Project overview

Ideal Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001084. Ideal Chsl is located at Tr5zaiwejy2u46gkzvpti6lpcbbaqktvi1khoszw5enunnupnahqzjrtclcjep72. This is a Ongoing being developed by Neumec Infrastructure Llp.

Ideal Chsl has 3 BHK Apartments with carpet areas ranging from 1104 to 1159 Sq.ft. Carpet. The Project has total 24 of which 7 are currently available for sale.

Ideal Chsl is being developed on a total land area of 15048 Sq.ft. Ideal Chsl has 1 Wings / Towers Ideal Chsl

ProjectDeveloperLocationPossession
Andheri Sahkar Co-Operative Housing Society Ltd.Sai Siddhant Developers40005330-06-2017 00:00:00
Krishna Cooperative Housing Society LimitedZenal Construction Private LtdRjswcaoav5dkgxthmoq3ta==30-12-2021 00:00:00
Gurnani Palms Wing AInterintel ConstructionsXccoptn2xb8i6z710fptcmczipk1hfxnxflvbbjkys0=31-12-2018 00:00:00
Rustomjee Elements - Wing ScRustomjee Realty Private LimitedXpnwalivj7xikxzmntoqlazk70g3bkxtrjxktjoa01ucf5mvs7jo6xs8i0nxsunc30-06-2021 00:00:00
SukhmaniMoonland Builders Pvt.Ltd.Mumbai Suburban, 40004931-03-2025 00:00:00
Redevelopment Of Silverlight ChslShree Mahavir Estates8Nlqb5bzmzrngsuo8zscn58pmquucpkckttmnd3tx6j8wtidc/Zsdiun1/3Mcrfe1czrolxvz1oni8i/Xgme3q==30-12-2020 00:00:00
The GatewayConoor Builders Private LimitedFj9cgwbbqd1jdte34bzodq==31-03-2019 00:00:00
AriaParinee Realtors Pvt. Ltd.H5dazeq/0Yo2lsdkrdg4cdczrvah3fh8rkrco75gbxdwp/Ot/Meu6ejjgxjwf/Vd30-12-2020 00:00:00
Ajmeri HeightsShubham DevelopersGaondevi Dongri Road31-07-2019 00:00:00
Platinum ParkShreeji Developers6L7rndph0c+Xz+Aetk8brq==30-06-2021 00:00:00
Rajveer ApartmentsHersh Construction03Tpkzqxo2tjnll8cq5w0w==30-12-2031 00:00:00
Mobin HeightsGahlot Development Services Pvt. Ltd.Xls+2N83vxlrkadrvfbrqwd98dtai0shfypkhgr2by5qh5xzxf6wgtul/32Asmtgs5pu9rdr2ksrmddqluzbnumkqjb1zkzutnfqxyllabjfl2in16kosqj/Pswkstgk30-12-2022 00:00:00
Krishaang B WingJaycee Homes Private LimitedTbuisfnrqiwgzozef+Ctiwtqjjokcycaouq8ywhwk+Rqvvirxqf9ldomg/Jpvidiewgtscu7xnj8son2uklgxs174u+7Jjed6c8jfugimim=31-07-2018 00:00:00
Jeevan Kanchan Co-Operative Housing Society Ltd. Shri Krishna Chaitanya Enterprises Evmmfv3x0kzvsas/5Zz5bvmnz+Tfvfme8chfog9l7g0=30-03-2018 00:00:00
Parmar HeritageKonark & AssociatesJk9/Zmkka0rt5ntndzzukq==17-06-2022 00:00:00
Hetali AnuchhayaHetali EnterprisesQumdoh1pemaun3hfxbwwdg==25-03-2018 00:00:00
Dn Nagar Panchavati Co-Operative Housing Society Limited- Gokul PanchavatiSurya-Landmark Developers Private Limited4Vdgtva4odc9rlnrbp0+Ua==31-12-2019 00:00:00
Pearl HazelineChandiwala EnterprisesHnfai6bzz7j01rtpsviedwqg0b3efhtlicrwrinbu/Bm7kxrb+G2iziqpocqug2y31-05-2018 00:00:00
Fairmont MokshFairmont Constructions Private LimitedQe3fsv+Jjjhqertxgjjw3ii3m+Dhfc35dh0szwziqym=31-12-2019 00:00:00
Laxmi KunjGeecee Ventures LimitedHeigniqpyqv6aflf7+Sn9a==31-12-2024 00:00:00
Shelton EliteMarriott Realtors Private LimitedY7iq+Awr58olpa+Y6zh1/X97zwf67m2abgmrh4aefpr2+/7+3W74wg6efrv6thsz31-03-2026 00:00:00
Mangal Meeth Chs LtdAspen Real Estate Developers LlpRqpgz30dohxx92ty2tqh4a==31-12-2025 00:00:00
VighnarajendraPsc Properties Private LimitedJfv1cgpua3hsnmzrhc2zf/Lbtgm8gortuqurpocxyuc=31-12-2017 00:00:00
Kabra PrarthnaKabra Estate And Investment ConsultantsAzwnzj1swq0l3jd6opytyq==31-12-2018 00:00:00
Kalpataru SolitaireKalpataru LimitedMcicup2b71eytto0dnoo153x7swe0hl0e0lu5lt006qwcb2p97lmaff0u9x1i0rt31-12-2019 00:00:00
Green WoodPerfect ConstructionR1rrax3wsmd43ysdljfkcg==31-12-2019 00:00:00
Shrey ApartmentAditi ConstructionsF/Ycmydskix3nhgqxpnvra==31-12-2019 00:00:00
11 WestParinee Realty Private Limited3Qammrfdnuk9zcnv78kttyv+1E2/Qlzwvacalq0nuvi=31-12-2019 00:00:00
Artic BuildingCordcon Builders Private LimitedItmd+Vq0p/0V1xlae/Mhzgnir29e7bxvvesobjshv0g=30-03-2023 00:00:00
Moongipa LandmarkMoongipa Realty Private LimitedMumbai Suburban31-10-2018 00:00:00
D N Nagar Dwarka Chs Ltd.Sssc Escatics Pvt. Ltd.40005330-06-2018 00:00:00
Auris BlissTranscon-Sheth Creators Private LimitedYlkgr9wfsfaktglxwwfu83zxtpyq4ov1wu0t6nswkviu2nhm0jurgfywvjaulml8yn09sxlezpmwl/Wtpuatiq==30-12-2024 00:00:00
Ideal ChslNeumec Infrastructure LlpTr5zaiwejy2u46gkzvpti6lpcbbaqktvi1khoszw5enunnupnahqzjrtclcjep7231-12-2019 00:00:00
Nest Wing ASssc Escatics Pvt. Ltd.Iiftfxcc36ptlq1pm9ne2zkuvfrg0h7+E4fvyb/Fd3xyl9kwctwahjodbuf63qqixvbyi1wwx452nlz2qlw+Za==31-03-2020 00:00:00
Johns WishOm DevelopersVzhqg6vjbuj3ssvzajyufq==30-06-2019 00:00:00
PARIVAR CO-OP HOUSING SOCIETYVIJAY MALLYAMumbai Suburban, 40005831-12-2018 00:00:00
Chandra Darshan AradhyaKalpsutra Homes LlpUjcotj32rhogg68164gm7a==30-12-2024 00:00:00
D N Nagar Krishna Chs LtdSai Siddhant Developers40005330-06-2017 00:00:00
Aryaman TanishAryaman Infratech India Pvt Ltd40005831-12-2017 00:00:00
Shivneri Chs LtdShree Chamunda PropertiesD0nvsvupq8tw0w8gdq1gz5ctc4vw0konew/Mhxu2/Peca/Rsrevvzdbjcqxv448woga/P7nwki/1Ypre6188yw==31-03-2019 00:00:00
Sai DarshanShah Patel & CoDxjlzgtasnb9ytqd4gcr7q==30-12-2021 00:00:00
D N Nagar Shivneri Chs LtdSai Siddhant DevelopersGanesh Chawk31-07-2017 00:00:00
D N Nagar Niwara Chs LtdWestin Spaces Private LimitedTdj8uitoy03a2pgfdgevolmv/O91eazqr2p6apjietqnoqhjv6sg0+Jwywnlxdcw31-03-2019 00:00:00
Western Heights - Phase 1 ResidentialAdani Estates Private LimitedFpuscusuattafwobaodyva==30-06-2018 00:00:00
Rustomjee Elements - Wing SgRustomjee Realty Private LimitedXpnwalivj7xikxzmntoqlazk70g3bkxtrjxktjoa01uasovmxlvgnpnprlp8bbam31-12-2018 00:00:00
Sat Anupa Chs Phase 1Disha ConstructionF+D6aevdg/Lbkucvtxaq3g==31-03-2020 00:00:00
Andheri Indira Nagar Chs LimitedJaspal Singh SuriZpeauompcnl/X0rlkuq8fw==31-12-2018 00:00:00
AurusKingstay Real Estate Private LimitedTzwxxlcqtijjblnqabgpzryki470k7pyh0gyjg9ypvi=30-03-2024 00:00:00
Hanuman NagarZodiac Developers Private LimitedHomg5w1d1rgrdn49astc4uql24jbvw1c7pwttgvdoee=30-06-2021 00:00:00
Sarthak HeightsSarthak DevelopersRwhagryowucnjpmdnnx8fa==30-11-2019 00:00:00
Moongipa ArcadeMoongipa Realty Private LimitedAfh28bhw6s9foa8o/Ovozkhkc3cjqyoprray3vt4xme=30-12-2023 00:00:00
Divyam HeightsHersh ConstructionRelpj6lpx0/+Xxhgj51i0a==30-12-2031 00:00:00
Redevelopment Of Juhu Shantivan ChslShree Mahavir PropertiesKbfu5uxvuiiewj1u3it6qq==31-03-2019 00:00:00
Liva RocaParinee Shelters Pvt. Ltd.Yapwvipii2ogeisdthcmjfz3dbxg1tny/3Ysgjq3lae0zbq8fptzdftpjmyf84yv30-12-2020 00:00:00
D N Nagar Suryakiran Chs LimitedSai Siddhant DevelopersD. N. Nagar31-03-2018 00:00:00
K M EnterprisesK M EnterprisesZe/Mizggsvb3ub7yqqriqjn12kjcskhvxvxewxalpcnmeqx4hhxck8lrl1jrzluq31-12-2018 00:00:00
Kamla HeritageKamla Landmarc BuildersL0vr/+Qvgckmsmwsfa2wdhughhc3veihcrktbe5h1nm=30-09-2018 00:00:00
Acknurs LagrandeAccanoor AssociatesMumbai Suburban, 40005830-12-2022 00:00:00
D N Nagar Jai Bhavani Chs LtdSai Siddhant Developers40005331-07-2017 00:00:00
Lotus RoyaleArvind Danabhai DesaiLc9czq7igbiwwtyfgodjra==21-09-2022 00:00:00
AadhayaySheth Creators And Harileela Projects Pvt LtdYzuvjx/Chdyxl9rqhbcgla==30-12-2024 00:00:00
AnanyaTryksha Projects Private LimitedP/Ac7cnnsz6vng5atbuepg==30-06-2025 00:00:00
Indian Ocean Wing CCordcon Builders Pvt Ltd400058, Mumbai Suburban31-03-2020 00:00:00
Redevelopment Of State Bank Of India Employees Shree Co-Op Housing Soc LtdOrra Realtors Private LimitedLdhv5os0maxv1/Dgknsiwq==30-12-2021 00:00:00
Kings ApartmentsShree Siddhi Constructions76Uidtcicflinlypcn6k5zf5dgh6t2/9Fqulyqjuq3c=31-12-2018 00:00:00
Nest Wing BSssc Escatics Pvt. Ltd.Iiftfxcc36ptlq1pm9ne2zkuvfrg0h7+E4fvyb/Fd3xyl9kwctwahjodbuf63qqixvbyi1wwx452nlz2qlw+Za==31-03-2020 00:00:00
Thais ResidencyMerchant Constructions Pvt. Ltd.Smoj1qtx77un661zh3qwzml2bbrlzkodkwixoyj/Zsy=31-12-2017 00:00:00
AyanaArmaan Real Estate Private LimitedMfh0jg6/492Zxofeukyo0w==31-12-2025 00:00:00
Aaradhya EvoqMan Infra Contracts LlpOiyxfn1jk/A6o+Pwarc2o20d620z83crl+5Bcq9oabo=30-06-2026 00:00:00
ElenoraParinee Vir Bhuvan Redevelopment Private Limited3Cdyxomq7jxtiszvydsicwpj9cinc2d5rdump7pyo7w=30-09-2026 00:00:00
Juhu AcropolisBharat Realty Venture Private LimitedSogjlvynznj0juqyej6qdg==30-06-2023 00:00:00
Joanita VillaWestin Developers Pvt. LtdBfmdd61vt8fftqcu9+Ejswy7t2h8ca/4Grzf9nwd8zo=30-06-2018 00:00:00
RatnadeepWestin Developers Pvt. LtdP2lxgyda8ptngk6g3rtexw==30-06-2019 00:00:00
Pearl HarmonyChandiwala EnterprisesBhgblndrt0tlydloo1qnda==30-12-2021 00:00:00
Redevelopment Of Juhu Ankur Chs LtdKdi Holdings Pvt. Ltd.Bpqtzn6ley5uwzc1jrxl4a==30-12-2023 00:00:00
Parmatma VillaShrikant Satyanarayan AgarwalAuhakc9een97ndmboqqr5g==31-12-2028 00:00:00
AstoriaAvishkar Keval Kunj Redevelopment Private LimitedQ98wtozpjvjmcsfcksnzuocd/6Vpjxahuuuyngqztfmuu5mncmggutczrjvuhbapcyo/Vzbekvir3bylnm3g4a==31-05-2028 00:00:00
Yura Business Park - Phase 2Yura Business Park Private Limited6Ad87ou5oiquoaqlfm2hjg==31-12-2027 00:00:00
Parshwa Darshan Phase 1Aarsh DevelopersDyseqj4n3g/L72tqanghyw==31-12-2027 00:00:00
Western Heights Phase 2 Commercial 1St And 2Nd FloorAdani Estates Private LimitedFpuscusuattafwobaodyva==30-06-2018 00:00:00
Gurukrupa VyomGurukrupa Realcon Infrabuild LlpYztqlgghzhx97zdaub2qeugnc79jlh5zworiojozhqbzjs6xlxuc05xq/7Eles6t30-11-2024 00:00:00
Rustomjee AshianaFerrum Realtors Private LimitedPppby9vuny/Rmubcu8tnqkqxfydlos99ukpwbgfzyqu=04-02-2027 00:00:00
Mesacon BlissVikram Rashmikant Mehta31-05-2028 00:00:00
AthenaAstrum Developers30-08-2027 00:00:00
SiriusV Hotels Ltd31-12-2029 00:00:00
Notan DcSsd Housing Llp30-09-2029 00:00:00
46 JuhuUrl One LlpEjrceqgs/Pl0eioys+T9dg==30-06-2026 00:00:00
Divyam HeightsHersh ConstructionRelpj6lpx0/+Xxhgj51i0a==30-12-2031 00:00:00
Mesacon Magic CarpetMagic Carpet Co Operative Housing Society Ltd 31-07-2028 00:00:00
Platinum ClassicPlatinumcorp Urban Developers Llp30-06-2029 00:00:00
Project Details
  • Project:
    Ideal Chsl
  • Location:
  • Tr5zaiwejy2u46gkzvpti6lpcbbaqktvi1khoszw5enunnupnahqzjrtclcjep72
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Neumec Infrastructure Llp
  • Phone:
  • Address:
  • B Wing Hubtown Solaris
Project RERA Details
MAHA REARA No: P51800001084
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Rajesh Shah
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 26 Jul 2017
Last Retrived 13 Feb 2026
Ideal Chsl QR Code
Ideal Chsl
MahaRERA - P51800001084
Apartment Details & Configuration
TypeArea
3 BHK102.56 Sq.mts. ( 1104 Sq.ft. )
3 BHK103.12 Sq.mts. ( 1110 Sq.ft. )
3 BHK107.49 Sq.mts. ( 1157 Sq.ft. )
3 BHK107.67 Sq.mts. ( 1159 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ideal Chsllast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Electrical Meter Panel &Amp; Substation
Energy management
Na
Fire Protection And Fire Safety Requirements40% completed
40% Complete
As Per Cfo;S Noc
Fitness Centre80% completed
80% Complete
Fitness Centre
Landscaping & Tree Planting
Tree Planting
Open Parking
2 Numbers
Sewerage (Chamber, Lines, Septic Tank , STP)75% completed
75% Complete
Chambers &Amp; Sewer Lines
Solid Waste Management And Disposal
Na
Storm Water Drains60% completed
60% Complete
As Per Mcgm
Street Lighting
Na
Swimming Pool
Rooftop Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting75% completed
75% Complete
Rain Water Harvesting
Water Supply
As Per Mcgm
Buildings / Wings in Ideal Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ideal Chsl by Neumec Infrastructure Llplast updated on 13 Feb 2026 as per information obtained from MARA RERA.

15048 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
17
Available
7

Saleable Area Statistics (Sq. ft.)

26669 Total
Total
26669
Booked
18918
Available
7752
Total 24 apartments in project. 17 apartments booked. 70% apartments booked.
Total 26669 Sq.ft. saleable area. 18918 saleable area booked.
71% area booked.

Ideal Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ideal ChslDec 2019141113292
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK102.56 Sq.mts. ( 1104 Sq.ft. )11
8 Booked72% Booked
72% Booked
3 BHK103.12 Sq.mts. ( 1110 Sq.ft. )11
7 Booked63% Booked
63% Booked
3 BHK107.49 Sq.mts. ( 1157 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK107.67 Sq.mts. ( 1159 Sq.ft. )1
1 Booked100% Booked
100% Booked
24 total apartments / 17 apartments booked. 70% apartments booked.
Work Description in Building Ideal ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Neumec Infrastructure Llp
for Project
Ideal Chsl
last updated on 13 Feb 2026 as per information obtained from MARA RERA.