Project overview
Mayfair Virar Gardens Building No 23, 24 And 25 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000028348. Mayfair Virar Gardens Building No 23, 24 And 25 is located at Virar Aghashi Road, Virar West, Virar West. This is a New Project being developed by Mayfair Housing.
Mayfair Virar Gardens Building No 23, 24 And 25 has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 115 to 791 Sq.ft. Carpet. The Project has total 487 of which 61 are currently available for sale.
Mayfair Virar Gardens Building No 23, 24 And 25 is being developed on a total land area of 23755 Sq.ft. Mayfair Virar Gardens Building No 23, 24 And 25 has 3 Wings / Towers Building Number 23,Building Number 24,Building Number 25
Project | Developer | Location | Possession |
Joyville Virar Phase 3 | Joyville Shapoorji Housing Private Limited | Virar, Virar | 31-12-2022 00:00:00 |
Joyville Virar Phase 5 | Joyville Shapoorji Housing Private Limited | Virar, Virar | 28-08-2023 00:00:00 |
Joyville Virar Phase 4 | Joyville Shapoorji Housing Private Limited | Virar, Virar | 30-01-2024 00:00:00 |
-
Project:
Mayfair Virar Gardens Building No 23, 24 And 25
-
Location:
-
Virar Aghashi Road, Virar West, Virar West
-
Const. Stage:
New Project
-
Possession:
30 Sep 2026
-
Developer:
Mayfair Housing
-
Phone:
-
Address:
-
1, Mayfair Meridian, Ceaser Road, Amboli, Andheri West, 400058
MAHA REARA No: |
P99000028348 |
Project Type |
Residential |
RERA Project Status |
New Project |
Architect |
Jai Mistry |
Funding Bank |
ICICI BANK LTD |
Proposed Possession |
30 Sep 2026 |
Revised Possession |
|
Extended Possession |
|
Litigations |
No Litigations |
Last Modified |
10 Feb 2024 |
Last Retrived |
13 Jan 2025 |
Mayfair Virar Gardens Building No 23, 24 And 25 QR Code
Mayfair Virar Gardens Building No 23, 24 And 25
MahaRERA - P99000028348
Type | Area |
1 BHK | 33.25 Sq.mts. ( 358 Sq.ft. ) |
2 BHK | 44.16 Sq.mts. ( 475 Sq.ft. ) |
Shop | 10.57 Sq.mts. ( 114 Sq.ft. ) |
Shop | 11.55 Sq.mts. ( 124 Sq.ft. ) |
Shop | 13.33 Sq.mts. ( 143 Sq.ft. ) |
Shop | 13.47 Sq.mts. ( 145 Sq.ft. ) |
Shop | 14.19 Sq.mts. ( 153 Sq.ft. ) |
Shop | 15.66 Sq.mts. ( 169 Sq.ft. ) |
Shop | 73.48 Sq.mts. ( 791 Sq.ft. ) |
Shop | 36.34 Sq.mts. ( 391 Sq.ft. ) |
Shop | 10.67 Sq.mts. ( 115 Sq.ft. ) |
Shop | 11.5 Sq.mts. ( 124 Sq.ft. ) |
Shop | 13.07 Sq.mts. ( 141 Sq.ft. ) |
Shop | 13.57 Sq.mts. ( 146 Sq.ft. ) |
Shop | 17.58 Sq.mts. ( 189 Sq.ft. ) |
Shop | 20.59 Sq.mts. ( 222 Sq.ft. ) |
Shop | 27.52 Sq.mts. ( 296 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Mayfair Virar Gardens Building No 23, 24 And 25last updated on 13 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Proposed |
|
|
Proposed |
Fire Protection And Fire Safety
Requirements23% completed
|
|
Proposed As Per Cfo Noc |
Landscaping & Tree Planting
|
|
Na |
|
|
Proposed |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Proposed |
Solid Waste Management And Disposal
|
|
Proposed |
Storm Water Drains10% completed
|
|
Proposed |
|
|
Proposed |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Proposed |
Water Conservation, Rain water Harvesting
|
|
Proposed |
|
|
Water Connection From Vvcmc |
Buildings / Wings in Mayfair Virar Gardens Building No 23, 24 And 25
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mayfair Virar Gardens Building No 23, 24 And 25 by Mayfair Housinglast updated on 13 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
487
apartments in total
Saleable Area Statistics (Sq. ft.)
182533
Total
Total 487 apartments in project. 426 apartments booked. 87% apartments booked.
Total 182533 Sq.ft. saleable area. 166559 saleable area booked.
91% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building Number 23 | Mar 2026 | 22 | 1 | 0 | 1 | 0 | 0 | 36 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 33.25 Sq.mts. ( 358 Sq.ft. ) | 123 | |
2 BHK | 44.16 Sq.mts. ( 475 Sq.ft. ) | 42 | |
Shop | 10.57 Sq.mts. ( 114 Sq.ft. ) | 2 | |
Shop | 11.55 Sq.mts. ( 124 Sq.ft. ) | 2 | |
Shop | 13.33 Sq.mts. ( 143 Sq.ft. ) | 2 | |
Shop | 13.47 Sq.mts. ( 145 Sq.ft. ) | 2 | |
Shop | 14.19 Sq.mts. ( 153 Sq.ft. ) | 2 | |
Shop | 15.66 Sq.mts. ( 169 Sq.ft. ) | 2 | |
177 total apartments / 163 apartments booked. 92% apartments booked. |
Work Description in Building Building Number 23 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building Number 24 | Mar 2026 | 22 | 1 | 0 | 1 | 0 | 0 | 38 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 33.25 Sq.mts. ( 358 Sq.ft. ) | 123 | |
2 BHK | 44.16 Sq.mts. ( 475 Sq.ft. ) | 42 | |
Shop | 10.57 Sq.mts. ( 114 Sq.ft. ) | 2 | |
Shop | 11.55 Sq.mts. ( 124 Sq.ft. ) | 2 | |
Shop | 13.33 Sq.mts. ( 143 Sq.ft. ) | 2 | |
Shop | 13.47 Sq.mts. ( 145 Sq.ft. ) | 2 | |
Shop | 14.19 Sq.mts. ( 153 Sq.ft. ) | 2 | |
Shop | 15.66 Sq.mts. ( 169 Sq.ft. ) | 2 | |
177 total apartments / 150 apartments booked. 84% apartments booked. |
Work Description in Building Building Number 24 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building Number 25 | Mar 2026 | 22 | 1 | 0 | 1 | 0 | 0 | 22 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 33.25 Sq.mts. ( 358 Sq.ft. ) | 84 | |
2 BHK | 44.16 Sq.mts. ( 475 Sq.ft. ) | 39 | |
Shop | 73.48 Sq.mts. ( 791 Sq.ft. ) | 1 | |
Shop | 36.34 Sq.mts. ( 391 Sq.ft. ) | 1 | |
Shop | 10.67 Sq.mts. ( 115 Sq.ft. ) | 1 | |
Shop | 11.5 Sq.mts. ( 124 Sq.ft. ) | 1 | |
Shop | 13.07 Sq.mts. ( 141 Sq.ft. ) | 1 | |
Shop | 13.57 Sq.mts. ( 146 Sq.ft. ) | 1 | |
Shop | 14.19 Sq.mts. ( 153 Sq.ft. ) | 1 | |
Shop | 17.58 Sq.mts. ( 189 Sq.ft. ) | 1 | |
Shop | 20.59 Sq.mts. ( 222 Sq.ft. ) | 1 | |
Shop | 27.52 Sq.mts. ( 296 Sq.ft. ) | 1 | |
133 total apartments / 113 apartments booked. 84% apartments booked. |
Work Description in Building Building Number 25 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Mayfair Housing
for Project
Mayfair Virar Gardens Building No 23, 24 And 25
last updated on
13 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |