Project overview

Laxmi Kunj is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800046721. Laxmi Kunj is located at Jvpd, Juhu. This is a New Project being developed by Geecee Ventures Limited.

Laxmi Kunj has 4 BHK & Duplex Addn. Area Apartments with carpet areas ranging from 2052 to 336 Sq.ft. Carpet. The Project has total 6 of which 1 are currently available for sale.

Laxmi Kunj is being developed on a total land area of 5402 Sq.ft. Laxmi Kunj has 1 Wings / Towers Laxmi Kunj

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Laxmi Kunj
  • Location:
  • Jvpd, Juhu
  • Const. Stage:
    New Project
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Geecee Ventures Limited
  • Phone:
  • Address:
  • 209-210 2Nd Floor, Arcadia Building, Ncpa Marg, Ncpa, Nariman Point, 400021
Project RERA Details
MAHA REARA No: P51800046721
Project Type Residential
RERA Project Status New Project
Architect A V Natekar Architects
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 20 Jan 2024
Last Retrived 14 Jan 2025
Laxmi Kunj QR Code
Laxmi Kunj
MahaRERA - P51800046721
Apartment Details & Configuration
TypeArea
4 BHK190.63 Sq.mts. ( 2052 Sq.ft. )
Duplex Addn. Area31.26 Sq.mts. ( 336 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Laxmi Kunjlast updated on 14 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Car Parking Systems100% completed
95% Complete
Car Parking System To Be Installed
Community Buildings95% completed
95% Complete
To Be Constructed As Per Provision In Plans
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
To Be Constructed And Installed
Energy management95% completed
95% Complete
Electric Installations With Led To Be Installed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
To Be Installed As Per Cfo Noc
Landscaping & Tree Planting100% completed
95% Complete
Existing Retained Trees And Newly Planted Trees
Open Parking
Na
Passenger Lifts100% completed
95% Complete
Two Passenger Lifts To Be Installed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Laying Of Internal Drainage Lines
Solid Waste Management And Disposal90% completed
90% Complete
Demolition And Excavated Debris To Be Disposed
Storm Water Drains95% completed
95% Complete
Storm Water Drains To Be Provided.
Street Lighting95% completed
95% Complete
Compound Gate/Wall Lighting To Be Fitted
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Sewage And Sullage Discharge Of The Building To Be
Water Conservation, Rain water Harvesting95% completed
95% Complete
Borewell To Be Executed On Site
Water Supply100% completed
95% Complete
As Per Mcgm Rules/Regulations.
Buildings / Wings in Laxmi Kunj
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Laxmi Kunj by Geecee Ventures Limitedlast updated on 14 Jan 2025 as per information obtained from MARA RERA.

5402 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

6 apartments in total
Total
6
Booked
5
Available
1

Saleable Area Statistics (Sq. ft.)

7165 Total
Total
7165
Booked
5113
Available
2052
Total 6 apartments in project. 5 apartments booked. 83% apartments booked.
Total 7165 Sq.ft. saleable area. 5113 saleable area booked.
71% area booked.

Laxmi Kunj

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Laxmi KunjDec 202491010215
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK190.63 Sq.mts. ( 2052 Sq.ft. )3
2 Booked66% Booked
66% Booked
Duplex Addn. Area31.26 Sq.mts. ( 336 Sq.ft. )3
3 Booked100% Booked
100% Booked
6 total apartments / 5 apartments booked. 83% apartments booked.
Work Description in Building Laxmi KunjCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress87% done
87% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Geecee Ventures Limited
for Project
Laxmi Kunj
last updated on 14 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation