Project overview

Ideal Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001084. Ideal Chsl is located at Gulmohar Road, Juhu, Juhu. This is a On-Going Project being developed by Neumec Infrastructure Llp.

Ideal Chsl has 3 BHK Apartments with carpet areas ranging from 1104 to 1159 Sq.ft. Carpet. The Project has total 24 of which 7 are currently available for sale.

Ideal Chsl is being developed on a total land area of 15048 Sq.ft. Ideal Chsl has 1 Wings / Towers Ideal Chsl

ProjectDeveloperLocationPossession
Ideal ChslNeumec Infrastructure LlpGulmohar Road, Juhu, Juhu31-12-2019 00:00:00
Western Heights - Phase 1 ResidentialAdani Estates Private LimitedAndheri, Dn Nagar, Dn Nagar30-06-2018 00:00:00
Rustomjee Elements - Wing SgRustomjee Realty Private LimitedD. N. Nagar, D. N. Nagar31-12-2018 00:00:00
Sarthak HeightsSarthak DevelopersMumbai Suburban, 40005815-02-2018 00:00:00
Moongipa ArcadeMoongipa Realty Private LimitedMumbai, Mumbai31-12-2013 00:00:00
Divyam HeightsHersh ConstructionGilbert Hill Road, Gilbert Hill, Gilbert Hill31-12-2017 00:00:00
Jeevan Kanchan Co-Operative Housing Society Ltd. Shri Krishna Chaitanya EnterprisesMumbai Suburban, 40005830-03-2018 00:00:00
Hetali AnuchhayaHetali EnterprisesJuhu Lane, Juhu Lane25-03-2018 00:00:00
VighnarajendraPsc Properties Private LimitedMumbai Suburban, 40005831-08-2016 00:00:00
Juhu AcropolisBharat Realty Venture Private LimitedGulmohar Cross Road No 10, Jvpd Scheme, Jvpd Scheme30-06-2023 00:00:00
Lotus RoyaleArvind DesaiPlot No 68, Ns Road No 8, Jvpd Scheme, Vile Parle (W), Juhu, Juhu, Plot No 68, Ns Road No 8, Jvpd Scheme21-09-2022 00:00:00
Project Details
  • Project:
    Ideal Chsl
  • Location:
  • Gulmohar Road, Juhu, Juhu
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Neumec Infrastructure Llp
  • Phone:
  • Address:
  • 807/808, B Wing Hubtown Solaris, N S Phadke Marg, Opp Telly Gully, Andheri East, 400069
Project RERA Details
MAHA REARA No: P51800001084
Project Type Residential
RERA Project Status On-Going Project
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 29 Jan 2020
Last Retrived 14 Jan 2025
Ideal Chsl QR Code
Ideal Chsl
MahaRERA - P51800001084
Apartment Details & Configuration
TypeArea
3 BHK102.56 Sq.mts. ( 1104 Sq.ft. )
3 BHK103.12 Sq.mts. ( 1110 Sq.ft. )
3 BHK107.49 Sq.mts. ( 1157 Sq.ft. )
3 BHK107.67 Sq.mts. ( 1159 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ideal Chsllast updated on 14 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Electrical Meter Panel &Amp; Substation
Energy management
Na
Fire Protection And Fire Safety Requirements40% completed
40% Complete
As Per Cfo;S Noc
Fitness Centre80% completed
80% Complete
Fitness Centre
Landscaping & Tree Planting
Tree Planting
Open Parking
2 Numbers
Sewerage (Chamber, Lines, Septic Tank , STP)75% completed
75% Complete
Chambers &Amp; Sewer Lines
Solid Waste Management And Disposal
Na
Storm Water Drains60% completed
60% Complete
As Per Mcgm
Street Lighting
Na
Swimming Pool
Rooftop Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting75% completed
75% Complete
Rain Water Harvesting
Water Supply
As Per Mcgm
Buildings / Wings in Ideal Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ideal Chsl by Neumec Infrastructure Llplast updated on 14 Jan 2025 as per information obtained from MARA RERA.

15048 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
17
Available
7

Saleable Area Statistics (Sq. ft.)

26669 Total
Total
26669
Booked
18918
Available
7752
Total 24 apartments in project. 17 apartments booked. 70% apartments booked.
Total 26669 Sq.ft. saleable area. 18918 saleable area booked.
71% area booked.

Ideal Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ideal ChslDec 2019141113292
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK102.56 Sq.mts. ( 1104 Sq.ft. )11
8 Booked72% Booked
72% Booked
3 BHK103.12 Sq.mts. ( 1110 Sq.ft. )11
7 Booked63% Booked
63% Booked
3 BHK107.49 Sq.mts. ( 1157 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK107.67 Sq.mts. ( 1159 Sq.ft. )1
1 Booked100% Booked
100% Booked
24 total apartments / 17 apartments booked. 70% apartments booked.
Work Description in Building Ideal ChslCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Neumec Infrastructure Llp
for Project
Ideal Chsl
last updated on 14 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation