Project overview
Laxmi Kunj is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800046721. Laxmi Kunj is located at Jvpd, Juhu. This is a New Project being developed by Geecee Ventures Limited.
Laxmi Kunj has 4 BHK & Duplex Addn. Area Apartments with carpet areas ranging from 2052 to 336 Sq.ft. Carpet. The Project has total 6 of which 1 are currently available for sale.
Laxmi Kunj is being developed on a total land area of 5402 Sq.ft. Laxmi Kunj has 1 Wings / Towers Laxmi Kunj
Project | Developer | Location | Possession |
-
Project:
Laxmi Kunj
-
Location:
-
Jvpd, Juhu
-
Const. Stage:
New Project
-
Possession:
31 Dec 2024
-
Developer:
Geecee Ventures Limited
-
Phone:
-
Address:
-
209-210 2Nd Floor, Arcadia Building, Ncpa Marg, Ncpa, Nariman Point, 400021
MAHA REARA No: |
P51800046721 |
Project Type |
Residential |
RERA Project Status |
New Project |
Architect |
A V Natekar Architects |
Funding Bank |
HDFC BANK |
Proposed Possession |
31 Dec 2024 |
Revised Possession |
|
Extended Possession |
|
Litigations |
No Litigations |
Last Modified |
20 Jan 2024 |
Last Retrived |
14 Jan 2025 |
Laxmi Kunj QR Code
Laxmi Kunj
MahaRERA - P51800046721
Type | Area |
4 BHK | 190.63 Sq.mts. ( 2052 Sq.ft. ) |
Duplex Addn. Area | 31.26 Sq.mts. ( 336 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Laxmi Kunjlast updated on 14 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
Car Parking Systems100% completed
|
|
Car Parking System To Be Installed |
Community Buildings95% completed
|
|
To Be Constructed As Per Provision In Plans |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
To Be Constructed And Installed |
Energy management95% completed
|
|
Electric Installations With Led To Be Installed |
Fire Protection And Fire Safety
Requirements100% completed
|
|
To Be Installed As Per Cfo Noc |
Landscaping & Tree Planting100% completed
|
|
Existing Retained Trees And Newly Planted Trees |
|
|
Na |
Passenger Lifts100% completed
|
|
Two Passenger Lifts To Be Installed |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Laying Of Internal Drainage Lines |
Solid Waste Management And Disposal90% completed
|
|
Demolition And Excavated Debris To Be Disposed |
Storm Water Drains95% completed
|
|
Storm Water Drains To Be Provided. |
Street Lighting95% completed
|
|
Compound Gate/Wall Lighting To Be Fitted |
Treatment And Disposal Of Sewage And Sullage Water100% completed
|
|
Sewage And Sullage Discharge Of The Building To Be |
Water Conservation, Rain water Harvesting95% completed
|
|
Borewell To Be Executed On Site |
Water Supply100% completed
|
|
As Per Mcgm Rules/Regulations. |
Buildings / Wings in Laxmi Kunj
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Laxmi Kunj by Geecee Ventures Limitedlast updated on 14 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
6
apartments in total
Saleable Area Statistics (Sq. ft.)
7165
Total
Total 6 apartments in project. 5 apartments booked. 83% apartments booked.
Total 7165 Sq.ft. saleable area. 5113 saleable area booked.
71% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Laxmi Kunj | Dec 2024 | 9 | 1 | 0 | 1 | 0 | 2 | 15 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
4 BHK | 190.63 Sq.mts. ( 2052 Sq.ft. ) | 3 | |
Duplex Addn. Area | 31.26 Sq.mts. ( 336 Sq.ft. ) | 3 | |
6 total apartments / 5 apartments booked. 83% apartments booked. |
Work Description in Building Laxmi Kunj | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Geecee Ventures Limited
for Project
Laxmi Kunj
last updated on
14 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |