Project overview

Hubtown Premiere Residences - Malibu is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800005224. Hubtown Premiere Residences - Malibu is located at Vvjyuyydqnwspl+Hrwpm9g==. This is a Ongoing being developed by Hubtown Limited.

Hubtown Premiere Residences - Malibu has 2 BHK, 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 1128 to 901 Sq.ft. Carpet. The Project has total 76 of which 6 are currently available for sale.

Hubtown Premiere Residences - Malibu is being developed on a total land area of 5359 Sq.ft. Hubtown Premiere Residences - Malibu has 2 Wings / Towers Malibu - 14Th To 25Th Floor,Malibu - Upto 13Th Floor

ProjectDeveloperLocationPossession
AtlantisCrystal Pride Developers8Yu0dv8zn/J20iltfy4l1w==30-12-2025 00:00:00
Andheri Sahkar Co-Operative Housing Society Ltd.Sai Siddhant Developers40005330-06-2017 00:00:00
Hubtown Premiere Residences - BeverlyHubtown LimitedD0ufp31g/+Pysnhsho6hlg==31-07-2029 00:00:00
Azad Nagar Kedar Darshan ChslPrathamesh Krupa Buildcon Private LimitedKlwbm1sidmnpgtsd0tyghg==19-08-2018 00:00:00
The GatewayConoor Builders Private LimitedFj9cgwbbqd1jdte34bzodq==31-03-2019 00:00:00
ParthenonEcstasy Realty Pvt. Ltd.Hyr29mji8e3gi+8Zzjjicob1mqihcmvuqc4iryqmoqm=31-03-2018 00:00:00
Krishna Cooperative Housing Society LimitedZenal Construction Private LtdRjswcaoav5dkgxthmoq3ta==30-12-2021 00:00:00
Star One Realcon Pvt LtdStar One Realcon Pvt LtdVl2aluudacr9vzu9pp63na==01-12-2019 00:00:00
Ajmeri HeightsShubham DevelopersGaondevi Dongri Road31-07-2019 00:00:00
Solaris Titanium TowersSolaris Developers Private LimitedShl6btn0kkacdjpukawhla==31-12-2019 00:00:00
Platinum ParkShreeji Developers6L7rndph0c+Xz+Aetk8brq==30-06-2021 00:00:00
Hubtown Premiere Residences - Tower 3Hubtown Limited+Gpxsfqdly2aqqqv+Xmsjw==31-07-2029 00:00:00
Pearl HazelineChandiwala EnterprisesHnfai6bzz7j01rtpsviedwqg0b3efhtlicrwrinbu/Bm7kxrb+G2iziqpocqug2y31-05-2018 00:00:00
Fairmont MokshFairmont Constructions Private LimitedQe3fsv+Jjjhqertxgjjw3ii3m+Dhfc35dh0szwziqym=31-12-2019 00:00:00
Jeevan Kanchan Co-Operative Housing Society Ltd. Shri Krishna Chaitanya Enterprises Evmmfv3x0kzvsas/5Zz5bvmnz+Tfvfme8chfog9l7g0=30-03-2018 00:00:00
Hetali AnuchhayaHetali EnterprisesQumdoh1pemaun3hfxbwwdg==25-03-2018 00:00:00
VighnarajendraPsc Properties Private LimitedJfv1cgpua3hsnmzrhc2zf/Lbtgm8gortuqurpocxyuc=31-12-2017 00:00:00
Green WoodPerfect ConstructionR1rrax3wsmd43ysdljfkcg==31-12-2019 00:00:00
Shrey ApartmentAditi ConstructionsF/Ycmydskix3nhgqxpnvra==31-12-2019 00:00:00
Hubtown Premiere Residences - CommercialHubtown Limited+Gpxsfqdly2aqqqv+Xmsjw==31-07-2026 00:00:00
Platinum Tower - 7Tirupati Gruhpravesh Llp+Subuen3uwxxzfk742s0al5agucvcm2bxgserrqnv1i=30-06-2019 00:00:00
Kabra ParadiseKabra Estate And Investment ConsultantsSscawphvq+Kocbd80wdnrq==31-12-2018 00:00:00
Stadium ViewAcme Avenue Infrastructure Pvt. Ltd.76Zsfgsvwskym9k4q7ecka==31-12-2019 00:00:00
Labh Samarth HeightM.V. Labh AssociatesKgpqcirrdbr+Q42kncotemlhunvwdevmriyvuseagrs=31-12-2018 00:00:00
Aryaman TanishAryaman Infratech India Pvt Ltd40005831-12-2017 00:00:00
Shivneri Chs LtdShree Chamunda PropertiesD0nvsvupq8tw0w8gdq1gz5ctc4vw0konew/Mhxu2/Peca/Rsrevvzdbjcqxv448woga/P7nwki/1Ypre6188yw==31-03-2019 00:00:00
Tapsya Chsl Phase Ii Additional Fsi From 16Th To 22Nd FloorNeminath Homes Private LimitedWeb4dc00wfhtc10gvvf73a==31-12-2022 00:00:00
Mdm ZionMdm Realty LlpK+Xumaby95en2qz2zhq1uraxm8lafuqjndbtb0/6+Scxeas2liform6g4/Itsmas31-12-2023 00:00:00
Hubtown Premiere Residences - Bel AirHubtown LimitedVvjyuyydqnwspl+Hrwpm9g==31-07-2026 00:00:00
Swiz HeightsMohid Construction CoTihzif28rbhmjk1+7U86qw==31-12-2019 00:00:00
Chandra Darshan AradhyaKalpsutra Homes LlpUjcotj32rhogg68164gm7a==30-12-2024 00:00:00
Artic BuildingCordcon Builders Private LimitedItmd+Vq0p/0V1xlae/Mhzgnir29e7bxvvesobjshv0g=30-03-2023 00:00:00
Moongipa LandmarkMoongipa Realty Private LimitedMumbai Suburban31-10-2018 00:00:00
D N Nagar Shivneri Chs LtdSai Siddhant DevelopersGanesh Chawk31-07-2017 00:00:00
Swagat Co. Op. Housing Soc. Ltd.Neminath Homes Private LimitedJ86lagbwr8lakeneksi/Wg==31-07-2019 00:00:00
Johns WishOm DevelopersVzhqg6vjbuj3ssvzajyufq==30-06-2019 00:00:00
Aryaman CrestAryaman Infratech India Pvt LtdOff Link Road31-12-2019 00:00:00
SeablissAsshna Developers WestinEpiktieltdlohuuc1sm5rg==31-12-2026 00:00:00
Linkbay Residences Phase IPortsmouth Buildcon Private LimitedVce+Sbnp4x4aouoevnxxzkgvwuss6at40xy34gugnbg=31-10-2028 00:00:00
Roswalt ZaidenA S Hightech LlpBiwlshd0y/5Agkqegbp2vuitt7hvnfnwqclogx3mhv0e5chui/G2skeibrmpqkfslyqn82a51/B+Gbyu+Ohqe5l1zxxii3sd2exb1ggvisc=31-12-2028 00:00:00
Hubtown Premiere Residences - Tower 2Hubtown Limited+Gpxsfqdly2aqqqv+Xmsjw==31-07-2029 00:00:00
Ganesh Krupa Co. Op. Housing Soc. Ltd.Neminath Homes Private LimitedCh2jbdfwyrmz7yrsapnbtq==31-07-2019 00:00:00
Matruchaya Chs LtdSwastik Realty Pvt Ltd3Vcon6fwkomiisu+T06gaw==30-06-2021 00:00:00
Sai DarshanShah Patel & CoDxjlzgtasnb9ytqd4gcr7q==30-12-2021 00:00:00
Andheri Indira Nagar Chs LimitedJaspal Singh SuriZpeauompcnl/X0rlkuq8fw==31-12-2018 00:00:00
Sagar Darshan Chs LtdNirmitee DevelopersUpmdoigwjiqcnpa1lxltq6jkfx2e2qrbjbp6wdcfabrfl8f96si1wjgwloaiftv720-03-2020 00:00:00
D N Nagar Niwara Chs LtdWestin Spaces Private LimitedTdj8uitoy03a2pgfdgevolmv/O91eazqr2p6apjietqnoqhjv6sg0+Jwywnlxdcw31-03-2019 00:00:00
Pearl HarmonyChandiwala EnterprisesBhgblndrt0tlydloo1qnda==30-12-2021 00:00:00
Andheri EktaMumbai Shelter Combines LlpVkjc6lrzw2y5evgalm4sk1vmnxrdn21deatje67dqvggeexeno+Txyqpzvmsn2qp30-09-2018 00:00:00
Lotus Link SquareLotus Grih Nirman Private LimitedQe/U4kioycbt9de78k4uhcmb9ro37c7wcczfkuugl5fzkphsi+1Dhwfgseso3bai31-12-2019 00:00:00
Hubtown Premiere Residences - MalibuHubtown LimitedVvjyuyydqnwspl+Hrwpm9g==31-07-2029 00:00:00
Auris BlissTranscon-Sheth Creators Private LimitedYlkgr9wfsfaktglxwwfu83zxtpyq4ov1wu0t6nswkviu2nhm0jurgfywvjaulml8yn09sxlezpmwl/Wtpuatiq==30-12-2024 00:00:00
Kabra Metro One Wing A And B A Redevelopment Project Of Pratap ChslKabra And AssociatesEadi2mgbyirlzey+Sp00mg==30-12-2022 00:00:00
PARIVAR CO-OP HOUSING SOCIETYVIJAY MALLYAMumbai Suburban, 40005831-12-2018 00:00:00
Laxmi Business ParkLaxmi Industrial EstateOv4ajidjqojrvkm2qcwn3g==31-12-2018 00:00:00
Tapsya Co. Op. Housing Soc. Ltd.Neminath Homes Private LimitedW7o7egdvagkr1rvplvnhdq==31-07-2019 00:00:00
Sarthak HeightsSarthak DevelopersRwhagryowucnjpmdnnx8fa==30-11-2019 00:00:00
Moongipa ArcadeMoongipa Realty Private LimitedAfh28bhw6s9foa8o/Ovozkhkc3cjqyoprray3vt4xme=30-12-2023 00:00:00
K M EnterprisesK M EnterprisesZe/Mizggsvb3ub7yqqriqjn12kjcskhvxvxewxalpcnmeqx4hhxck8lrl1jrzluq31-12-2018 00:00:00
Winspace AmelioBini Builders Private LimitedYizgeaxiq7nhhcu+Nghofynaeom1cn4snsxw9ny7apo11jlgugpnjj1tl+Ephzlu30-06-2021 00:00:00
Redevelopment Of State Bank Of India Employees Shree Co-Op Housing Soc LtdOrra Realtors Private LimitedLdhv5os0maxv1/Dgknsiwq==30-12-2021 00:00:00
Thais ResidencyMerchant Constructions Pvt. Ltd.Smoj1qtx77un661zh3qwzml2bbrlzkodkwixoyj/Zsy=31-12-2017 00:00:00
Joanita VillaWestin Developers Pvt. LtdBfmdd61vt8fftqcu9+Ejswy7t2h8ca/4Grzf9nwd8zo=30-06-2018 00:00:00
RatnadeepWestin Developers Pvt. LtdP2lxgyda8ptngk6g3rtexw==30-06-2019 00:00:00
Ravikiran Co-Operative Hsg Soc Ltd.Westin Developers Pvt. Ltd400053, Mumbai City01-06-2018 00:00:00
Cosmopolis Wing BJiten Agroland & Farm Private LimitedCeiduteepe8sxd3dm9zulbhc1ilictutfjodfo0gdro=31-03-2026 00:00:00
9 MarinaMdm Realty Developers LlpEa/Cp/Ylkoaw3cmv88dxca==31-12-2027 00:00:00
Disha ElysiumDisha ConstructionAz0obvdek2b4dgk2vltdtg==30-03-2030 00:00:00
Milap Co-Operative Housing SocietyGolden EyeconPavprd240va2a7ceqebltdl+8Rcnovbawhpzltfalds=20-03-2018 00:00:00
Western Heights - Phase 1 ResidentialAdani Estates Private LimitedFpuscusuattafwobaodyva==30-06-2018 00:00:00
Western Heights Phase 2 Commercial 1St And 2Nd FloorAdani Estates Private LimitedFpuscusuattafwobaodyva==30-06-2018 00:00:00
Hanuman NagarZodiac Developers Private LimitedHomg5w1d1rgrdn49astc4uql24jbvw1c7pwttgvdoee=30-06-2021 00:00:00
Agarwal PalazzoBalaji DevelopersTua8yazy3yjzzyd9m+Qphg==30-12-2023 00:00:00
Acknurs LagrandeAccanoor AssociatesMumbai Suburban, 40005830-12-2022 00:00:00
TapodhanGurukul Realty LlpIq3c/Mviwijkyu/K7sx75bx8wcuvqzvb/C4vu0adh/I=31-12-2026 00:00:00
Gurukrupa DhyanamGurukrupa Realcon Infrabuild LlpQ8uivi3tcqwzjzvrsde96q==31-03-2027 00:00:00
Hubtown VivaWellgroomed VentureEkafqf54kzjk3khg6mfviw==31-07-2019 00:00:00
Mk GraciaA R Amboli Developers Private LimitedRp2mpsjnomtgfg1faf3sunk7dqnfn6ahza8f+S9nwcjtf5qxtao/71Mfq4408x3na6n+Mbutdcup40bznvjkixj6yvbd5ywqjfpa4jau0nghfixtnxxyd3rjtoq77adyvaro3ylhvpdu2tmj9nsaua==31-12-2025 00:00:00
Trilok HeightsRashi Realty31-12-2028 00:00:00
Sapphire By GeeceeGeecee Ventures Limited30-06-2029 00:00:00
Makskap CentreDilip Estate & Town Planners Pvt LtdXolywd526vbukd0wz8k6vqgwwcoxsn9odpsiymcngok=31-12-2019 00:00:00
Cd Plot No 7Sd Svp Nagar Redevelopment Private LimitedIrzjfbjuqnpxhzzansxqaw==31-10-2019 00:00:00
Shree PranamMeghna Infracon Infrastructure Limited25-12-2029 00:00:00
Redevelopment Of Daulatrao Desai Nagar ChslPranav Constructions Limited14-11-2028 00:00:00
AthenaAstrum Developers30-08-2027 00:00:00
Morya Galani HomesMorya Galani Homes Private Limted31-01-2032 00:00:00
Horizon ViewI.R.Developers LlpN65zumhrjdhrdmd8+Gvekg==31-03-2027 00:00:00
Orchid AarambhOrchid Realty31-10-2028 00:00:00
The Redevelopment Of You And I ChslPranav Constructions Limited07-02-2029 00:00:00
SerenovaKolte-Patil Developers Limited31-05-2029 00:00:00
Municipal Staff Sahayog Chs LtdKonark Structural Engineers Private Limited31-12-2029 00:00:00
Roswalt Shatataraka (Unit A) ChslRoswalt Realty Private Limited28-09-2028 00:00:00
SigniaHeadway Believe Realty Llp31-03-2030 00:00:00
Vann By AjmeraAjmera Realty And Infra India Ltd 31-01-2031 00:00:00
Viceroy VisavaSpacious Properties Llp30-06-2031 00:00:00
Linkbay Residences Phase Ii Wing BPortsmouth Buildcon Private Limited And Shiv Infra Vision Private Limited30-06-2030 00:00:00
Mesacon Magic CarpetMagic Carpet Co Operative Housing Society Ltd 31-07-2028 00:00:00
Khandelwal TattvaShree Krishna Sai Development Corporation31-12-2030 00:00:00
Khandelwal AcropolisShree Krishna Sai Development Corporation31-12-2030 00:00:00
Project Details
  • Project:
    Hubtown Premiere Residences - Malibu
  • Location:
  • Vvjyuyydqnwspl+Hrwpm9g==
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jul 2029
Developer Details

  • Developer:
    Hubtown Limited
  • Phone:
  • Address:
  • Hubtown Seasons
Project RERA Details
MAHA REARA No: P51800005224
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Aakar Architect (Mr. Umesh Pawar)
Funding Bank HDFC BANK
Proposed Possession 31 Jul 2029
Revised Possession 31 Jul 2029
Extended Possession
Litigations No Litigations
Last Modified 17 Mar 2018
Last Retrived 13 Feb 2026
Hubtown Premiere Residences - Malibu QR Code
Hubtown Premiere Residences - Malibu
MahaRERA - P51800005224
Apartment Details & Configuration
TypeArea
2 BHK65.29 Sq.mts. ( 703 Sq.ft. )
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )
2 BHK69.86 Sq.mts. ( 752 Sq.ft. )
2 BHK78.6 Sq.mts. ( 846 Sq.ft. )
2 BHK78.92 Sq.mts. ( 849 Sq.ft. )
2 BHK80.31 Sq.mts. ( 864 Sq.ft. )
2 BHK83.23 Sq.mts. ( 896 Sq.ft. )
2 BHK83.72 Sq.mts. ( 901 Sq.ft. )
2 BHK85.52 Sq.mts. ( 921 Sq.ft. )
2 BHK86.91 Sq.mts. ( 935 Sq.ft. )
3 BHK94.93 Sq.mts. ( 1022 Sq.ft. )
3 BHK105.3 Sq.mts. ( 1133 Sq.ft. )
3 BHK105.62 Sq.mts. ( 1137 Sq.ft. )
3 BHK105.83 Sq.mts. ( 1139 Sq.ft. )
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )
2 BHK65.2 Sq.mts. ( 702 Sq.ft. )
2.5 BHK77.68 Sq.mts. ( 836 Sq.ft. )
2.5 BHK78.12 Sq.mts. ( 841 Sq.ft. )
2.5 BHK82.65 Sq.mts. ( 890 Sq.ft. )
2.5 BHK83.15 Sq.mts. ( 895 Sq.ft. )
3 BHK104.79 Sq.mts. ( 1128 Sq.ft. )
3 BHK105.11 Sq.mts. ( 1131 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hubtown Premiere Residences - Malibulast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Club House
Layout Amenity
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Layout Amenity
Energy management
Layout Amenity
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Building / Layout Amenity
Landscaping & Tree Planting50% completed
50% Complete
Layout Amenity
Open Parking
Layout Amenity
Sewerage (Chamber, Lines, Septic Tank , STP)85% completed
85% Complete
Building / Layout Amenity
Solid Waste Management And Disposal
Layout Amenity
Storm Water Drains50% completed
50% Complete
Layout Amenity
Street Lighting
Layout Amenity
Treatment And Disposal Of Sewage And Sullage Water
Layout Amenity
Water Conservation, Rain water Harvesting
Layout Amenity
Water Supply100% completed
95% Complete
Building / Layout Amenity
Buildings / Wings in Hubtown Premiere Residences - Malibu
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hubtown Premiere Residences - Malibu by Hubtown Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

5359 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

76 apartments in total
Total
76
Booked
70
Available
6

Saleable Area Statistics (Sq. ft.)

67870 Total
Total
67870
Booked
63159
Available
4712
Total 76 apartments in project. 70 apartments booked. 92% apartments booked.
Total 67870 Sq.ft. saleable area. 63159 saleable area booked.
93% area booked.

Malibu - 14Th To 25Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Malibu - 14Th To 25Th FloorJul 2028121214092
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.29 Sq.mts. ( 703 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )10
9 Booked90% Booked
90% Booked
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK69.86 Sq.mts. ( 752 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK78.6 Sq.mts. ( 846 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK78.92 Sq.mts. ( 849 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK80.31 Sq.mts. ( 864 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK83.23 Sq.mts. ( 896 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK83.72 Sq.mts. ( 901 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK85.52 Sq.mts. ( 921 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK86.91 Sq.mts. ( 935 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK94.93 Sq.mts. ( 1022 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK105.3 Sq.mts. ( 1133 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK105.62 Sq.mts. ( 1137 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK105.83 Sq.mts. ( 1139 Sq.ft. )1
1 Booked100% Booked
100% Booked
44 total apartments / 41 apartments booked. 93% apartments booked.
Work Description in Building Malibu - 14Th To 25Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress96% done
96% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Malibu - Upto 13Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Malibu - Upto 13Th FloorJul 202891214070
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK65.2 Sq.mts. ( 702 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )2
1 Booked50% Booked
50% Booked
2.5 BHK77.68 Sq.mts. ( 836 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK78.12 Sq.mts. ( 841 Sq.ft. )3
3 Booked100% Booked
100% Booked
2.5 BHK78.6 Sq.mts. ( 846 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK82.65 Sq.mts. ( 890 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK83.15 Sq.mts. ( 895 Sq.ft. )5
5 Booked100% Booked
100% Booked
2.5 BHK83.72 Sq.mts. ( 901 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK104.79 Sq.mts. ( 1128 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK105.11 Sq.mts. ( 1131 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 BHK105.62 Sq.mts. ( 1137 Sq.ft. )2
2 Booked100% Booked
100% Booked
32 total apartments / 29 apartments booked. 90% apartments booked.
Work Description in Building Malibu - Upto 13Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress96% done
96% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress96% done
96% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Hubtown Limited
for Project
Hubtown Premiere Residences - Malibu
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation