Project overview

Metro Grande Tower C And D is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900004149. Metro Grande Tower C And D is located at Kalyan Shill Road, Metro Junction Mall, Metro Junction Mall. This is a On-Going Project being developed by West Pioneer Properties India Pvt Ltd.

Metro Grande Tower C And D has 1 BHK L E, 1 BHK L O, 2 BHK L E, 2 BHK L O, 2 BHK M E, 2 BHK M O, 2 BHK S E, 2 BHK S O, 2.5 BHK L E, 2.5 BHK L O, 2.5 BHK M E, 2.5 BHK M O, 2.5 BHK S E, 2.5 BHK S O, 3 BHK PALATIAL E, 3 BHK PALATIAL O & Shop Apartments with carpet areas ranging from 1462 to 1044 Sq.ft. Carpet. The Project has total 414 of which 158 are currently available for sale.

Metro Grande Tower C And D is being developed on a total land area of 96198 Sq.ft. Metro Grande Tower C And D has 2 Wings / Towers Tower C,Tower D

ProjectDeveloperLocationPossession
Baliram Tare ResidencyTare Group Builders And DevelopersTulja Bhavani Mandir Road, Chinchpada Gaon, Chinchpada Gaon31-12-2025 00:00:00
Om Ashish ChsGreen Heights InfraChurch Road, Ganesh Nagar, Ganesh Nagar31-12-2025 00:00:00
Shiv Ganga ApartmentShree Swami Samarth ConstructionSatramdas, Ulhasnagar, Ulhasnagar31-12-2024 00:00:00
Simone ResidencyM R M DevelopersKalyan, Daighar Village, Daighar Village30-12-2022 00:00:00
Delta WoodsDelta VentureMira Midc Road, Mira Road, Mira Road30-09-2023 00:00:00
Shreeji LandmarkVinayak DevelopersGodrej Hill Road, Khadakpada, Khadakpada30-12-2029 00:00:00
Arihant City Phase-Ii - N BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
Arihant City Phase-Ii - K BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad Bhiwandi, Bhadwad Bhiwandi30-06-2026 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt LtdGhod Bunder Road, Nr. Hiranandani Meadows, Nr. Hiranandani Meadows30-12-2021 00:00:00
The Icon Phase 1Leading Frontier Private LimitedHighlands Garden Road, Dhokali, Dhokali30-12-2022 00:00:00
Arihant City Phase-Ii - M BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
Arihant City Phase-Ii - L BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
Thanekar Civic Phase IiThanekar Construction LlpVadavali Gaon, Chikhloli Badlapur, Chikhloli Badlapur30-12-2024 00:00:00
Om Dattatray Chs LtdShiv Shakti DevelopersPlot No 13, Shiv Ganga Nagar, Shiv Ganga Nagar31-12-2024 00:00:00
25Hourlife - Tower B1Runwal Developers Private LimitedGhodbundar Road, Punchpakhadi, Punchpakhadi31-12-2029 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private LimitedVillage Panchpakhadi, Pokharan Road No.2, Subhash Nagar, Thane- West, Subhash Nagar, Thane- West, Village Panchpakhadi31-12-2027 00:00:00
Umiya Nakshatra HeightsM/S. Jigar EnterpriseKarjat Badlapur By Pass Road, Katrap Badlapur E, Katrap Badlapur E31-12-2027 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyBalkum Road, Balkum, Balkum31-12-2022 00:00:00
Vardhman VatikaDiwali DevelopersGhodbunder Road, Thane, Thane31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedMankivili Road, Mankivili, Mankivili30-12-2023 00:00:00
SanyogAditya AssociatesRam Ganesh Gadkari Cross Road, Naupada, Naupada30-06-2023 00:00:00
Sachinam Co Op Hsg SocietyShreekanth DevelopersGaondevi Road, Kulgaon, Kulgaon31-03-2024 00:00:00
Krishna KunjShashank C Mishra HufB K No A-513, Room No 1026, Cts No 18726, Sheet No 16, Ulhasnagar, Ulhasnagar, B K No A-513, Room No 1026, Cts No 1872631-12-2023 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private LimitedOld Mumbai Pune Highway, Shilphata Junction, Thane, Shilphata Junction, Thane31-12-2022 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedMidc Road, Mankivali, Mankivali31-12-2018 00:00:00
Krishna Vihar Co-Operative Housing Society LimitedBal Ganapati Laabh DevelopersRam Maruti Road, Naupada, Naupada30-12-2021 00:00:00
Yashanand Chsl Ojass ConstructionsOjass ConstructionsGovind Bacchaji Road, Charai Thane West, Charai Thane West30-03-2022 00:00:00
Orion - Northern LightsJaykali Developers Private LimitedPokharan Road No. 2, Village Panchpakhadi, Subhash Nagar, Thane (West), Thane (West), Pokharan Road No. 2, Village Panchpakhadi30-03-2025 00:00:00
Omega - Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane (West), Subhash Nagar, Thane (West), Pokharan Road No.230-03-2025 00:00:00
Royal EmpireSai Pooja ConstructionsBoradpada Road, Badlapur, Badlapur30-12-2024 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdThane, 41020301-03-2014 00:00:00
Silver ArcadeSiddhivinayak EnterprisesThane, 40060131-12-2017 00:00:00
Orion Business ParkNeminath EnterprisesG B Road, Cine Wonder Cinema, Cine Wonder Cinema31-12-2018 00:00:00
Guru SakshatSadguru EnterprisesB Cabin Road, Siddhivinayak Nagar, Siddhivinayak Nagar30-12-2025 00:00:00
Poddar Wondercity Phase - ViPoddar Housing And Development Limited-, Joveli Vilalge, Joveli Vilalge30-06-2024 00:00:00
Poddar Wondercity Phase - IiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2022 00:00:00
Poddar Wondercity Phase - IPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2023 00:00:00
Poddar Wondercity Phase - IiiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2024 00:00:00
Poddar Wondercity Phase - IvPoddar Housing And Development Limited-, Joveli Village, Joveli Village31-07-2023 00:00:00
Poddar Wondercity Phase - VPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2024 00:00:00
Lodha Amara - Wing 40 And 41Macrotech Developers LimitedSector 5, Balkum, Balkum29-11-2024 00:00:00
Palava Serenity APalava Dwellers Private LimitedKalyan Sheel Phata Road, Palava, Palava28-11-2025 00:00:00
Evana D-2Vihang Infrastructure Pvt LtdGb Cross Road Thane, Thane, Thane31-12-2029 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai, Ambernath, Ambernath31-12-2025 00:00:00
Gnp ArcadiaPriva InfraconDombivli Industrial Area, Midc, Dombivli, Midc, Dombivli31-01-2021 00:00:00
Paramount BKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-06-2024 00:00:00
Upper Thane -Sereno A1Macrotech Developers Limited.31-07-2024 00:00:00
Asmeeta Texpa - IiMagus Infratech Private LimitedKalyan Bhiwandi Road, Additional Kalyan Bhiwandi Industrial Area, Additional Kalyan Bhiwandi Industrial Area30-12-2030 00:00:00
Janki LegacyNandkumar PapaiyaRamdev Park Road, Mira Road East, Mira Road East22-04-2026 00:00:00
Raj Height A WingBhavani EnterprisesLodha Heaven, Shirgoan, Shirgoan31-12-2019 00:00:00
Oyster - Shapoorji Pallonji Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane West, Village Panchpakhadi, Subhash Nagar, Thane West30-09-2025 00:00:00
Gajanan Samruddhi Phase Ii C WingShree Gajanan Developers100 Feet Road, Khadegolavali, Khadegolavali30-12-2023 00:00:00
Jasmine TPalava Dwellers Pvt LtdKalyan Shilphata Road, Palava, Palava30-03-2023 00:00:00
Jasmine A, B, C, G, H And IPalava Dwellers Pvt Ltd.30-03-2023 00:00:00
The EmpressUnique Shanti Developers LlpBehind Latif Park, Opp. Mig Colony,, Mira Road (East), Dist. Thane, Mira Road (East), Dist. Thane, Behind Latif Park, Opp. Mig Colony30-03-2023 00:00:00
Lotus ParkReal EnterpriseShahpur, Shahpur30-12-2022 00:00:00
Raviraj ApartmentRajendra GhorpadeGanesh Nagar Road, Ganesh Nagar, Ganesh Nagar30-12-2022 00:00:00
Krupa SindhuAshish GoleKulgaon, Kulgaon28-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesDr Agaskar Road, Naupada, Naupada30-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyShirgaon, Badlapur, Badlapur30-09-2019 00:00:00
Mauli MadhusudhanRameshwar PatilVasundari Road, Near Siddeshwar Hospital, Near Siddeshwar Hospital30-03-2023 00:00:00
Salangpur NirmanSalangpur NirmanRamdev Park Road, Mira Road East, Mira Road East30-12-2022 00:00:00
Sheth Cnergy Ph 1 - Upto 11Th FloorSheth Developers Private LimitedEastern Express Highway, Panch Pakhadi, Panch Pakhadi30-12-2023 00:00:00
Paramount EKalpataru Homes Private LimitedMajiwada, Thane, Thane30-06-2025 00:00:00
Jai MatadeeAaradhana DevelopersBhaskar Colony, Bhaskar Colony31-12-2017 00:00:00
One Indiabulls Thane - 1Tapir Constructions LimitedPokharan Road No 2, Thane, Thane29-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited.31-12-2020 00:00:00
Om ShikharVaidik DevelopersDiva Vasai Railway Track Road, Juni Dombivli, Juni Dombivli01-05-2022 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.Pokhran Road No 2, Pokhran Road 2, Pokhran Road 202-10-2026 00:00:00
Teri KudratVishnu BadlaniNear Prabhat Garden, Opp Menka Apartment, Opp Menka Apartment31-10-2024 00:00:00
Golden Hills B- 3Vihang EnterprisesG.B. Road, Thane, Bhayenderpada, Bhayenderpada, G.B. Road30-12-2024 00:00:00
Classic ResidencyClassic ConstructionPanna Compound, New Kaneri, New Kaneri30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersKhadapada Road, Khadakpada, Khadakpada30-03-2026 00:00:00
Madhu VillaShree Krishna EnterprisesChikanghar, Chikanghar30-12-2022 00:00:00
Shapoorji Pallonji The Impulse- Phase 1Jaykali Developers Private LimitedPokharan Road No. 2, Village Panchpakhadi, Subhash Nagar, Pokharan Road No.2, Thane- West, Village Panchpakhadi, Subhash Nagar, Pokharan Road No.2, Thane- West30-06-2024 00:00:00
Rental Building A-1 R2Sonam BuildersNew Golden Nest Phase Xiii, Bhayander East, Bhayander East31-12-2019 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private LimitedThane, 40060131-12-2022 00:00:00
Highland Springs B4- A WingSiddhi Real Estate DevelopersUniversity Road, Dhokali, Dhokali30-06-2020 00:00:00
Shivsai ParadiseBharat Agri Fert &Amp; Realty LimitedMajiwada Village Road, Thane West, Thane West31-12-2027 00:00:00
RubaShreyas EnterprisesRam Maruti Road, Ram Maruti Road31-03-2020 00:00:00
25Hourlife - Tower C1Runwal Developers Private LimitedGhodbundar Road, Panchpakhadi, Panchpakhadi31-12-2029 00:00:00
Omkarr Sindhu ResidencyBluesky RealtyKurla Camp Road, Kurla Camp, Kurla Camp31-08-2024 00:00:00
Siddhivinayak Prasad Co-Op.Housing Soc.LtdShaurya DevelopersKulgaon, Badlapur, Badlapur31-12-2026 00:00:00
Kanha ResidencyKulkarnii BuilderFatima School Road, Belavali Gaon, Belavali Gaon14-05-2025 00:00:00
Trinity MokshRattanraj LifespacesNxt To Shiv Mandir Road, Palegaon, Palegaon31-03-2025 00:00:00
Ganesh BhuvanMagnum HomesHitavardhani Path, Naupada, Naupada30-09-2024 00:00:00
Ekatva CoralSynergy DevelopersGanesh Wadi Road, Pancpakhadi, Pancpakhadi31-12-2025 00:00:00
24 EastMalhar DevelopersSector 8, Sanpada, Sanpada30-06-2026 00:00:00
Harshal Co-Op Housing Society LtdVeena DevelopersHari Niwas, Hari Niwas30-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresJuveli, Juveli30-06-2025 00:00:00
Spm Dream City Phase 1D K BuildconVillage Pali, Village Pali31-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-06-2025 00:00:00
NandigramYogesh MahajanKabe Road, Mahagiri Kharkar Ali, Thane, Mahagiri Kharkar Ali, Thane31-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNear Platina Complex, Bhayander West, Bhayander West31-12-2027 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt LtdDiva Manpada Road, Usarghar Dombivali, Usarghar Dombivali31-12-2027 00:00:00
Seven Eleven CourtyardS.S.S AssoicatesMira Bhaynder Road, Goddev, Goddev30-11-2025 00:00:00
Suyog ApartmentTelange Builders &Amp; Developers Private LimitedSai Section, Sai Section30-03-2025 00:00:00
Project Details
  • Project:
    Metro Grande Tower C And D
  • Location:
  • Kalyan Shill Road, Metro Junction Mall, Metro Junction Mall
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2023
Developer Details

  • Developer:
    West Pioneer Properties India Pvt Ltd
  • Phone:
  • Address:
  • 1002, Indiabulls Finance Centre, Senapati Bapat Marg, Opposite Railway Station, Elphinstone Road, 400013
Project RERA Details
MAHA REARA No: P51900004149
Project Type Residential
RERA Project Status On-Going Project
Architect Nirmaan Architects
Funding Bank RBL Bank Ltd
Proposed Possession 31 Dec 2023
Revised Possession 30 Dec 2024
Extended Possession 30 Jun 2025
Litigations Yes
Last Modified 19 Jan 2024
Last Retrived 18 Jan 2025
Metro Grande Tower C And D QR Code
Metro Grande Tower C And D
MahaRERA - P51900004149
Apartment Details & Configuration
TypeArea
1 BHK L E36.25 Sq.mts. ( 390 Sq.ft. )
2 BHK L E70 Sq.mts. ( 753 Sq.ft. )
2 BHK M E66.75 Sq.mts. ( 718 Sq.ft. )
2 BHK S E66.5 Sq.mts. ( 716 Sq.ft. )
2.5 BHK L E83.5 Sq.mts. ( 899 Sq.ft. )
2.5 BHK M E83 Sq.mts. ( 893 Sq.ft. )
2.5 BHK S E79.25 Sq.mts. ( 853 Sq.ft. )
3 BHK PALATIAL E97 Sq.mts. ( 1044 Sq.ft. )
Shop135.79 Sq.mts. ( 1462 Sq.ft. )
Shop175.71 Sq.mts. ( 1891 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Metro Grande Tower C And Dlast updated on 18 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
7084 Sq Mt Common Rg For Layout
Club House100% completed
95% Complete
Common For Metro Grande &Amp; Residency
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Common Switching Station For Layout
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
Landscaping & Tree Planting90% completed
90% Complete
Will Be Done Before Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Common Stp Structure For Metro Grande &Amp; Residency
Solid Waste Management And Disposal
Common Owc For Metro Grande &Amp; Residency
Storm Water Drains100% completed
95% Complete
Will Be Done Before Oc
Street Lighting85% completed
85% Complete
Common For Layout
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Wip
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Before Oc
Water Supply80% completed
80% Complete
After Obtaining Oc From Kdmc
Buildings / Wings in Metro Grande Tower C And D
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Metro Grande Tower C And D by West Pioneer Properties India Pvt Ltdlast updated on 18 Jan 2025 as per information obtained from MARA RERA.

96198 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

414 apartments in total
Total
414
Booked
256
Available
158

Saleable Area Statistics (Sq. ft.)

333549 Total
Total
333549
Booked
199842
Available
133708
Total 414 apartments in project. 256 apartments booked. 61% apartments booked.
Total 333549 Sq.ft. saleable area. 199842 saleable area booked.
60% area booked.

Tower C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower CDec 20232810130193
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK L E36.25 Sq.mts. ( 390 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK L O36.25 Sq.mts. ( 390 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK L E70 Sq.mts. ( 753 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK L O70 Sq.mts. ( 753 Sq.ft. )4
1 Booked25% Booked
25% Booked
2 BHK M E66.75 Sq.mts. ( 718 Sq.ft. )28
23 Booked82% Booked
82% Booked
2 BHK M O66.75 Sq.mts. ( 718 Sq.ft. )28
21 Booked75% Booked
75% Booked
2 BHK S E66.5 Sq.mts. ( 716 Sq.ft. )12
9 Booked75% Booked
75% Booked
2 BHK S O66.75 Sq.mts. ( 718 Sq.ft. )12
8 Booked66% Booked
66% Booked
2.5 BHK L E83.5 Sq.mts. ( 899 Sq.ft. )14
12 Booked85% Booked
85% Booked
2.5 BHK L O83.5 Sq.mts. ( 899 Sq.ft. )14
10 Booked71% Booked
71% Booked
2.5 BHK M E83 Sq.mts. ( 893 Sq.ft. )12
10 Booked83% Booked
83% Booked
2.5 BHK M O83 Sq.mts. ( 893 Sq.ft. )11
4 Booked36% Booked
36% Booked
2.5 BHK S E79.25 Sq.mts. ( 853 Sq.ft. )12
8 Booked66% Booked
66% Booked
2.5 BHK S O79.25 Sq.mts. ( 853 Sq.ft. )12
3 BHK PALATIAL E97 Sq.mts. ( 1044 Sq.ft. )14
13 Booked92% Booked
92% Booked
3 BHK PALATIAL O97 Sq.mts. ( 1044 Sq.ft. )14
11 Booked78% Booked
78% Booked
206 total apartments / 144 apartments booked. 69% apartments booked.
Work Description in Building Tower CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower DDec 20232810130194
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK L E36.25 Sq.mts. ( 390 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK L O36.25 Sq.mts. ( 390 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK L E70 Sq.mts. ( 753 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK L O70 Sq.mts. ( 753 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK M E66.75 Sq.mts. ( 718 Sq.ft. )28
24 Booked85% Booked
85% Booked
2 BHK M O66.75 Sq.mts. ( 718 Sq.ft. )28
17 Booked60% Booked
60% Booked
2 BHK S E66.5 Sq.mts. ( 716 Sq.ft. )12
6 Booked50% Booked
50% Booked
2 BHK S O66.5 Sq.mts. ( 716 Sq.ft. )12
6 Booked50% Booked
50% Booked
2.5 BHK L E83.5 Sq.mts. ( 899 Sq.ft. )14
10 Booked71% Booked
71% Booked
2.5 BHK L O83.5 Sq.mts. ( 899 Sq.ft. )14
6 Booked42% Booked
42% Booked
2.5 BHK M E83 Sq.mts. ( 893 Sq.ft. )12
2.5 BHK M O83 Sq.mts. ( 893 Sq.ft. )11
2.5 BHK S E79.25 Sq.mts. ( 853 Sq.ft. )12
10 Booked83% Booked
83% Booked
2.5 BHK S O79.25 Sq.mts. ( 853 Sq.ft. )12
4 Booked33% Booked
33% Booked
3 BHK PALATIAL E97 Sq.mts. ( 1044 Sq.ft. )14
11 Booked78% Booked
78% Booked
3 BHK PALATIAL O97 Sq.mts. ( 1044 Sq.ft. )14
Shop135.79 Sq.mts. ( 1462 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop175.71 Sq.mts. ( 1891 Sq.ft. )1
None Booked0% Booked
0% Booked
208 total apartments / 112 apartments booked. 53% apartments booked.
Work Description in Building Tower DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress74% done
74% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress73% done
73% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
West Pioneer Properties India Pvt Ltd
for Project
Metro Grande Tower C And D
last updated on 18 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation