Project overview

Imperial Heights Phase I - A And B Wing is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006296. Imperial Heights Phase I - A And B Wing is located at B/Tp1kqtgsfherzxnldm1a==. This is a Ongoing being developed by Akshar Shanti Realtors Private Limited.

Imperial Heights Phase I - A And B Wing has 1 BHK & 2 BHK Apartments with carpet areas ranging from 385 to 535 Sq.ft. Carpet. The Project has total 302 of which 30 are currently available for sale.

Imperial Heights Phase I - A And B Wing is being developed on a total land area of 108609 Sq.ft. out of which 10243 Sq.ft. i.e 9% is reserved for recreational purposes. Imperial Heights Phase I - A And B Wing has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Shraddha HeightsShraddha ConstructionsKzu31ovr0mrgqmcc01ou1uif8s5ch7uwmy7vn4xr64ygkb3ab3bc4kmr/N+W75uv30-04-2018 00:00:00
Imperial HeightsSkheights Pvt Ltd9Ublktz2temt6wojhlxkjdfosiuw2bcigfj2cx50+Wz+Jiqcjc6cx2mu7l7rcdic2mtjp9tugqfsvehh6mk3o8g/P76ga2jesypizraszxdueoawzcjfvfsp6p5lrw4n30-09-2020 00:00:00
Gaurav CrestRavi DevelopmentsAtdz54ppxyftliqcmoonia==30-12-2023 00:00:00
Tower E To I On Cts No 104Pt, 106Pt, 224/1A, 224/1B In Village Ghodbunder, Mira RoadRna Corp Pvt. LtdKpfc+G9jphjxgd5gtw8xml3oek8asuccovpdwlyes+Avnrej2s3fxa0xchpvlhei/297Zr88fzkgcf4cz503jhkvvs3cewhdalisdnvp+Zs=31-07-2019 00:00:00
Sagar AccordM/ S. S A RealtyThane30-12-2021 00:00:00
Usha Kiran HeightsSai Sparsh DevelopersNear Vinayak Temple30-12-2022 00:00:00
Heeru SadanHemant JainThane, 40110101-09-2018 00:00:00
Mini MarketHemant S Jain97Kw7wrnaxxjhkzusa209dycmf9lusp6kzkce8oqsgsdzhzldiwdgr/Dyn2usgmp31-12-2018 00:00:00
Skywards RegencySkywards Vision DevelopersBpgx7ujqrcwiibmbujbg6+Iookvzs8q9jaywrqbrz3a=30-06-2020 00:00:00
PinnacoloSkd Realty LlpOgous1it2kmfp9ztjpaglifubpbtcqcjapp62v8gvgeew5stzwnurnppqfdce/Dkhrnokd5i6hdb/7Lyvgyagx858runwuxqh5xbpxjwnsbxxjdtstggq1qy7qdknoul25aaxjcwa7x85q1yu18cxg==30-06-2018 00:00:00
Tower A To D On Cts No 104Pt, 106Pt, 224/1A, 224/1B In Village Ghodbunder, Mira Road Rna Corp Pvt. LtdEgvz4y9d6ivuyzpqjzpn1djpcfjqjkkxwomnwrfrffcgvbulidoij5k98ygj6rme5ezmgbdntpbboiggh84wxgluag8nrgobsw8+4Vstu1w=31-07-2018 00:00:00
Balaji HeightsShree Balaji RealityQl/A1xjblxmgkjqwodzanbkr8yzh+Wh0z01fmeh73t4=30-04-2018 00:00:00
Anand Park D WingR K DevelopmentTfoksoijxs/Mhyyaozgeshkcv5uljd7fp81etsb29ogif88cez8oft6u+6L4vx+J31-07-2018 00:00:00
Mahadev TowerNandkumar Mahadev Patil4J76v98ojzqbyyterkjeimyzhbbd2b6yuanntxnqmhs=31-07-2022 00:00:00
Natwar House Co-Op Hsg Soc LtdPadamavati Builders And Infrastructures401105, Thane31-12-2019 00:00:00
Jay Vanadana Chs LtdDayanand Sanjeev Shetty+Xxtawzkhfggj74wtw7gkg==30-09-2020 00:00:00
Rassaz Greens Tower C D And ERassaz Infrastructure Private LimitedHkm0d5dh50q1c+Wytgcho4xqxwt0387xwntpxxlncmlxy+2Qjivyqgx8snduio6la2ej9c7gtaixgjg23rsj+Cng9thg1xp+Carg3aeo428rbsnny+Delyiez2rk78loijvijy0za6hh2ll5lukdpw==01-12-2026 00:00:00
Savaliya AvenueShree Savaliya Housing LlpPx44hvrl96axuvuynxjreszxrjoyhvwqvdymoxnv+1Y6kbh0kjmqqb4mnmdaaiof30-12-2023 00:00:00
Ostwal PointShree Ostwal Builders LtdMhgplglx9maiyemhkgilwyc7gqaxiyzhr7rvpzqosuz2iccqkehmo1vqeu367jap31-12-2018 00:00:00
Pratham HeightsPratham InfrastructureYy4elb3ixkc6cszse0i0ow==31-12-2017 00:00:00
Rassaz GreensRais AhmadS8cqmnmeff/X5qf7a3fx3ldoqcvxr7mu1xorj8f9deu=31-12-2019 00:00:00
Shree PanchamShree Pancham Associates05Yev7lm5lhherpxgyjqnjnjs6uotmcnvv2w1xwue7aealxyz2+Jeoodhx8u3waptljvr/5Josb4p4r8fykdgdlknahekoni1okwt9hjurndn7jyj2ecjfrfwc7xxip830-06-2018 00:00:00
Raviraj SpringM/S Raviraj Housing (Prince City)Fokxa4mtgdyh2nk+Ihjciw==15-12-2018 00:00:00
N G Silver SpringRna Builders (Ng)Z+Moztoc1y+Dvnqsubha0q==15-12-2018 00:00:00
Annapurna JyotiAnnapurna AssociatesU7lxa9tfw2/I8thiy7tekq==30-12-2021 00:00:00
Bhau Padmann ApartmentGujarat Land DevelopersOnl7cpgfdli90zkr4u24nk7pztxdcgt3d8vjdvnfqalgqthdsx6zbku7g55tpfmck5fzg5tcrej1kbyqyw1lrrs/Bleb+Guhju4kujd8+Fi=31-12-2019 00:00:00
Tirupati HeightsM/S Shri Tirupati RealtyYa/K/5Yt33fweyfulahgpdkonrlen+Vfeangm2fvefp+Oln3wg3ksyw/Trjnvfdk30-12-2022 00:00:00
ArcadiaJangid PropertiesV3dmec+Z+1Fjhg4syfjj8l05evp+Swptkbojemqg5py+Aiyg1wm9wcbsvzw+1Pj330-04-2018 00:00:00
12Th AvenueSadguru Baba Developers LlpMira Road31-12-2021 00:00:00
BhargavR N EnterprisesUlwwxewqc587zfjty1fz2g==31-12-2019 00:00:00
Mangal Pushp HeightsSunil Mangilal JainDruzpgeq6uyfjvcdso2pe56jm1/Mrcu7exsi3rtvcn3vef09uvijjyv6mk8huuxowy2npzrh+Csp79qi71qc2g==30-12-2023 00:00:00
Ideal ParkIdeal Builder & Developers8Tsymdhynlm8abkf4os71a==15-08-2019 00:00:00
Urban Grandeur Bldg-2Cllaro Enterprises LlpJ4rct3naqwo64st9jgih74jdzs8hkxlbbuobalgnviyzxt8h/Pwa0icbbpfwiy6n30-06-2027 00:00:00
Winstone Building Type - EPnk ConstructionEx0pei0hkzg3lrnex/Wjrw==31-12-2026 00:00:00
Poonam Estate Mhada Bldg No 8 And 9Ravi DevelopmentsGch/Ca1eheaj7eai5g52ox4s1bs3efpuf3hnbtmge46z18ilchq6ngwkxbn9snv+Jpgdaovuq27fifermuil4svymzhayvt45lyukvwyrwnvdc2o/2B1yqnp1nw/9G7t31-12-2017 00:00:00
Sea Green Apartment Aakash Builders & DevelopersDryqfswigx0+Swqjwh7a8iqsosr8wygmz8bx/14J8ue=31-12-2019 00:00:00
Raj Heritage 2Raj Realty Builders & Developers Private LimitedQblybqgegxxrpi8yeudn/Ac30q698vdvzc+T5u9kielma4jvw7t/Miqu49rhk/Kahznczp34nwnpz+3Wvzvdy6qkk8yzg+Wvnuopjbeqwgs31zkxpgni0dolpx02et8wviudlbmuz2ygzkjbqagg7w==31-03-2026 00:00:00
Sai Anand PlazaShree Sai DevelopersIudaz6wadpwy2qvtxoho7eefaoz2imfojxl4m4grjopfdfsvco/9A21uzckd4epi31-12-2023 00:00:00
MahadevshreeM.M.Construction2Yqkiz7cg1ee/Ymt+Ooszg6mgoc+Klo2rddyjo0bqvg=31-01-2021 00:00:00
Sai PlazaShree Sai Shakti DevelopersP2modrjs7q/Bx6b/Tsy0atj3nq/Kses6sb1pnpp4geu0owvrj87sgt/Qujiurdfr30-12-2023 00:00:00
Sector Vi/E-6Shantistar Builders6L1mtri2hj90r1f7isddqgdeu+Q0oswl6eivo0khora=30-09-2020 00:00:00
Jyoti BreezeVenkatesh Construction4Vr6sv6dujmvdw2fg35zkq==30-12-2023 00:00:00
Raj OaksRaj Corporation+Kkq1rgzwklfbnqocdu4ghged733ps6l00vhajvtrfg=31-12-2019 00:00:00
Ostwal Orchid Building No. 9 To 12Asha EnterprisesRqozgucqbst4fydo3y/Zg86nugiuuv4rkmi1lal6ecrexawyri0qag7hninsoxpti9jtapvcyhgnytumhynh8/Shm5zlmtswdf3v5opsr8iiznch1eyglnwnw43g6rks30-12-2023 00:00:00
Shree Kamakhya ChambersShriprakash Vijaynath Rai2Wdypdks7ovrj0qk/Zje6uydyotgl2h+Gqs7ab98bsc=30-03-2022 00:00:00
Shreedham ExcellencyShreedham Construction Private Limited0Hs+C6xap/7Vx53mukkch7hn1kvzy4lrqi3t0697mbbbw+Spprbhk6nblt2jlbuk30-12-2022 00:00:00
Skyline-Ii-MhadaUnique Shanti Neminath Developers LlpLge5t5jt3twuk3x3rkkmt5gabzj2brcpzjz8lnv2/Ikklbrahtfe9r3xrsip5z9ocrwkequpzoq1yhkrk700ta==31-03-2018 00:00:00
Shree Ambesh Complex And Ambesh BhavanShree Ambesh ConstructionThane, 40110531-07-2020 00:00:00
Laxmi HeightsLaxmi AssociatesFwqmg3q1qt61y+Swihbdz1gh1qznha/Fm1j6t6i4hanv996q5xxaivkelqfdto/3Eed8nidwm6sfrwgax0cqww==30-12-2023 00:00:00
Mayfair PalmeiraMayfair Maru DevelopersG13lw5a+Wu4a+Q17vz2ayupxuxy96pmncleiafhvp6hruyvp/Dvnucz8q/Vhnxsnmmp1jiymbcv4ncbjrzo8nlv+M8jhik3w0sdnk6cz6d4=30-12-2028 00:00:00
Deepak ApartmentSilver & Rashi ConstructionsAcmmwizwoox9jqdctdwfl5uv6jq3lgdothp2rfdyulc=25-12-2018 00:00:00
Shreenath AvenueShreenath Enterprises9P2v693to913kqdgn91n+A==31-03-2018 00:00:00
Walchand Nagar - 2Prakash Hamirmal JainVelbb968nmwhyl+Onvs/Fps+Nlpbonyoj0skdcezaje=30-04-2018 00:00:00
IndrayaniJangid DevelopersFcjbwbnigblwdeltx94wu/9Hklmrucvyvq9h3xhf1ae=30-06-2019 00:00:00
Shubham GardenShubham Drashti EnterprisesLsuagmisa//9V9sdwqbrosgmaz9k72qhnuweizugqce=30-04-2022 00:00:00
Raj EnclaveRatna Priya BuildersAa+J34iokhpoaxnpnes4qrnatojlonqziqdzvwhsh7g/Erh0g8vcayf77havgybp30-12-2022 00:00:00
Keystone ClassicKeystone Classic401107, Thane30-04-2020 00:00:00
Shalom JoveCottadiyil EnterprisesLpidbgilcrbhodfy2z3or+M8h5rz7w1kghwj3ahyksvnhzyxi02pttvmgykwobawydo+Ihzdbspqkchwj2imjcfdkmhl/Nohvynsv2sxeb4=31-12-2018 00:00:00
N G Tivoli Phase IRna Builders (Ng)6Mvgemadb4+1Nxcaqct2x9ahd2u4jqpenz1u/W6ercfhladxsba41r2s5wcnxnxg30-12-2022 00:00:00
Leela ApartmentShubham Builders And Developers3Memzdhbadinvi0ajlpn6en4sscvwknjabziihzgkrzpeko6/Gotqb+9Raslzlaa30-12-2022 00:00:00
SapphireJangid Builders Private LimitedNh3ttowbkhcsikjyzzzgca==31-12-2019 00:00:00
Raj Heritage 1Raj Realty Builders And Developers Private LimitedKeckw2v4zxxyt4dmwrkqh25ifhgtxoa4qkdanqakc78dcyyewocvwcxg0oly/84Kqbb0lcqec9qydry2fotivwq0kvkw/4Oekfh6ne/Pertmxot07clklmdv8ltqwy9j30-12-2023 00:00:00
SAVALIYA RESIDENCYShree Savaliya Housing LLP/Old Survey No 475/, New Survey No 118/230-06-2025 00:00:00
VASUDEV SKY HIGHSHREE PRATHAMESH DEVELOPERSno 304/2 New Sno 177/230-06-2026 00:00:00
N G Diamond Hill A Phase IiiRna Builders (Ng)Zrtcgkhrr4ekyij15bwq+Q==31-12-2024 00:00:00
Sheetal Complex Wing D EAbhay Builders401107, Thane05-08-2018 00:00:00
Lodha Mira Road Project 1Lodha Developers LimitedOfbak1rfqsfs9xg9ai/Rsn3li+Ii/Ky/Tyvb60anjjm=28-11-2022 00:00:00
Ruheena AppartmentSairajdevelop401104, Thane31-12-2020 00:00:00
Poonam SquareRohit Devendra GoyalJ/8Emmqs+C07hx8h34x+Aq==30-12-2021 00:00:00
The Address Building No.7/8/9Strawberry Constructions Pvt. Ltd.Fw1fuc3156e3+U6yfw+Jy+0Zowcrfrusoxcwlwmdmzehe582t14ckjysm9vdl7uegizn44makom7dh6gcg9gwspfpsfcnmh3htk3jh2lvlovkxfb8npqanoxbl/Jlj6s0z1jrkcfalmhwo5mkpxt1g==30-06-2021 00:00:00
Ritu RayyanRitu Infrastructure Pvt LtdWkmgbpgwu7k0aon/4Jon04mtbszlrhct2jiv4xtke4y=30-12-2021 00:00:00
Shanti OneShantistar Builders40110731-12-2019 00:00:00
The Address Building No.5Strawberry Constructions Pvt. Ltd.Fw1fuc3156e3+U6yfw+Jy+0Zowcrfrusoxcwlwmdmzfl4sh7o/Fd2cpfgjqtft22xurjeuiy+Md6xocnwumlxmfddgbzj53enkec/Rrjzleeosfqgivjur4q9o9qwgvxii6/Aszbbbunmryyvfwesg==30-12-2022 00:00:00
Raviraj SpringMira Housing Development CorporationFokxa4mtgdyh2nk+Ihjciw==15-12-2018 00:00:00
Skyline-IiUnique Shanti Neminath Developers LlpKzlixissh/Wlto17wslpramnrfluuk2uswtmozhx2kityw1eoqqtwkwoj3sxmh2bq9cynwih86vkcl0s/Ezluiuahi+Hhpzexypqcdhpsyg=30-06-2018 00:00:00
Jeevan Asha HeightsNirmiti ConstructionsC/6Oilxjzvdjrcwl935anxs5xacspykhjr6yme7gaya=30-12-2021 00:00:00
Borivali Yash Prabha Chs LtdUnique Shanti Developers LlpVsnqdqpvtngy3m6e78d/Mat3pks/Zyw3rvv8jdh51ni=30-12-2020 00:00:00
Vasudev Sky HighShree Prathamesh DeveloperP4jrxkkiua2g8dq91wk9vz3uhxrbor/+Sf439pg+Nkfbbapp4hxdt2q+Ex2g2yxn30-06-2019 00:00:00
V. M. HeightsSwayam DevelopersThane, 40110731-12-2018 00:00:00
THE HYDE PARKARISTONE BUILDERSOld Sno 422, New Sno 103, Hno 2, Old Sno 424, New Sno 104, Hno 3 And 4, Old Sno 425, New Sno 10031-12-2029 00:00:00
Benevolent Mb HeightsBenevolent M.B Constructions Pvt LtdXdpwfnb2yc7od6ki6yptvbajqgufcsqu6mvex4af8nwrtqgsfqof7qwcirfghg3631-12-2027 00:00:00
Unique Orbit-IUnique Shanti RealtorsLgrouzlmrulk7n2k1vzb7+Vfka4x2rrzjrfqncbz5i1fw0oux4ey8g6fx1slehdelofzairhspkdzdvbcdfa8a==30-12-2020 00:00:00
YashshantiSiddhivinayak DevelopersFzjvh0ym3bsktssl2wulw74qq8xvxsnn+Fyyvumo2lu=18-10-2018 00:00:00
Arihant PlazaArihant DevelopersIf7ffrfmgqzqsa6fnpkuodeuvgrtvujzz0se0vcksqy=31-12-2019 00:00:00
Imperial Heights Phase I - A And B WingAkshar Shanti Realtors Private LimitedB/Tp1kqtgsfherzxnldm1a==30-12-2024 00:00:00
Prithvi SnehPrithvi Buildworth Constructions401107, Thane31-12-2025 00:00:00
Kakad Paradise Phase 2Kakad Housing CorporationLld1lq+Jgywd8owlbq/Kyvrpwrrpylp7bnafto6pp+Fsbbn4sngeyczuy1ra6iulhwuosgf9debijuepe6hwnmejpwweghj6zig3fvhfv997qlpqmvqlto1njfwxgkbt30-06-2024 00:00:00
N G Diamond Hill C Phase IvRna Builders (Ng)Navghar31-12-2024 00:00:00
FLORENTIASIDDHIVINAYAK HOMES PVT. LTD.Survey No 27/7, 3A, 3B, Survey No 41/530-12-2022 00:00:00
Unique Aurum-IiUnique Shanti Developers Llp6Clum6t8j4brge8pxzps6izpwq1oarkek0gv/Gfujusjxzwdtszv/4Qxuav4h3ir30-09-2018 00:00:00
Venkatesh Jyot Bldg No 5Shree Balaji Builders And DevelopersSw+7Sryw4vhtpywgprdwumjpbgtpdfkftvjd2jzdv5p5cme7syiiqczrcgq8vgjhigtufv+Wsm9d3ijohtafqstlwujssiswwaiviai6pwm=30-12-2021 00:00:00
Golden City ComplexShree J.P. BuildersFuhl+Gacjc/Esfwjexlrtkmzym5vz5xmbp0ykx7hoe8=30-12-2021 00:00:00
Sunder Angan Phase IiSunder Angan Developers8+Ffmsdnljtdddgbegi7dq==30-12-2021 00:00:00
Sadguru Complex Bldg No 9Sadguru BuildersAkbyr4wv7xehslyyrkazmmxp9iswoq/Fythmi+/Jxly=30-12-2028 00:00:00
Ostwal Paradise Building No.9 Wing A - B - CShree Ostwal Builders LtdOzspsbraj8iokpxjazay+Tgicyli/Y4zro2wifxkfsbh6duj31ucca+Tdfwrp87vzw+U1ts7kg8gb/Cepb0krir5w8ocwj+Yz6/S+Jcffq0=31-12-2028 00:00:00
Ambrosia And AsterJangid PropertiesNgnpn1us4r2icf1wjwcft0ebigwfdexq852sulij8xg=30-04-2019 00:00:00
Gaurav EnclaveRavi Developments401107, Thane31-12-2021 00:00:00
Siddhachal ResidencyHitech Developers35Csb7o4/Nmi9mysbw6nmg==31-08-2019 00:00:00
Oak Leaf TowersAxis Housing Private LimitedThlkni3n6ctodqdoxqywnraxxr3b+Fzt1jl74ng7uqrlcprwdnyxawfedwp5lfir31-12-2030 00:00:00
DeveshOm Construction CoMaop262i+Kn8min+Op2cz3ob2o7xjmyicixcylhnvnsm9g03teabgiknbnkqlif128-08-2023 00:00:00
Dev RatnaSdc Developers Private LimitedDzewm0jjwwlglwea7w8kkalf/Wbk2eyu6u0r8jdh+Go=31-12-2019 00:00:00
New Prakash Apartment ChsJasmine RealtyFltlarozpjqpessxtbhcsez3caab895fudifqt5wi24dht55okfuih6rrnp7ekoacwn+Sqapjjy2og2qrpgy7/Rcy0sqtj8kapg1biejxbo=31-12-2019 00:00:00
Rashmi SignatureHemendra Bosmiya40110730-12-2017 00:00:00
Shree Shashwat Bldg20Uday Ghanshyam NaikMccaliipdfbcsje/Rnk88wqgd91jxcnbirpnl3ncrno=30-06-2021 00:00:00
Venkatesh Kumkum Bldg No 10Shree Balaji Builders And DevelopersSw+7Sryw4vhtpywgprdwumjpbgtpdfkftvjd2jzdv5p5cme7syiiqczrcgq8vgjhigtufv+Wsm9d3ijohtafqcnh5rs9elibp7xck8ulsjq=30-12-2023 00:00:00
Raj Legacy Satyam A And B Raj Realtors30-05-2031 00:00:00
Sunteck Times SquareSunteck Lifespace Private Limited2Lwnelxq6ehurewbf0xd8hat1knyysqm0gotlnhyx9t9qxymh1rnwp7v7rg/Gbrm31-12-2027 00:00:00
Walchand ParadisePramanik Housing Private Limited/29+Ivbd3w6sn5qeqwl73nwf/2W/Cujivmu+K9b+Dqw=31-12-2025 00:00:00
TULSI AANGANOM BUILDCON INFRASTRUCTURES PRIVATE LIMITEDPlot No 3030-03-2023 00:00:00
Panchvati HeightsMunish Reality40110530-05-2023 00:00:00
N G Hill CrestRna Builders (Ng)Navghar30-12-2022 00:00:00
N G Diamond Hill D Phase IiRna Builders (Ng)Navghar30-12-2022 00:00:00
Sky HeightsBalaji Realty LlpGvunvh+Ext/Dttqlsvwfs/Ncmiqms+Dlsxogyfleskhfl+5Fqsi2yfo1k5bpt3+Sev0dirzu5+Ige2gkowf2t2fwbvgewh8ssldjqiqtckq=31-12-2029 00:00:00
Sheetal UtsavDgs Township Pvt Ltd31-12-2030 00:00:00
SHUBHARAMBHUNIQUE SHANTI CONSTRUCTION LLPShubharambh30-09-2028 00:00:00
Project Details
  • Project:
    Imperial Heights Phase I - A And B Wing
  • Location:
  • B/Tp1kqtgsfherzxnldm1a==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Akshar Shanti Realtors Private Limited
  • Phone:
  • Address:
  • Asmita Super Market Building
Project RERA Details
MAHA REARA No: P51700006296
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Avinash Mhatre And Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession 30 Dec 2025
Litigations No Litigations
Last Modified 20 Aug 2024
Last Retrived 13 Feb 2026
Imperial Heights Phase I - A And B Wing QR Code
Imperial Heights Phase I - A And B Wing
MahaRERA - P51700006296
Apartment Details & Configuration
TypeArea
1 BHK35.74 Sq.mts. ( 385 Sq.ft. )
2 BHK49.74 Sq.mts. ( 535 Sq.ft. )
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )
2 BHK49.64 Sq.mts. ( 534 Sq.ft. )
2 BHK49.73 Sq.mts. ( 535 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Imperial Heights Phase I - A And B Winglast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Done Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Will Be Done Prior To Oc
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Will Be Done Prior To Oc
Landscaping & Tree Planting50% completed
50% Complete
Will Be Done Prior To Oc
Open Parking
Will Be Done Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Will Be Done Prior To Oc
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Will Be Done Prior To Oc
Street Lighting100% completed
95% Complete
Will Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Prior To Oc
Water Supply50% completed
50% Complete
Will Be Done Prior To Oc
Buildings / Wings in Imperial Heights Phase I - A And B Wing
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Imperial Heights Phase I - A And B Wing by Akshar Shanti Realtors Private Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

108609 Sq. ft.

Project Area

10243 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

302 apartments in total
Total
302
Booked
272
Available
30

Saleable Area Statistics (Sq. ft.)

136402 Total
Total
136402
Booked
123191
Available
13212
Total 302 apartments in project. 272 apartments booked. 90% apartments booked.
Total 136402 Sq.ft. saleable area. 123191 saleable area booked.
90% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 2023231011067
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.74 Sq.mts. ( 385 Sq.ft. )85
81 Booked95% Booked
95% Booked
2 BHK49.74 Sq.mts. ( 535 Sq.ft. )44
40 Booked90% Booked
90% Booked
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )44
42 Booked95% Booked
95% Booked
173 total apartments / 163 apartments booked. 94% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 2023231011260
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.74 Sq.mts. ( 385 Sq.ft. )85
70 Booked82% Booked
82% Booked
2 BHK49.64 Sq.mts. ( 534 Sq.ft. )22
19 Booked86% Booked
86% Booked
2 BHK49.73 Sq.mts. ( 535 Sq.ft. )22
20 Booked90% Booked
90% Booked
129 total apartments / 109 apartments booked. 84% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Akshar Shanti Realtors Private Limited
for Project
Imperial Heights Phase I - A And B Wing
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation