Project overview

Godrej Central is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001107. Godrej Central is located at Mumbai Suburban, 400071. This is a On-Going Project being developed by Godrej Landmark Redevelopers Private Limited.

Godrej Central has 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 887 to 989 Sq.ft. Carpet. The Project has total 928 of which 3 are currently available for sale.

Godrej Central is being developed on a total land area of 188822 Sq.ft. Godrej Central has 20 Wings / Towers A,B,Building No 14 Tower I,C,D,E,F,G,H,L,M,Mhada Building No 2,Mhada Building No 23,Mhada Building No 37,N,O,P,Prive Tower J Building No 39,Q,R

ProjectDeveloperLocationPossession
Shree Samarth Galaxy Sra Chs LtdShree S S Developers Private LimitedMumbai Suburban, 40007831-12-2017 00:00:00
Tulsi ElanzaMetro CapitalMumbai Suburban, 40007131-12-2019 00:00:00
Venus TowersVenus Enterprises18.30 Mt Dp Road, Neharu Nagar, Neharu Nagar31-12-2020 00:00:00
Kalpana SangamSrushti Sangam Builders Pvt LtdMumbai Suburban, 40008901-09-2022 00:00:00
Gurbani BHeena Construction CoMumbai Suburban, 40008931-07-2018 00:00:00
Tirupati HeightTirupati DeveloperMumbai Suburban, 40007831-05-2018 00:00:00
Veena SerenityVeena Realcon Private LimitedSahakar Nagar Road No.3, Chambur, Chambur01-12-2020 00:00:00
Godrej CentralGodrej Landmark Redevelopers Private LimitedMumbai Suburban, 40007130-03-2019 00:00:00
Tridhaatu Bhaveshwar VilasTridhaatu Bhaveshwar Developers Llp17Th Road, Chembur, Chembur31-10-2018 00:00:00
Chembur Jeevan Deep Coop Hsg Soc LtdOm Sai EnterprisesMumbai Suburban, 40008930-09-2018 00:00:00
Vishnubhuvan Chs LtdShree S S Developers Private LimitedKokan Nagar, Bhandup West, Bhandup West31-12-2020 00:00:00
Chembur Lokprabha Coop Hsg Soc LtdOm Sai EnterprisesMumbai Suburban, 40008930-04-2019 00:00:00
GulmohurSanjay JumaniChembur, Sindhi Society, Sindhi Society31-07-2019 00:00:00
Shivdarshan Sra Chs LtdShree Swami Samarth BuildersMumbai Suburban, 40007831-12-2017 00:00:00
Raghav OneRaghav Raj Builders &Amp; Developers LlpAshtvinayak Marg, Nehru Nagar, Nehru Nagar30-06-2021 00:00:00
Prabhav ArishaBalaji AssociatesMumbai City, 40008930-10-2020 00:00:00
Intelligentia Infinity By Haware PropertiesHaware HousingRoad No 12, Chembur West, Tilak Nagar, Mumbai, Behind Shoppers Stop Near Chembur Ghatkopar, Behind Shoppers Stop Near Chembur Ghatkopar, Road No 12, Chembur West, Tilak Nagar30-12-2025 00:00:00
Rajshree CloverRajshree CreationsTilak Nagar, Chembur, Chembur31-07-2018 00:00:00
Swastik Plaza C Chs Ltd-AvanaPratibha Veekay Real Estate LlpPt Cr Vyas Marg, Chembur, Chembur31-12-2018 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedLbs Marg, Bhandup (W), Bhandup (W)29-02-2020 00:00:00
Sonal HeightsSonal Dev-Con Pvt LtdB.B Magre Marg, Nehru Nagar, Nehru Nagar30-04-2020 00:00:00
Shweta ChsAtharva DevelopersSahakar Nagar Road No 1, Chembur, Chembur31-12-2018 00:00:00
Dhoot Adi Residency-Shree Adi House ChslDhoot Developers Pvt. Ltd.15Th Road, Chembur East, Chembur East31-12-2017 00:00:00
Hubtown Seasons - I WingJoynest Premises Private LimitedRc Chemburkar Marg, Chembur, Chembur31-12-2023 00:00:00
Sai Ashish IiKukreja Construction CoVillage Road, Bhandup, Bhandup30-09-2018 00:00:00
Arya HeightsRishabh EnterprisesMaharashtra, Bhandup, Bhandup31-12-2019 00:00:00
Gadkari ParadiseGadkari Builders &Amp; AssociatesMumbai City, 40007131-12-2019 00:00:00
Swiss BoulevardChaurang AssociatesPostal Colony, Chembur, Chembur31-12-2020 00:00:00
Redevelopment Of Chembur Sandhya ChslHeritage Lifestyles &Amp; Developers Pvt. Ltd.Mumbai Suburban, 40008931-12-2018 00:00:00
Neptune FlorenciaSachin M Deshmukh And Nayan A Bheda (Aop)Pk Road, Mulund West, Mulund West31-12-2018 00:00:00
Srushti Raj SiddhiChinnaiah GowdaRoad No. 13, Tilak Nagar, Tilak Nagar25-12-2021 00:00:00
SovenirSuncity CorporationMumbai Suburban, 40007831-08-2016 00:00:00
Saffron Residency Phase -1Ayodhya Construction CoS G Barve Marg, Kurla, Kurla31-10-2018 00:00:00
49 ElinaHuges Real Estates Developers LlpM. G. Road, Ghatkopar West, Ghatkopar West30-11-2017 00:00:00
Redevelopment Of Tilak Nagar Nisarg Co. Op. Hsg. Soc. Ltd.M/S. Reliance Realtors &Amp; Estate DevelopersPipeline Road, Opposite Hanuman Mandir, Opposite Hanuman Mandir30-06-2020 00:00:00
Srushti ParivarChinnaiah GowdaMumbai Suburban, 40008901-09-2022 00:00:00
Kalpana SrushtiChinnaiah GowdaMumbai Suburban, 40008901-09-2022 00:00:00
Srushti GardenChinnaiah GowdaMumbai Suburban, 40008901-09-2022 00:00:00
Srishti SolitaireSiddhivinayak EnterpriseMumbai Suburban, 40007831-12-2017 00:00:00
Lakshmi VaniTridhaatu Realty &Amp; Infra Pvt LimitedRoad No. 17, Chembur, Chembur31-12-2014 00:00:00
Stella Sapphire B WingVaibhavlaxmi Builders And DevelopersMumbai Suburban, 40007131-12-2017 00:00:00
Shree Shivsamarth ResidencyShree Shiv Samarth DevelopersMumbai Suburban, 40007831-12-2017 00:00:00
M M SpectraM. M. Developers - ShramjiviMumbai Suburban, 40007131-12-2014 00:00:00
Nehru Nagar Shiv Vaibhav Chs Ltd Bldg No 38Parsn Foundation &Amp; Engg CorporationNehru Nagar, Nehru Nagar31-12-2025 00:00:00
Tridhaatu Shobha AayuTridhaatu Maruti Developers LlpPestom Sagar, Road No. 1, Chembur, Chembur, Pestom Sagar31-12-2017 00:00:00
Gaodevi Krupa Darshan Sra Chs LtdShivshankar Singh &Amp; OthersSanman Singh Marg, Bhandup (West), Bhandup (West)31-12-2022 00:00:00
Shree DeeplaxamiPuro ConstructionsBhattipada Cross Road, Bhandup, Bhandup31-12-2018 00:00:00
Midas-Bhakti MeadowsIrene DmelloChembur, Chembur31-12-2018 00:00:00
Redevelopment Of Building No 96Aditya EnterprisesMumbai Suburban, 40008931-12-2008 00:00:00
Stella Sapphire A WingVaibhavlaxmi Builders And DevelopersKannamwar Nagar 1, Vikhroli East, Vikhroli East31-12-2017 00:00:00
Redevelopment Of Gkw Sankey Employees ChslHeritage Lifestyles &Amp; Developers Pvt. Ltd.EMumbai Suburban, 40007831-05-2019 00:00:00
Tridhaatu Atharva Venkatesh SadanTridhaatu Venkatesh Sadan Developers LlpV N Purav Marg, Chembur, Chembur31-01-2019 00:00:00
Srushti KiranChinnaiah GowdaMumbai Suburban, 40008901-09-2022 00:00:00
Bhandup Citizen Chs LtdCastle Floors Pms Pvt LtdVillage Road, Khandelwal Marg, Bhandup W, Bhandup W, Village Road30-06-2021 00:00:00
Shreenath DarshanShreenath Buildgrand Private LimitedMumbai Suburban, 40007831-12-2016 00:00:00
SaivishwaSnehalkumar NadkarniJn Patil Road, Chembur, Chembur31-12-2017 00:00:00
39 AntheaShreenathji Developers Pvt. Ltd,Internal Road, Chembur, Chembur30-11-2017 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private LimitedR. Chemburkar Marg, Chembur East, Chembur East31-12-2021 00:00:00
Ruparel OrionK D Lite Developers Pvt LtdWestern Express, Chembur, Chembur31-12-2017 00:00:00
Silicon EnclaveShilpriya Builders And DevelopersBldg. No. 58, Tilaknagar,, Chembur, Chembur, Bldg. No. 58, Tilaknagar31-12-2019 00:00:00
Amesh Chs LtdRight Channel Construction Pvt LtdMumbai Suburban, 40007130-06-2018 00:00:00
Nehru Nagar Amrapali Chs LtdSamruddhi DevelopersMumbai Suburban, 40002430-06-2018 00:00:00
Hubtown Seasons - B WingJoynest Premises PrivatelimitedRc Chemburkar Marg, Chembur, Chembur31-12-2023 00:00:00
Srinivas BuildingArjun Development &Amp; Construction ( India ) Private LimitedMumbai Suburban, 40007131-12-2019 00:00:00
Prem BelaireM/S Aryan InfraMumbai Suburban, 40008931-03-2018 00:00:00
Swastik EleganceSwastik RealtorsCr Vyas Marg, Swastik Park Chembur, Swastik Park Chembur31-12-2023 00:00:00
Gagan 138Gagangiri ConstructionBuilding No 138 Sarita Vidya Mahal Chsl Nehru Nagar, Kurla East, Kurla East31-12-2025 00:00:00
Anand TowerArihant AssociatesMumbai Suburban, 40008931-12-2017 00:00:00
Aaradhya OneAm DevelopersMumbai Suburban, 40008931-03-2018 00:00:00
Tilak Indrayani Chs LtdReliance CorporationMumbai Suburban, 40008931-03-2019 00:00:00
VastukalpNhk Developers LlpBhandup Village Road, Bhandup West, Bhandup West31-12-2023 00:00:00
Shree Parshwanath Sra Chs LtdChintamani RealtorsBhattipada Road, Bhandup West, Bhandup West30-12-2021 00:00:00
Marvel Gold - Phase ISwaroop Constructions Private LimitedTank Road, Harijan Colony, Valmiki Nagar, Harijan Colony, Valmiki Nagar31-12-2020 00:00:00
Khaliliya ComplexDani Builders And DevelopersMumbai Suburban, 40007005-10-2017 00:00:00
Ekta ResidencyAshok TharwaniMumbai Suburban, 40008931-12-2015 00:00:00
Triveni Chs LtdReliance Estate DevelopersSclr, Tilak Nagar, Tilak Nagar31-12-2018 00:00:00
CelestialSu Sharda Edifice LlpKurla, Kurla31-12-2017 00:00:00
Happy Home C WingEntee DevelopersMumbai Suburban, 40007831-12-2019 00:00:00
ManasSstc India ConstructionsMumbai Suburban, 40008931-12-2020 00:00:00
Om Shri ShantikunjAditya EnterprisesMumbai Suburban, 40008930-12-2017 00:00:00
Vaibhav Chowk Sra Chs LtdSunil JoshiTembipada Road, Bhandup West, Bhandup West30-12-2022 00:00:00
Gulraj HeightsM/S Neeta DeveloperMumbai Suburban, 40002431-07-2017 00:00:00
Tilak Nagar Shree Sainath Chs LtdSankalp DevelopersMumbai Suburban, 40008931-07-2018 00:00:00
Business PointPoint Developers Pvt. LtdD.K. Sandu Marg, Chembur, Chembur31-12-2016 00:00:00
Puneet KalpavrikshaPuneet Prateeksha SpacesNehru Nagar, Nehru Nagar30-06-2025 00:00:00
Hubtown Seasons - DaintreeJoynest Premises Private LimitedR. Chemburkar Marg, Chembur East, Chembur East31-12-2020 00:00:00
Srushti GaganChinnaiah GowdaMumbai Suburban, 40008901-09-2022 00:00:00
Hubtown Seasons CzarnowoJoynest Premises Private LimitedRc Chemburkar Marg, Chembur, Chembur30-06-2017 00:00:00
Skyline Sparkle Wing C Skyline GreathillsMumbai Suburban, 40007831-12-2018 00:00:00
Jay KrishnaPremji Naran Patel HufJangal Mangal Road, Jangal Mangal Road31-12-2022 00:00:00
Tilak Nagar Union Co-Operative Housing Society LtdOm Sai EnterprisesOpp Lokamanya Tilak Ground, Tilak Nagar Chembur, Tilak Nagar Chembur31-12-2021 00:00:00
Srushti ViharChinnaiah GowdaMumbai Suburban, 40008901-11-2022 00:00:00
HorizonAjanta Airavat Infrastructure Limited Liability PartnershipOff Datta Mandir Road, Bhandup, Bhandup30-06-2020 00:00:00
Raghav One45Raghav Raj Builders &Amp; Developers LlpAshthvinayak Marg, Nehru Nagar, Nehru Nagar28-02-2023 00:00:00
Dev DarshanCity Estate Developers LimitedMumbai Suburban, 40007831-03-2012 00:00:00
Premiere By PanachePanache Developers Pvt Ltd.Eastern Express Highway, Chembur, Chembur30-12-2023 00:00:00
Shivsharda Chs LtdShivshankar Singh &Amp; OthersMumbai Suburban, 40007831-10-2017 00:00:00
ShubhamAditya AssociatesMumbai Suburban, 40008930-06-2008 00:00:00
Shraddha InfinityShraddha Landmark Private LimitedMumbai Suburban, 40007831-12-2017 00:00:00
Sai PradnyaDrushti RealtorsMumbai Suburban, 40008931-12-2017 00:00:00
Project Details
  • Project:
    Godrej Central
  • Location:
  • Mumbai Suburban, 400071
  • Const. Stage:
    On-Going Project
  • Possession:
    30 Mar 2019
Developer Details

  • Developer:
    Godrej Landmark Redevelopers Private Limited
  • Phone:
  • Address:
  • 5Th Floor, Godrej One, Pirojshanagar, Off Eastern Express Highway, Vikhroli East, 400079
Project RERA Details
MAHA REARA No: P51800001107
Project Type Residential
RERA Project Status On-Going Project
Architect Aakar Architects &Amp; Consultants
Funding Bank Axis Bank Limited
Proposed Possession 30 Mar 2019
Revised Possession 30 Mar 2021
Extended Possession
Litigations Yes
Last Modified 21 Feb 2024
Last Retrived 10 Mar 2024
Godrej Central QR Code
Godrej Central
MahaRERA - P51800001107
Apartment Details & Configuration
TypeArea
1 BHK55.17 Sq.mts. ( 594 Sq.ft. )
2 BHK70.06 Sq.mts. ( 754 Sq.ft. )
2 BHK72.18 Sq.mts. ( 777 Sq.ft. )
2 BHK72.25 Sq.mts. ( 778 Sq.ft. )
2.5 BHK83 Sq.mts. ( 893 Sq.ft. )
2.5 BHK83.77 Sq.mts. ( 902 Sq.ft. )
3 BHK105.38 Sq.mts. ( 1134 Sq.ft. )
3 BHK106.02 Sq.mts. ( 1141 Sq.ft. )
3 BHK106.03 Sq.mts. ( 1141 Sq.ft. )
3 BHK106.63 Sq.mts. ( 1148 Sq.ft. )
3 BHK106.82 Sq.mts. ( 1150 Sq.ft. )
3 BHK107.43 Sq.mts. ( 1156 Sq.ft. )
3 BHK107.45 Sq.mts. ( 1157 Sq.ft. )
1 BHK44.52 Sq.mts. ( 479 Sq.ft. )
2 BHK65.59 Sq.mts. ( 706 Sq.ft. )
2 BHK68.58 Sq.mts. ( 738 Sq.ft. )
2 BHK72.19 Sq.mts. ( 777 Sq.ft. )
2.5 BHK82.98 Sq.mts. ( 893 Sq.ft. )
2 BHK71.92 Sq.mts. ( 774 Sq.ft. )
2.5 BHK83.7 Sq.mts. ( 901 Sq.ft. )
2.5 BHK80.69 Sq.mts. ( 869 Sq.ft. )
2.5 BHK81.34 Sq.mts. ( 876 Sq.ft. )
3 BHK106.86 Sq.mts. ( 1150 Sq.ft. )
3 BHK107.49 Sq.mts. ( 1157 Sq.ft. )
2.5 BHK80.65 Sq.mts. ( 868 Sq.ft. )
2.5 BHK81.35 Sq.mts. ( 876 Sq.ft. )
2.5 BHK82.92 Sq.mts. ( 893 Sq.ft. )
2.5 BHK83.71 Sq.mts. ( 901 Sq.ft. )
3 BHK106.87 Sq.mts. ( 1150 Sq.ft. )
1 BHK44.14 Sq.mts. ( 475 Sq.ft. )
2 BHK63.38 Sq.mts. ( 682 Sq.ft. )
2 BHK67.99 Sq.mts. ( 732 Sq.ft. )
3 BHK91.58 Sq.mts. ( 986 Sq.ft. )
3 BHK91.84 Sq.mts. ( 989 Sq.ft. )
3 BHK88.98 Sq.mts. ( 958 Sq.ft. )
3 BHK91.86 Sq.mts. ( 989 Sq.ft. )
1 BHK34.18 Sq.mts. ( 368 Sq.ft. )
1 BHK34.65 Sq.mts. ( 373 Sq.ft. )
1 BHK36.74 Sq.mts. ( 395 Sq.ft. )
1 BHK43.22 Sq.mts. ( 465 Sq.ft. )
1 BHK33.38 Sq.mts. ( 359 Sq.ft. )
1 BHK37.27 Sq.mts. ( 401 Sq.ft. )
3 BHK91.72 Sq.mts. ( 987 Sq.ft. )
3 BHK91.83 Sq.mts. ( 988 Sq.ft. )
3 BHK91.74 Sq.mts. ( 987 Sq.ft. )
3 BHK91.77 Sq.mts. ( 988 Sq.ft. )
3 BHK92.81 Sq.mts. ( 999 Sq.ft. )
1 BHK33.59 Sq.mts. ( 362 Sq.ft. )
3 BHK100.76 Sq.mts. ( 1085 Sq.ft. )
3 BHK91.15 Sq.mts. ( 981 Sq.ft. )
3 BHK91.67 Sq.mts. ( 987 Sq.ft. )
3 BHK91.87 Sq.mts. ( 989 Sq.ft. )
2.5 BHK82.45 Sq.mts. ( 887 Sq.ft. )
3 BHK91.73 Sq.mts. ( 987 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Godrej Centrallast updated on 10 Mar 2024 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
CLUB HOUSE100% completed
95% Complete
Complete
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Complete
Energy management100% completed
95% Complete
Igbc Compliant
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Requirements
Landscaping & Tree Planting100% completed
95% Complete
Complete
Open Parking100% completed
95% Complete
By Developer
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work In Progress
Solid Waste Management And Disposal100% completed
95% Complete
Work In Progress
Storm Water Drains100% completed
95% Complete
Complete
Street Lighting100% completed
95% Complete
In Mcgm Scope
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Complete
Water Conservation, Rain water Harvesting100% completed
95% Complete
Water Tank Provided
Water Supply100% completed
95% Complete
To Be Supplied By Bmc
Buildings / Wings in Godrej Central
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Godrej Central by Godrej Landmark Redevelopers Private Limitedlast updated on 10 Mar 2024 as per information obtained from MARA RERA.

188822 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 20

Wings / Towers in Project

Apartments Statistics

928 apartments in total
Total
928
Booked
925
Available
3

Saleable Area Statistics (Sq. ft.)

751687 Total
Total
751687
Booked
749658
Available
2029
Total 928 apartments in project. 925 apartments booked. 99% apartments booked.
Total 751687 Sq.ft. saleable area. 749658 saleable area booked.
100% area booked.

A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ASep 2020161210585
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK55.17 Sq.mts. ( 594 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK70.06 Sq.mts. ( 754 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK72.18 Sq.mts. ( 777 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK72.25 Sq.mts. ( 778 Sq.ft. )16
16 Booked100% Booked
100% Booked
2.5 BHK83 Sq.mts. ( 893 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK83.77 Sq.mts. ( 902 Sq.ft. )15
15 Booked100% Booked
100% Booked
63 total apartments / 63 apartments booked. 100% apartments booked.
Work Description in Building ACompletion

B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BNov 20181612106146
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK105.38 Sq.mts. ( 1134 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK106.02 Sq.mts. ( 1141 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK106.03 Sq.mts. ( 1141 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK106.63 Sq.mts. ( 1148 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK106.82 Sq.mts. ( 1150 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK107.43 Sq.mts. ( 1156 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK107.45 Sq.mts. ( 1157 Sq.ft. )15
15 Booked100% Booked
100% Booked
64 total apartments / 64 apartments booked. 100% apartments booked.
Work Description in Building BCompletion

Building No 14 Tower I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 14 Tower ISep 202016111038
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.52 Sq.mts. ( 479 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK65.59 Sq.mts. ( 706 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK68.58 Sq.mts. ( 738 Sq.ft. )16
16 Booked100% Booked
100% Booked
47 total apartments / 47 apartments booked. 100% apartments booked.
Work Description in Building Building No 14 Tower ICompletion

C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
CNov 2018161210582
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.18 Sq.mts. ( 777 Sq.ft. )30
30 Booked100% Booked
100% Booked
2 BHK72.19 Sq.mts. ( 777 Sq.ft. )14
14 Booked100% Booked
100% Booked
2.5 BHK82.98 Sq.mts. ( 893 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK83.77 Sq.mts. ( 902 Sq.ft. )15
15 Booked100% Booked
100% Booked
60 total apartments / 60 apartments booked. 100% apartments booked.
Work Description in Building CCompletion

D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
DNov 2018161210682
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.06 Sq.mts. ( 754 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK71.92 Sq.mts. ( 774 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK72.18 Sq.mts. ( 777 Sq.ft. )16
14 Booked87% Booked
87% Booked
2.5 BHK83.7 Sq.mts. ( 901 Sq.ft. )14
14 Booked100% Booked
100% Booked
60 total apartments / 58 apartments booked. 96% apartments booked.
Work Description in Building DCompletion

E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ENov 20181612106101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK80.69 Sq.mts. ( 869 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK81.34 Sq.mts. ( 876 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK106.86 Sq.mts. ( 1150 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK107.49 Sq.mts. ( 1157 Sq.ft. )30
30 Booked100% Booked
100% Booked
48 total apartments / 48 apartments booked. 100% apartments booked.
Work Description in Building ECompletion

F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
FJan 1900161210570
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.19 Sq.mts. ( 777 Sq.ft. )16
16 Booked100% Booked
100% Booked
2.5 BHK80.65 Sq.mts. ( 868 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK81.35 Sq.mts. ( 876 Sq.ft. )15
15 Booked100% Booked
100% Booked
2.5 BHK82.92 Sq.mts. ( 893 Sq.ft. )1
1 Booked100% Booked
100% Booked
2.5 BHK83.71 Sq.mts. ( 901 Sq.ft. )15
15 Booked100% Booked
100% Booked
48 total apartments / 48 apartments booked. 100% apartments booked.
Work Description in Building FCompletion

G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
GSep 20201612106116
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK72.19 Sq.mts. ( 777 Sq.ft. )32
32 Booked100% Booked
100% Booked
3 BHK106.87 Sq.mts. ( 1150 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK107.49 Sq.mts. ( 1157 Sq.ft. )30
30 Booked100% Booked
100% Booked
64 total apartments / 64 apartments booked. 100% apartments booked.
Work Description in Building GCompletion

H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
HNov 2018141110047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.14 Sq.mts. ( 475 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK63.38 Sq.mts. ( 682 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK67.99 Sq.mts. ( 732 Sq.ft. )14
14 Booked100% Booked
100% Booked
42 total apartments / 41 apartments booked. 97% apartments booked.
Work Description in Building HCompletion

L

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
LJan 1900141110039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK91.58 Sq.mts. ( 986 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK91.84 Sq.mts. ( 989 Sq.ft. )13
13 Booked100% Booked
100% Booked
27 total apartments / 27 apartments booked. 100% apartments booked.
Work Description in Building LCompletion

M

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
MJan 1900141110039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK88.98 Sq.mts. ( 958 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK91.84 Sq.mts. ( 989 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK91.86 Sq.mts. ( 989 Sq.ft. )14
14 Booked100% Booked
100% Booked
41 total apartments / 41 apartments booked. 100% apartments booked.
Work Description in Building MCompletion

Mhada Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mhada Building No 2Jan 190016111037
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.18 Sq.mts. ( 368 Sq.ft. )64
64 Booked100% Booked
100% Booked
64 total apartments / 64 apartments booked. 100% apartments booked.
Work Description in Building Mhada Building No 2Completion

Mhada Building No 23

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mhada Building No 23Jan 190014111027
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.65 Sq.mts. ( 373 Sq.ft. )41
41 Booked100% Booked
100% Booked
1 BHK36.74 Sq.mts. ( 395 Sq.ft. )13
13 Booked100% Booked
100% Booked
1 BHK43.22 Sq.mts. ( 465 Sq.ft. )1
1 Booked100% Booked
100% Booked
55 total apartments / 55 apartments booked. 100% apartments booked.
Work Description in Building Mhada Building No 23Completion

Mhada Building No 37

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mhada Building No 37Jan 190013111025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.38 Sq.mts. ( 359 Sq.ft. )52
52 Booked100% Booked
100% Booked
52 total apartments / 52 apartments booked. 100% apartments booked.
Work Description in Building Mhada Building No 37Completion

N

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NSep 2020141110039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.27 Sq.mts. ( 401 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK91.72 Sq.mts. ( 987 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK91.83 Sq.mts. ( 988 Sq.ft. )14
14 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building NCompletion

O

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
OJan 1900141110039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK91.74 Sq.mts. ( 987 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK91.77 Sq.mts. ( 988 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK92.81 Sq.mts. ( 999 Sq.ft. )14
14 Booked100% Booked
100% Booked
41 total apartments / 41 apartments booked. 100% apartments booked.
Work Description in Building OCompletion

P

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
PSep 2020141110039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.59 Sq.mts. ( 362 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK91.84 Sq.mts. ( 989 Sq.ft. )13
13 Booked100% Booked
100% Booked
14 total apartments / 14 apartments booked. 100% apartments booked.
Work Description in Building PCompletion

Prive Tower J Building No 39

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Prive Tower J Building No 39Sep 20201411101419
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK100.76 Sq.mts. ( 1085 Sq.ft. )28
28 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building Prive Tower J Building No 39Completion

Q

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
QSep 2020141110039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK91.15 Sq.mts. ( 981 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK91.67 Sq.mts. ( 987 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK91.87 Sq.mts. ( 989 Sq.ft. )14
14 Booked100% Booked
100% Booked
41 total apartments / 41 apartments booked. 100% apartments booked.
Work Description in Building QCompletion

R

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
RSep 2020141110035
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK82.45 Sq.mts. ( 887 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK91.73 Sq.mts. ( 987 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK91.84 Sq.mts. ( 989 Sq.ft. )14
14 Booked100% Booked
100% Booked
41 total apartments / 41 apartments booked. 100% apartments booked.
Work Description in Building RCompletion
Channel Partners
Channel Partners Registered by Developer
Godrej Landmark Redevelopers Private Limited
for Project
Godrej Central
last updated on 10 Mar 2024 as per information obtained from MARA RERA.
Name Company Location Mobile Designation