 total apartments / 110 apartments booked. 100% apartments booked. |
Work Description in Building Wing - F | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Wing C | Jan 1900 | 18 | 1 | 2 | 1 | 0 | 0 | 23 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
RESIDENTIAL | 36.6 Sq.mts. ( 394 Sq.ft. ) | 32 | |
RESIDENTIAL | 52.25 Sq.mts. ( 562 Sq.ft. ) | 67 | |
SHOP | 8.27 Sq.mts. ( 89 Sq.ft. ) | 1 | |
SHOP | 15.16 Sq.mts. ( 163 Sq.ft. ) | 2 | |
SHOP | 16.14 Sq.mts. ( 174 Sq.ft. ) | 2 | |
SHOP | 17.18 Sq.mts. ( 185 Sq.ft. ) | 2 | |
SHOP | 18.12 Sq.mts. ( 195 Sq.ft. ) | 1 | |
SHOP | 19.87 Sq.mts. ( 214 Sq.ft. ) | 1 | |
SHOP | 20.53 Sq.mts. ( 221 Sq.ft. ) | 3 | |
SHOP | 21.59 Sq.mts. ( 232 Sq.ft. ) | 2 | |
SHOPS | 7.82 Sq.mts. ( 84 Sq.ft. ) | 1 | |
114 total apartments / 114 apartments booked. 100% apartments booked. |
Work Description in Building Wing C | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Housing Development And Infrastructure Ltd
for Project
Galaxy Apartments Cdf Wings
last updated on
15 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |