Project overview

Majestic Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007283. Majestic Towers is located at Opp Mumncipal School, Nahur West, Nahur West. This is a On-Going Project being developed by Housing Development And Infrastructure Ltd.

Majestic Towers has 2 BHK, 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 711 to 963 Sq.ft. Carpet. The Project has total 964 of which 563 are currently available for sale.

Majestic Towers is being developed on a total land area of 106709 Sq.ft. out of which 34282 Sq.ft. i.e 32% is reserved for recreational purposes. Majestic Towers has 7 Wings / Towers Wing - B,Wing - C,Wing - D,Wing A,Wing A -Phase 2-36Th Floor,Wing B - Phase 2 - 36Th Floor,Wing C - Phase 2- 36Th Floor

ProjectDeveloperLocationPossession
Samarth Srishti Phase 1 Wing BSwami Aasha AssociatesLbs Marg, Bhandup West, Bhandup West31-12-2021 00:00:00
PrimoCeear Land Developers LlpOff. Lbs Road, Near Shangrilla Biscuit Factory, Near Shangrilla Biscuit Factory31-12-2020 00:00:00
Shubh ChintanAum EnterprisesM.D.Keni Marg, Nahur East, Nahur East31-12-2020 00:00:00
Majestic TowersHousing Development And Infrastructure LtdOpp Mumncipal School, Nahur West, Nahur West31-12-2013 00:00:00
Tiara CourtTiara Signature Homes LlpMumbai Suburban, 40008030-05-2019 00:00:00
Runwal Greens Wings 5 - 8Runwal Apartments Private LimitedMumbai Suburban, 40002231-10-2017 00:00:00
Srishti EleganceSwastik RealtorsLbs Marg, Bhandup West, Bhandup West31-12-2018 00:00:00
Eco WindsEcopark Developers LlpLake Road Off Lbs Marg, Bhandup West, Bhandup West30-06-2019 00:00:00
Ashford Royale Tower DAshford Infotech Private LimitedS Samuel Street, Goregaon Mulund Road, Nahur Village, Bhandup, Goregaon Mulund Road, Nahur Village, Bhandup31-03-2019 00:00:00
Integrated KamalIntegrated Spaces LimitedGoregaon Mulund Link Road, Mulund West, Mulund West31-12-2018 00:00:00
Sai Radha ComplexG. K. RealtorsLbs Marg, Bhandup West, Bhandup West31-12-2018 00:00:00
Dp Star TrinetraDp Buildhomes LlpDatta Mandir Road, Bhandup West, Bhandup West15-12-2021 00:00:00
Srishti Pride Phase 1- Wing AKrishna EnterpriseLbs Marg, Bhandup, Bhandup30-12-2023 00:00:00
Senroofs Phase - IiPioneer HousingSenroofs Mile, Nahur, Nahur31-12-2015 00:00:00
Samarth Garden Wings F And GS.A.DevelopersDatta Mandir Road, Bhandup (W), Bhandup (W)31-03-2013 00:00:00
Shreeji HarmonyShreenath BuildersMumbai Suburban, 40008030-06-2018 00:00:00
Ashford Royale Tower AAshford Infotech Private LimitedS. Samuel Street, Goregaon Mulund Road, Nahur, Village Bhandup, Goregaon Mulund Road, Nahur, Village Bhandup31-12-2017 00:00:00
Ashoka HeightsOm Builders And DevelopersNahur Village Road, Mulund West, Mulund West01-11-2020 00:00:00
Alag CapitalAlag Property Constructions Pvt. Ltd.Mulund Goregaon Link Road, Mulund West, Mulund West30-06-2024 00:00:00
Runwal PinnacleRunwal Apartments Private LimitedGoregaon Mulund Link Road, Mulund(West), Mulund(West)30-06-2026 00:00:00
Project Details
  • Project:
    Majestic Towers
  • Location:
  • Opp Mumncipal School, Nahur West, Nahur West
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2013
Developer Details

  • Developer:
    Housing Development And Infrastructure Ltd
  • Phone:
  • Address:
  • 9-01, Hdil Towers, Anant Kanekar Marg, Near Small Causes Court, Bandra(East), 400051
Project RERA Details
MAHA REARA No: P51800007283
Project Type Residential
RERA Project Status On-Going Project
Architect Indrajeet S. Deshmukh
Funding Bank YES BANK
Proposed Possession 31 Dec 2013
Revised Possession 30 Dec 2020
Extended Possession
Litigations No Litigations
Last Modified 19 Apr 2019
Last Retrived 15 Jan 2025
Majestic Towers QR Code
Majestic Towers
MahaRERA - P51800007283
Apartment Details & Configuration
TypeArea
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )
2.5 BHK75.06 Sq.mts. ( 808 Sq.ft. )
2.5 BHK75.26 Sq.mts. ( 810 Sq.ft. )
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )
2.5 BHK76.67 Sq.mts. ( 825 Sq.ft. )
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )
3 BHK90.67 Sq.mts. ( 976 Sq.ft. )
2.5 BHK76.95 Sq.mts. ( 828 Sq.ft. )
2.5 BHK77.02 Sq.mts. ( 829 Sq.ft. )
2.5. BHK76.39 Sq.mts. ( 822 Sq.ft. )
2.5 BHK75.6 Sq.mts. ( 814 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Majestic Towerslast updated on 15 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Provided For Entire Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
Receiving Station Work Completed
Energy management
Yet To Commence
Fire Protection And Fire Safety Requirements
Yet To Commence
Landscaping & Tree Planting
Yet To Commence
Open Parking
Yet To Commence
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Commence
Solid Waste Management And Disposal
Yet To Commence
Storm Water Drains
Yet To Commence
Street Lighting
Yet To Commence
Treatment And Disposal Of Sewage And Sullage Water
Yet To Commence
Water Conservation, Rain water Harvesting
Yet To Commence
Water Supply
Yet To Commence
Buildings / Wings in Majestic Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Majestic Towers by Housing Development And Infrastructure Ltdlast updated on 15 Jan 2025 as per information obtained from MARA RERA.

106709 Sq. ft.

Project Area

34282 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

964 apartments in total
Total
964
Booked
401
Available
563

Saleable Area Statistics (Sq. ft.)

784865 Total
Total
784865
Booked
311354
Available
473511
Total 964 apartments in project. 401 apartments booked. 41% apartments booked.
Total 784865 Sq.ft. saleable area. 311354 saleable area booked.
40% area booked.

Wing - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - BJan 190036121601
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )66
42 Booked63% Booked
63% Booked
2.5 BHK75.06 Sq.mts. ( 808 Sq.ft. )66
20 Booked30% Booked
30% Booked
2.5 BHK75.26 Sq.mts. ( 810 Sq.ft. )70
21 Booked30% Booked
30% Booked
202 total apartments / 83 apartments booked. 41% apartments booked.
Work Description in Building Wing - BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress47% done
47% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress59% done
59% Booked

Wing - C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - CJan 190036121631
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )70
45 Booked64% Booked
64% Booked
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )70
48 Booked68% Booked
68% Booked
2.5 BHK76.67 Sq.mts. ( 825 Sq.ft. )62
22 Booked35% Booked
35% Booked
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )70
17 Booked24% Booked
24% Booked
272 total apartments / 132 apartments booked. 48% apartments booked.
Work Description in Building Wing - CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

Wing - D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - DJan 1900361216251
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )66
40 Booked60% Booked
60% Booked
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )62
39 Booked62% Booked
62% Booked
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )70
3 BHK90.67 Sq.mts. ( 976 Sq.ft. )70
15 Booked21% Booked
21% Booked
268 total apartments / 100 apartments booked. 37% apartments booked.
Work Description in Building Wing - DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress68% done
68% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJan 190036121601
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK76.95 Sq.mts. ( 828 Sq.ft. )70
32 Booked45% Booked
45% Booked
2.5 BHK77.02 Sq.mts. ( 829 Sq.ft. )66
25 Booked37% Booked
37% Booked
2.5. BHK76.39 Sq.mts. ( 822 Sq.ft. )66
29 Booked43% Booked
43% Booked
202 total apartments / 86 apartments booked. 42% apartments booked.
Work Description in Building Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress27% done
27% Booked

Wing A -Phase 2-36Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A -Phase 2-36Th FloorJan 19001000600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK76.39 Sq.mts. ( 822 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK76.95 Sq.mts. ( 828 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK77.02 Sq.mts. ( 829 Sq.ft. )2
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A -Phase 2-36Th FloorCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B - Phase 2 - 36Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - Phase 2 - 36Th FloorJan 19001000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK75.26 Sq.mts. ( 810 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK75.6 Sq.mts. ( 814 Sq.ft. )2
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing B - Phase 2 - 36Th FloorCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C - Phase 2- 36Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C - Phase 2- 36Th FloorJan 19001000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK76.67 Sq.mts. ( 825 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )2
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C - Phase 2- 36Th FloorCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Housing Development And Infrastructure Ltd
for Project
Majestic Towers
last updated on 15 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation