Project overview

Gem Paradise is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800014003. Gem Paradise is located at 2Jkfwwtb5v0ig6whlw3jfq==. This is a New being developed by Vayuputtra Builders & Infrastructures Pvt. Ltd..

Gem Paradise has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 1151 to 946 Sq.ft. Carpet. The Project has total 41 of which 1 are currently available for sale.

Gem Paradise is being developed on a total land area of 10027 Sq.ft. Gem Paradise has 1 Wings / Towers Gem Paradise

ProjectDeveloperLocationPossession
Ramrajya - Neptune Ekansh DNeptune Developers LimitedQekaat8jdxie5+3Sq0v8lsa0c8s/63I70cztszqzd7nnym5ff2jfqew3pep4wnrn3fju8af1a9oyf6vwkdwkoa==30-12-2023 00:00:00
Ramrajya - Neptune Ekansh CNeptune Developers LimitedHofvqp+Jiyr3bsw0sm1dfjlrz+Z9w6sruuhyhsnj7vn1fqim6i1awaq+2Qusvdbs30-09-2023 00:00:00
Ramrajya - Neptune Ekansh FNeptune Developers LimitedQekaat8jdxie5+3Sq0v8lsa0c8s/63I70cztszqzd7nnym5ff2jfqew3pep4wnrn3fju8af1a9oyf6vwkdwkoa==30-12-2023 00:00:00
Ramrajya - Neptune Ekansh BNeptune Developers LimitedQekaat8jdxie5+3Sq0v8lsa0c8s/63I70cztszqzd7nnym5ff2jfqew3pep4wnrn3fju8af1a9oyf6vwkdwkoa==30-09-2023 00:00:00
Yura Business ParkYura Business Park Private LimitedB68b2ydaektamijl0mjyjw==30-12-2021 00:00:00
Rosalia ApartmentsKusum AssociatesMetfccrmkhkgrdbaigygqa==30-07-2020 00:00:00
Gurnani Palms Wing AInterintel ConstructionsXccoptn2xb8i6z710fptcmczipk1hfxnxflvbbjkys0=31-12-2018 00:00:00
Ramrajya - Neptune Udaan ENeptune Developers LimitedVxdgi4hvn2zibefacczutljdhdom08gnyjv04gw87ssutgsp4scc3cjtg1iazhsp30-12-2023 00:00:00
Ramrajya - Neptune Jal Tarang ENeptune Developers Limited40Kbfcf2t/Zzxmdey13upwlrgi8n6zitfoxkzllmcib9dao7+I8n2dvn/4Pxmt+Ssw/4Kml9rlgkr+Yxki4udq==30-12-2023 00:00:00
Ramrajya - Neptune Udaan BNeptune Developers LimitedVxdgi4hvn2zibefacczutgh8iov730pszx495izdqn9exhq3rsugj/Grkrjfhqvf30-12-2023 00:00:00
Ramrajya - Neptune Udaan DNeptune Developers LimitedVxdgi4hvn2zibefacczutcserw3ckpf6o14v8l0cxuschbebeogsw69kuptkmc5zsbpzluziad2bzzjlohv1dq==30-12-2023 00:00:00
Andheri Sahkar Co-Operative Housing Society Ltd.Sai Siddhant Developers40005330-06-2017 00:00:00
Solaris Titanium TowersSolaris Developers Private LimitedShl6btn0kkacdjpukawhla==31-12-2019 00:00:00
Azad Nagar Kedar Darshan ChslPrathamesh Krupa Buildcon Private LimitedKlwbm1sidmnpgtsd0tyghg==19-08-2018 00:00:00
Neev AmberwoodNeev Infrastructure Pvt LtdVi/Gveqvy0qqjxh9zlfipnatw4rbkzmq0dqxdd0ys4cu/Bsnh1hixtqq/Vhdoqei31-03-2019 00:00:00
Saffron HeightsPratham Varadvinayak Developers LlpZokkxzpd/Yqtx+Bq5jzurg==30-09-2021 00:00:00
Vengurlekars ChaitraVengurlekars Shreesai Builders And Developers Private Limited2Iutcixn+Hqsa5acofkekw==31-12-2019 00:00:00
Vardhman GrandeurVardhman Developers LtdBnpkbbm68vabpvmbu/Tola==30-12-2019 00:00:00
Rishabh TowerVipul Pravinchandra Shah4Gxfrjplcopotjpj5z71eg==30-06-2018 00:00:00
Moongipa LandmarkMoongipa Realty Private LimitedMumbai Suburban31-10-2018 00:00:00
D N Nagar Dwarka Chs Ltd.Sssc Escatics Pvt. Ltd.40005330-06-2018 00:00:00
Rajveer ApartmentsHersh Construction03Tpkzqxo2tjnll8cq5w0w==30-12-2031 00:00:00
Nest Wing ASssc Escatics Pvt. Ltd.Iiftfxcc36ptlq1pm9ne2zkuvfrg0h7+E4fvyb/Fd3xyl9kwctwahjodbuf63qqixvbyi1wwx452nlz2qlw+Za==31-03-2020 00:00:00
Pearl Residency - Wing-A, Residential Phase - IGiriraj EnterprisesJcvbdpewg9niwzruxnb3jslhbwpio2adshlxg+U4log=25-07-2019 00:00:00
La AltezaEmerald DevelopersOwsefrvipky+C9yhjwr4junkbpfawgk91azw8xeeqvw=30-12-2021 00:00:00
Kamal Dutt ChslChintan Zaveri400058, Mumbai Suburban20-01-2018 00:00:00
Dlh Dream TowerDev Land & Housing Pvt Ltd87Ubgwenbz3p7klkzls2aa==30-09-2019 00:00:00
Naman HabitatShree Naman Developers Pvt LtdFsjtyf4fbhy5mui2oevgvq0pstqxzwwr6ipqt/Bnzwa8o7otx15u+B0jxdfsymtnmjhnof3j7w1tswvz6tcz3peaej1wph0m/Qc6pdlux4n56hdsqsg2fhbfnvq7tgzsdknplykjbct8guzm8wzzpq==30-08-2020 00:00:00
D N Nagar Shivneri Chs LtdSai Siddhant DevelopersGanesh Chawk31-07-2017 00:00:00
Matruchaya Chs LtdSwastik Realty Pvt Ltd3Vcon6fwkomiisu+T06gaw==30-06-2021 00:00:00
D N Nagar Krishna Chs LtdSai Siddhant Developers40005330-06-2017 00:00:00
D N Nagar Niwara Chs LtdWestin Spaces Private LimitedTdj8uitoy03a2pgfdgevolmv/O91eazqr2p6apjietqnoqhjv6sg0+Jwywnlxdcw31-03-2019 00:00:00
The Residency Lak & Hanware Realty Llp/Ivw4f7yehaqxonyzxeix1nrpqrxe7lp749ennk4tou=30-06-2021 00:00:00
Uk SangfroidKeemaya Build Private LimitedFkwenrwutdz/Pjuihuo+/Tfh+L+Qpkq+Hqisa89qj2/Kvth8mh1an3vrtfpvxnuz31-12-2019 00:00:00
Kush SapphireKush Buildcon LlpDf4rh6f3cid7aaczxkooaq==31-12-2018 00:00:00
Moongipa ArcadeMoongipa Realty Private LimitedAfh28bhw6s9foa8o/Ovozkhkc3cjqyoprray3vt4xme=30-12-2023 00:00:00
Gem ParadiseVayuputtra Builders & Infrastructures Pvt. Ltd.2Jkfwwtb5v0ig6whlw3jfq==30-07-2021 00:00:00
Redevelopment Of Mcgb Staff Gilbird Chsl, Gilbird Hill Road, Andheri WestSunteck Realty LimitedXa39/W4ap6mauqytrjiuhq==30-04-2023 00:00:00
Parmar HeritageKonark & AssociatesJk9/Zmkka0rt5ntndzzukq==17-06-2022 00:00:00
Platinum Tower - 7Tirupati Gruhpravesh Llp+Subuen3uwxxzfk742s0al5agucvcm2bxgserrqnv1i=30-06-2019 00:00:00
Kabra ParadiseKabra Estate And Investment ConsultantsSscawphvq+Kocbd80wdnrq==31-12-2018 00:00:00
SafalyaVijay Mallya400058, Mumbai Suburban16-06-2018 00:00:00
SilvereneShreeji CombineGyrwa+Yracpaktkozeooxg==31-12-2018 00:00:00
Lotus Link SquareLotus Grih Nirman Private LimitedQe/U4kioycbt9de78k4uhcmb9ro37c7wcczfkuugl5fzkphsi+1Dhwfgseso3bai31-12-2019 00:00:00
Aryaman CrestAryaman Infratech India Pvt LtdOff Link Road31-12-2019 00:00:00
FOREFRONT NORTHEAST-100Forefront Realty Private LimitedRambaug Daud Baug Lane31-12-2022 00:00:00
Pearl HeritageHari Om Construction1Ygzxs6tznkr5lfr6lwkua==30-12-2022 00:00:00
MamtaShivam Dev Infracon Pvt LtdS5bytzaunhwkfe4cuxfhjpkikeprypvntqmw+Nwvbb0=30-03-2023 00:00:00
Devine Mercy Sra Chs Prop.Mahesh MestryKevanipada, 26-10-2021 00:00:00
Agarwal PalazzoBalaji DevelopersTua8yazy3yjzzyd9m+Qphg==30-12-2023 00:00:00
Grace PinnacleGrace Estate BuildersGowe6ddp5dgwv1ur53ol4z9yaxex2l4dliljjomuaqk=30-06-2019 00:00:00
Divyam HeightsHersh ConstructionRelpj6lpx0/+Xxhgj51i0a==30-12-2031 00:00:00
D N Nagar Suryakiran Chs LimitedSai Siddhant DevelopersD. N. Nagar31-03-2018 00:00:00
Azad Nagar Ashta Vinayak Chs LtdRajvi Builders And DevelopersPubq21acw84q8oenprqwtq==31-07-2022 00:00:00
Doctor HouseJakk Projects & Developer LlpVnpidc0zoryt5gceopx7jjzchgfoxt5hlwfrrez4r8onv94vpu4mrd48wj8xckbi31-03-2028 00:00:00
Park WestMajestic Royale DevelopersVh84mqness8rfvb5ihq+Amce+717Sn51drvwsujqc4w=30-06-2028 00:00:00
Ramrajya - Neptune Jal Tarang DNeptune Developers Limited40Kbfcf2t/Zzxmdey13upwlrgi8n6zitfoxkzllmcib9dao7+I8n2dvn/4Pxmt+Ssw/4Kml9rlgkr+Yxki4udq==30-12-2023 00:00:00
MiraiGraceunited DevelopersNqyesupsf5x6lasndpti6adxf4by0byfzmps4tilfckqyq9o+Tduchbb2whxbo4131-03-2027 00:00:00
Rite PrimeRite Developers Pvt. Ltd.Dlopitjoaafcogwkj+P7oc0nvtygbcqu7aqqtk+1Rz4=31-12-2017 00:00:00
Winspace AmelioBini Builders Private LimitedYizgeaxiq7nhhcu+Nghofynaeom1cn4snsxw9ny7apo11jlgugpnjj1tl+Ephzlu30-06-2021 00:00:00
Nest Wing BSssc Escatics Pvt. Ltd.Iiftfxcc36ptlq1pm9ne2zkuvfrg0h7+E4fvyb/Fd3xyl9kwctwahjodbuf63qqixvbyi1wwx452nlz2qlw+Za==31-03-2020 00:00:00
D N Nagar Jai Bhavani Chs LtdSai Siddhant Developers40005331-07-2017 00:00:00
Suvidha SquareSuvidha Milind Business Ventures+2Cchiwcrchuhd+Nna89va==31-12-2019 00:00:00
Mittal CoveVgm Projects LlpRihnbvwxewmj1bkthyrzxa==30-06-2023 00:00:00
AnutamTruly Highdreams Realtors Llp/5Adp94jkydly9q08fiyd+Aiznlynzgr3kyhr4vejk8=30-09-2023 00:00:00
Jp EminenceJ. P. Infra (Mumbai) Private LimitedNv4etxbtwskeigoavts1+Jo8dvu0g7wuil/1+Mlt2ujhbm/B2iswrrhayrgo7xmq30-06-2026 00:00:00
Stadium ViewAcme Avenue Infrastructure Pvt. Ltd.76Zsfgsvwskym9k4q7ecka==31-12-2019 00:00:00
Antariksh AlbaAntariksh Infraprojects LlpI0css1debp0vuuxo6f2xkq==31-12-2018 00:00:00
Parinee IParinee Realty Private LimitedKkb39qfl7gzhse6k/B9gofojay9ckq2txalgympkot8=30-06-2021 00:00:00
Dilkap VictorGorkap Properties & Investments Pvt. LtdBr97lnzmh7ac7hxwmewdzg==31-12-2019 00:00:00
Ravikiran Co-Operative Hsg Soc Ltd.Westin Developers Pvt. Ltd400053, Mumbai City01-06-2018 00:00:00
Makskap CentreDilip Estate & Town Planners Pvt LtdXolywd526vbukd0wz8k6vqgwwcoxsn9odpsiymcngok=31-12-2019 00:00:00
MASS IONICSMASS BUILDSQUARE STRUCTURE PRIVATE LIMITEDDhobi Galli (S. N. Patil Marg)30-06-2026 00:00:00
TathastuH&D ProjectsX9tgui8rmyb/6Av4m54+Dq==10-07-2026 00:00:00
Mayfair BreezeMayfair Housing Private Limited64S2p+Yecgqx1a5qq1i8fa==30-11-2027 00:00:00
Pranami BlissPranami Neev Realty LimitedQaflq4bqalb7udyq/Dztmg==15-04-2027 00:00:00
Sun Sumit YashodhanSun Sumit VentureF3uhonjlavdknrm7stedi4yr9rajfxsa3ybrgmgtfem=31-12-2027 00:00:00
Shubh LaabhV4 Estate LlpYbxzv9tsjwpvpr6mjirz9a==14-11-2027 00:00:00
Bhavesha Co-Operative Housing Society LtdBeautiful Properties Private Limited6Kpvo4wk236s2a4k//Ospg==30-11-2023 00:00:00
Saujanya RachanaaTerraferma Developers Llp8+Tzj6beq0gveuwji+Ogrq==31-12-2025 00:00:00
Chandra LogassaAmaan Gold Leaf Developers31-08-2028 00:00:00
Divyam HeightsHersh ConstructionRelpj6lpx0/+Xxhgj51i0a==30-12-2031 00:00:00
Linkbay Residences Phase IPortsmouth Buildcon Private LimitedVce+Sbnp4x4aouoevnxxzkgvwuss6at40xy34gugnbg=31-10-2028 00:00:00
5Th ElementPratham Varadvinayak Builders And Developers Private LimitedZ/Dsy4ci1olhb3lctsyfja==30-06-2026 00:00:00
Chaitanya Anand - Lunkhod ChslChaitanya DevelopersCiu7plit0mkrvnqzosqwbisam1kfk86ytdsmns4lnk8=31-05-2024 00:00:00
Bella CasaKonark Bella Casa LlpM+2Urul8c1rmn20onjj2mmjlevdhcatgbtwvxgtrfdq=31-12-2023 00:00:00
Shantiniketan 2 Chs LtdS D Bhalerao Constructions Pvt Ltd40005830-09-2015 00:00:00
Vraj Meridian-Nikunj ChslVraj Bvg Infrasheltors Llp15-12-2030 00:00:00
Platinum ClassicPlatinumcorp Urban Developers Llp30-06-2029 00:00:00
Linkbay Residences Phase Ii Wing BPortsmouth Buildcon Private Limited And Shiv Infra Vision Private Limited30-06-2030 00:00:00
Project Details
  • Project:
    Gem Paradise
  • Location:
  • 2Jkfwwtb5v0ig6whlw3jfq==
  • Const. Stage:
    New
  • Possession:
    30 Jul 2021
Developer Details

  • Developer:
    Vayuputtra Builders & Infrastructures Pvt. Ltd.
  • Phone:
  • Address:
  • Dynasty Business Park
Project RERA Details
MAHA REARA No: P51800014003
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Jul 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 13 Feb 2026
Gem Paradise QR Code
Gem Paradise
MahaRERA - P51800014003
Apartment Details & Configuration
TypeArea
1 BHK55.28 Sq.mts. ( 595 Sq.ft. )
1 BHK59.27 Sq.mts. ( 638 Sq.ft. )
2 BHK70.14 Sq.mts. ( 755 Sq.ft. )
2 BHK71.44 Sq.mts. ( 769 Sq.ft. )
3 BHK87.89 Sq.mts. ( 946 Sq.ft. )
3 BHK106.93 Sq.mts. ( 1151 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Gem Paradiselast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Gem Paradise
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gem Paradise by Vayuputtra Builders & Infrastructures Pvt. Ltd.last updated on 13 Feb 2026 as per information obtained from MARA RERA.

10027 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

41 apartments in total
Total
41
Booked
40
Available
1

Saleable Area Statistics (Sq. ft.)

32747 Total
Total
32747
Booked
32152
Available
595
Total 41 apartments in project. 40 apartments booked. 97% apartments booked.
Total 32747 Sq.ft. saleable area. 32152 saleable area booked.
98% area booked.

Gem Paradise

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gem ParadiseJul 2021191000065
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK55.28 Sq.mts. ( 595 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK59.27 Sq.mts. ( 638 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK70.14 Sq.mts. ( 755 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK71.44 Sq.mts. ( 769 Sq.ft. )24
24 Booked100% Booked
100% Booked
3 BHK87.89 Sq.mts. ( 946 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK106.93 Sq.mts. ( 1151 Sq.ft. )1
1 Booked100% Booked
100% Booked
41 total apartments / 40 apartments booked. 97% apartments booked.
Work Description in Building Gem ParadiseCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vayuputtra Builders & Infrastructures Pvt. Ltd.
for Project
Gem Paradise
last updated on 13 Feb 2026 as per information obtained from MARA RERA.