Project overview

Immensa G is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700001083. Immensa G is located at Ulzypinepuxvsdxsa/Kmj6vevzusir5rbojh6rcyl8rxdrn4tyyrigb+C+Jvnuqwlyfbf/Th6hr520vxldxfpq==. This is a Ongoing being developed by Agile Real Estate Pvt. Ltd..

Immensa G has TYPES OF 3 BHK, TYPES OF 4 BHK & TYPES OF SHOPS Apartments with carpet areas ranging from 132774 to 81790 Sq.ft. Carpet. The Project has total 167 of which 43 are currently available for sale.

Immensa G is being developed on a total land area of 8966 Sq.ft. Immensa G has 1 Wings / Towers Wing G - Cedar

ProjectDeveloperLocationPossession
Runwal Eirene - Part IRunwal Developers LimitedEt6moopcl5svmaijabqztunbdwcmoroort0cnqdt3i0=30-06-2025 00:00:00
Marigold B WingShree Tirupati Greenfield DevelopersF0l2gdg0p8fw/Nvuuydiptf9gsgybxmv8dnbxngm1bxvehflejuusjv6vbg5wv4t30-12-2022 00:00:00
Sunrise CAgile Real Estate Pvt. Ltd.9Pl8lxqydanfcrh8sl68z8cyjldscvbmpwy9ba1ubrnjukhza2amnzdbwvc2vjn730-12-2023 00:00:00
Sunrise AAgile Real Estate Pvt. Ltd.Itzlm+Jzro/Ly1wejjagxtgxtfqtfmtjp0rhw3zypvlwzqxhuj9zaip4uvaujzm330-12-2023 00:00:00
Elite Platina 19Vijay Associates (Wadhwa)U5i5hhin8z0hbiz5mdbdre+Ita5iznpyfpvlldmjum0=30-12-2021 00:00:00
Pinnacle GloriaKapleshwara Builders And DevelopersN7ucmk0hchgleqnpwyjgj0bv4xn5ciilsnjjrb6ovdc=01-10-2022 00:00:00
Sunrise DAgile Real Estate Pvt. Ltd.9Pl8lxqydanfcrh8sl68z9k7t7zokjzq0us8j80wdipanfmtczfazs/Vtneojuk4z1d6n+57D2ab5kczeogtqq==30-12-2023 00:00:00
Immensa DAgile Real Estate Pvt. Ltd.68Wrydbprf6ybu0snfsj5czve7z6bl0xrjf6wwquwmvoqs/Smwfeac2c8lqzbkixeub8gibc612j5aj8hsykww==30-12-2025 00:00:00
Lodha Amara - Tower 36 37Lodha Developers LimitedMgiknllhn+Yihy5wp/Du+Bxccflg82eaaho557m7mdk=30-12-2022 00:00:00
Lodha Amara - Tower 6, 22Lodha Developers LimitedPxl+Aj9crp5z1jwr7q0dx1bhx+Vf3znbwed5fdvvgflwgqayy/Ibampg7y61hyqn30-01-2024 00:00:00
Sunrise BAgile Real Estate Pvt. Ltd.9Pl8lxqydanfcrh8sl68z8cyjldscvbmpwy9ba1ubrnjukhza2amnzdbwvc2vjn730-12-2023 00:00:00
Immensa EAgile Real Estate Pvt. Ltd.Do3cmywo9xpqetkmxbziuofogt/Kmovsg5jqy9rp++J+Yprzvchcgeg0obwfdzz8dntkks2eg+5S3sejqxgcia==30-12-2025 00:00:00
Sunrise EAgile Real Estate Pvt. Ltd.Qxhjoanmpwpcgv5t/Jn/4Wpryynjtyv/Rwbhync5nbdjht5vpah32itrw9jsdz9ch5hnnekyhp/P1liq4vzxtewqhc+Cqvsmiqk2a45kcv4=30-12-2023 00:00:00
Immensa BAgile Real Estate Pvt. Ltd.Buv9kvcsuth8/Ul+Pbdi8s6m4js+Rbri5x0fpw+Vgngjunkr3rawl7qo/P7dhdubzzbqq3+Hdwls7cvg8zuvrg==30-12-2025 00:00:00
Lodha Amara - Tower 29,31Lodha Developers Limited7Be4hqljntp6ccxqq1710dwziccmisi1yogdjgd5ye+2738Cof9xmkmcuk/B8te0+0Aibyct0v0l/Uxbwnotkq==30-07-2022 00:00:00
Lodha Amara - Tower 32,33Lodha Developers LimitedTj8wir770yf24og++Ug2vttrjvz2xcchfjfipdxp9llmz7wuxo0nzpgbiwceaas+S6mt4ipeq0gfshj2nefk4g==28-08-2022 00:00:00
Immensa AAgile Real Estate Pvt. Ltd./790H6dvzq7snudlqpqicb5uldw4q5alf7kbyvfw1j1dbpxgkc50w6wkl46ygalud2lyfjr3eoh01vm3for1ea==30-12-2025 00:00:00
Immensa CAgile Real Estate Pvt. Ltd.Xwcsognyilot+Azjhce/Oxwtsuf7wwksx833mbistt427tizdhip/Vu/Kpv/Pcx6u13qvl8gubrr3jskr8/Klq==30-12-2025 00:00:00
Lodha Amara - Tower 1 - 5, 7 - 19 Lodha Developers LimitedDa8gjz5/Slilmdhle85so+Ndshsdjtrq8jivt4spzzq6xf1atkinigx0nvvx2osqbyb6ji4tnsfi4g4lqbxegp0f4oplsf1loqi67e1+Scei62iee55pgn82rv53zzmc30-11-2019 00:00:00
Immensa GAgile Real Estate Pvt. Ltd.Ulzypinepuxvsdxsa/Kmj6vevzusir5rbojh6rcyl8rxdrn4tyyrigb+C+Jvnuqwlyfbf/Th6hr520vxldxfpq==30-12-2025 00:00:00
Lodha Kolshet Plot A - Tower KLodha Developers LimitedDf5d9vf0rnmeb0l6kg37sa==30-06-2022 00:00:00
Lodha Kolshet Plot A - Tower JLodha Developers LimitedSfy9o/Kyxfesxjcx3tmejhqf4sf47fwnuj+Fgyzbvia=30-12-2022 00:00:00
Dosti Westcounty- Phase 2- Dosti CedarDosti EnterprisesNk8tfgikqfhqoyes0mhvqmd7ofcddicijlpfzmnhk1b5hgs1qnp06wnnt9okiesd8heloonzft+5Ze1rcmgfyzjnq5prwtkob8gyqk0mnawz5jpfzmtpbmmk2gft2xwhvlpimjqiv9catbajvjwisg==30-12-2023 00:00:00
Immensa FAgile Real Estate Pvt. Ltd.Dwllwpnjczeb6axbokivtnr30/Uk7kl0rn2yf8fu+I2jiceb6ks5xvflwvmcmwr430-12-2025 00:00:00
Immensa HAgile Real Estate Pvt. Ltd.5Bhxvjdabvrfiqsby2zffrwhvazxvoozn99y3awm3ftzg3g8nnjoe1r21fyfuxti30-12-2025 00:00:00
Dosti Westcounty-Phase 3-Dosti WestwoodDosti EnterprisesHl2avmvnqd7v3yquqbxl6tdmauoyk0+Jzkynnficsyoipslevkvv0mcdzyefw6un30-12-2026 00:00:00
Lodha Supremus - Thane, KolshetLodha Developers LimitedZpp7hkl5odw8tkh/Bqrh828bpagrwway8qg66c3x13q/Bug51n2qgllmcxrmmukz31-07-2022 00:00:00
The Icon Phase 1Leading Frontier Private LimitedNx/5Nu7isjmdomegkwrzgtnczkri6gs/Mvb8csenfgb7uj5u9drmbiflbesy3qgnwz90gr3e0opfd1n53usfothkjp+Evdhts7dquoiuvssy/Aim0oowsbnomohtypgakiwzqxlnil/Ndw5t5c1xlq==30-12-2022 00:00:00
Highland Springs B4- E WingSiddhi Real Estate Developers4649T3wayjozbf7wada/Dcvntis/Ycduqjcwwb4rmpg=31-10-2019 00:00:00
Sector 5 - Wing CAgile Real Estate Pvt. Ltd.L6bgfdqia0wdzlwmbh0dw4zepcgrdtbgzyhutjxjnti0e0ddkph3vhiu3g9wzdnbwb7v+Bsoxttxkbrnql9vkul5sb0bxvk73skonnhgaaq=30-12-2027 00:00:00
Sector 5 - Wing AAgile Real Estate Pvt. Ltd.Wnikyjm6da2oypycsdbfntascvyfm6mwmsiy4xbwjv6cf/Yaw6ilh4w1pjmt+Czbqory+Ewvxg3zidapv3opyxrm7fthylxzjjvebcryjty=30-12-2027 00:00:00
Sector 5 - Wing BAgile Real Estate Pvt. Ltd.Oxtenculzptskstxjorib+Iyjdcnsast877uag2cdasqamlw5wxzf4vj46g8ytak/Cmfd+Mow7wozpomlyogvncoup2sfhmlk0/Ecdic0ve=30-12-2027 00:00:00
Y SquareShree Mallinath Enterprise LlpQmfaoxe3owblicwimwszry388oivo7sykc8xhgdjeqcnyvz5cay14bbnpukx8yaium/Fah9lmzg6hwemouinuwhjmafgjivnqrtxvos5qg8xq4v+Qqcodxj0ov5kvesecyxrhjx1n+Cxwv12i3wkjdmkdzqmltwr1jtifjux0jaexhjsa7ixtqtnrim0kz2w2kysc3d8c86wrrzbmmdeax/8Dbhr7leb/Imulcsq3z1wbssr7wxpqw1lpp0j/Nrremapgx2zbfcskpjoptdnqpmpbeooyzlmhloi0/Iysyy=28-02-2025 00:00:00
Devashree ParkRamesh SawantM8h/Hjtxeuebhgi5pvw9srhbcs3orxuywtosah43cmm6dcz1yz8sg+0Vuljkvxzobwy4cjut7zhz9aykguifftqyozjj5zozh9v8gw2wmstcnkvk8w+Kljc1+/Oeqayo25zljvypodfld5l2ditnaq==30-03-2022 00:00:00
Pride Palms Majesty A1-B1 Phase 1Larkins RealtorsQdyfx8aemvnp3vnrbfxmr4ploev8fnlmmd2x2k11lfa=31-12-2018 00:00:00
Dosti West County - Dosti OakDosti EnterprisesBtkfnxu2hkbzwcymuzzh3uadk4y6oewz9h1pdh8clk9tp+Cv4ttsae3rg1rz50ontlihwrp5bfwabnwpwf5o6paulqedujrvswxp16bbdp/Okzsmtrfkpfh1ojoplfuf30-06-2022 00:00:00
The HeliosRaj Laxmi Developers+Uxtogdr/5Ki9bu4k5wdftdjjfyfwi5ujnlxqvymdo7fcrlflsgxsloee609klhi31-12-2022 00:00:00
Terraform ArcadeMoney Magnum ConstructionsVeghf8fmg0bfngadpuu1/Bmyv34pplo25u9rb/Nsuticypigjnehfnpap2eepyalj6rarq11hyqt5hxbk76cw/08Psz/Lcdqybxji+Mibso=31-07-2022 00:00:00
Sector 5 - Wing D, E And FAgile Real Estate Pvt. Ltd.7Omzd7ewm4vwfww2eedfy98ju2scafuebk/Jl+Skoztsajf0wue3ch3qzfrmia3ksaex/706Zlmeswk8ljcpjxuvna2pzclv7/7K5lf3f/Q0lbcorgntyih+Bxwr6uzwwq+R30mc6/Hkto5rwlyb2q==30-12-2027 00:00:00
Shree Sai Jalaram Builders And DevelopersShree Sai Jalaram Builders & DevelopersGjayuoblytkuwnmhe3u7oa==31-12-2018 00:00:00
Elite Solitaire 15Vijay Associates (Wadhwa)U5i5hhin8z0hbiz5mdbdrwww5guw3bdxktrgtea8mri=30-12-2021 00:00:00
Pride Palms Queens B2 Phase 3Larkins RealtorsDky29qumwny5uskbe4w/Udheoszb6nz4xzldaas0/Bk=30-12-2021 00:00:00
Pride Palms Queens A2 Phase 2Larkins RealtorsDky29qumwny5uskbe4w/Uhanljzgsfqtcbyrvpwvqg4=30-12-2021 00:00:00
Terraform K - ResidencesMoney Magnum ConstructionsU3/D1f1svx97lne2qcyceo3ubclir2in2n5ykgksaifomdlx7wdd2qccus0gztlsrijpmvrfttj4/Wcmnomppp6mw6hv84nwp0ahbgiwmgy=30-09-2023 00:00:00
Forestville - Phase 1Oberoi Realty Limited8Iikk3fhfilde1o+Qjgzlg==31-12-2029 00:00:00
Pioneer Park 2Shubham Enterprises400607, Thane31-03-2019 00:00:00
Ashok GardensShree Saibaba Construction Co31-12-2030 00:00:00
Sector B- Tower A and BAGILE REAL ESTATE DEV PRIVATE LIMITED31-12-2031 00:00:00
Elite Solitaire 16Vijay Associates (Wadhwa)U5i5hhin8z0hbiz5mdbdrwww5guw3bdxktrgtea8mri=30-12-2021 00:00:00
The Icon Phase 2Leading Frontier Private Limited61/2B30-06-2026 00:00:00
The Icon Phase 3Leading Frontier Private LimitedK1ymz3dejkmsvnsy8laiszp8ebwwmq18mxyvbwagx17nfp0oabn061prv7keuo6a31-12-2026 00:00:00
Sector 5 - Wing J And KAgile Real Estate Pvt. Ltd.Niwdkh4xm99pp/V0evfrvhwiaffnxc9msoznny1or96xnm8tbkapife4cgq0rjckfuotjgzfeprq3uf+P2vxkueaz72isn1swyhmihao76m=30-12-2027 00:00:00
Elanor - Tower 2Lodha Developers LimitedEec0ub28w6a859h8ma1yvw==28-02-2029 00:00:00
Godrej Ascend Phase 2Godrej Properties LimitedJxn68epqrvqyaqvh2jvfi3az7svderrywznx/Jngcmu=31-12-2028 00:00:00
Godrej Ascend Phase 1Godrej Properties LimitedHkxom5eh6ww8youl43nyhm6dzmu/M4svvxcbtka1r7m=30-04-2028 00:00:00
Lodha Amara - Tower 20, 21Lodha Developers LimitedZntyjs+Byuxwezxfo0htfw==30-09-2023 00:00:00
Godrej Ascend Phase 4Godrej Properties LimitedMuo9s/A4wdapsf5lturkqxg+Lj7xugrmc72nldlvz84=31-12-2029 00:00:00
Project Details
  • Project:
    Immensa G
  • Location:
  • Ulzypinepuxvsdxsa/Kmj6vevzusir5rbojh6rcyl8rxdrn4tyyrigb+C+Jvnuqwlyfbf/Th6hr520vxldxfpq==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Agile Real Estate Pvt. Ltd.
  • Phone:
  • Address:
  • Kalpataru Synergy
Project RERA Details
MAHA REARA No: P51700001083
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2025
Revised Possession 30 Dec 2025
Extended Possession
Litigations No Litigations
Last Modified 20 May 2024
Last Retrived 13 Feb 2026
Immensa G QR Code
Immensa G
MahaRERA - P51700001083
Apartment Details & Configuration
TypeArea
TYPES OF 3 BHK7598.48 Sq.mts. ( 81790 Sq.ft. )
TYPES OF 4 BHK12335.04 Sq.mts. ( 132774 Sq.ft. )
TYPES OF SHOPS398.53 Sq.mts. ( 4290 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Immensa Glast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
1 No. of Common Basement96% completed
96% Complete
Common Development As Per Afs
4 Nos. of Common Podiums70% completed
70% Complete
Common Development As Per Afs
Aggregate area of recreational Open Space50% completed
50% Complete
6253 Sq Mt Common Rg As Per Afs
Club house, fitness centers, swimming pool & other recreation areas31% completed
31% Complete
Common Amenities As Per Afs
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Electrical Meter Room And Sub Station Only
Energy management50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Fire Protection And Fire Safety Requirements50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Landscaping & Tree Planting50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)72% completed
72% Complete
Stp Only
Solid Waste Management And Disposal50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Storm Water Drains50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Street Lighting50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Water Conservation, Rain water Harvesting50% completed
50% Complete
To Be Done Before Completion Of Whole Project
Water Supply50% completed
50% Complete
Water Supply From Local Authority
Buildings / Wings in Immensa G
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Immensa G by Agile Real Estate Pvt. Ltd.last updated on 13 Feb 2026 as per information obtained from MARA RERA.

8966 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

167 apartments in total
Total
167
Booked
124
Available
43

Saleable Area Statistics (Sq. ft.)

17399118 Total
Total
17399118
Booked
12640197
Available
4758921
Total 167 apartments in project. 124 apartments booked. 74% apartments booked.
Total 17399118 Sq.ft. saleable area. 12640197 saleable area booked.
73% area booked.

Wing G - Cedar

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing G - CedarDec 20254411140687
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
TYPES OF 3 BHK7598.48 Sq.mts. ( 81790 Sq.ft. )76
75 Booked98% Booked
98% Booked
TYPES OF 4 BHK12335.04 Sq.mts. ( 132774 Sq.ft. )84
49 Booked58% Booked
58% Booked
TYPES OF SHOPS398.53 Sq.mts. ( 4290 Sq.ft. )7
None Booked0% Booked
0% Booked
167 total apartments / 124 apartments booked. 74% apartments booked.
Work Description in Building Wing G - CedarCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress62% done
62% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress22% done
22% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress22% done
22% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress64% done
64% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress38% done
38% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress58% done
58% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Agile Real Estate Pvt. Ltd.
for Project
Immensa G
last updated on 13 Feb 2026 as per information obtained from MARA RERA.