Project overview

My City - Phase I - Part I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000528. My City - Phase I - Part I is located at Ih49f7zrcgangkmpcd0usx3d5odhca5vfyifmq767lk=. This is a Ongoing being developed by Horizon Projects Pvt Ltd.

My City - Phase I - Part I has 2 BHK, 3 BHK, SH7, SH8 & Shop Apartments with carpet areas ranging from 119 to 677 Sq.ft. Carpet. The Project has total 425 of which 31 are currently available for sale.

My City - Phase I - Part I is being developed on a total land area of 191482 Sq.ft. out of which 44403 Sq.ft. i.e 23% is reserved for recreational purposes. My City - Phase I - Part I has 5 Wings / Towers A3,A4,B2,C3,C4

ProjectDeveloperLocationPossession
Runwal Shopping ArcadeRunwal Residency Private LimitedSurvey Nos. 44/1Pt, 44/4Pt30-04-2024 00:00:00
Ushakiran EnclaveJayant EnterprisesT/+W9kzw0vonnr4b8zzewv1wzdp5o14onr18wscwd2ggbuu/Xsijty7y+Wlufd614r3ylavoiusz8ybjk0wwxaiu3yrk6bpdmnfop/V2eguzhcwtbdbmx2cxk0pnxqteqjb9+Eksd8whtpkxzhs2ta==30-06-2026 00:00:00
Laxmi CastleArihant EnterprisesKalyan-Shil Road31-05-2024 00:00:00
Riverwood Park Building No -3Shree Khidkaleshwar Property Developers Pvt. Ltd.X0iabt+Nbwa15lberfsvo8mjhd0ws2tj2unqfontr5c=30-06-2026 00:00:00
TrinityJd Builders And DevelopersZu28x3w0pkfpse/1Wqkw7wmb8+U7zcoqnnaifsuk+3Oggphxfseswfzd20uiyfloomnallyjpxyx8gu6dyqoatfgudy31y1mxkrk0of4ilc=25-02-2024 00:00:00
Suman ArcadeShreekrupa ConstructionRktungesgbktg+Bt6iewnhauyipy8rksqlwpmdzgidq=31-12-2024 00:00:00
Mauli AnganMauli EnterprisesMangaon31-12-2023 00:00:00
Sai World Dreams Phase 1Out N Out Infotech India LlpVdatuwrjyxc3rnq06fscyra+2Dga4h/Ma2hiq/Pcdysu9gm8iruaj82vlieopji6v/Ptxehm5fq8ey4jk1doow==30-12-2028 00:00:00
Sai Siddhi ResidencyDevendra Damodar PatilOmns8vn0iv0ldjr8qest+Hoy4qhjenflb+25Dx6f+Pm=30-03-2022 00:00:00
VrindavanShivraj DevelopersCn8mqs4gghaj2i/Xj+Nheiyi5uhuxhqmpzf6nrm0b3k=31-07-2024 00:00:00
Venus Skky City Vivanta Bldg AVenus Nirvana Llp31-12-2029 00:00:00
Raunak FortunaRdp Realtors Private LimitedDzsgu24skias/Y/Umnrpiuvtgrjesxb4c6ekormi9gk=31-12-2030 00:00:00
Sai Siddhi ResidencyDevendra Damodar PatilY6psvlx6rbrds8fz11ujagf938g1dnvshhwkzxulze7x2z7bbqaia8xyofo9s/Hu31-12-2024 00:00:00
My City - Phase I - Part IHorizon Projects Pvt LtdIh49f7zrcgangkmpcd0usx3d5odhca5vfyifmq767lk=30-06-2021 00:00:00
Paramount ParkDilip Sudhakar Deshmukh1Qhklqqjb8c51qkfxlq30q==30-12-2034 00:00:00
Shantiniketan Wing B4Anmol AssociatesC/Awtipayy5hmzlptx6wynja+I2grw420w1xijsf0ri=31-12-2019 00:00:00
Shantiniketan Wing CAnmol AssociatesZb82yhhyabd7uvi30zxdmhwlyr1+G5q7zcecwiirh64=31-12-2018 00:00:00
Shantiniketan Wing B3Anmol AssociatesZb82yhhyabd7uvi30zxdmhwlyr1+G5q7zcecwiirh64=31-12-2019 00:00:00
Maitreya Mandai LegacyM/S Saish GroupMlzt2ggaupeksnqneyf4zgytys4wpte2igkhbtg6kx0=31-08-2028 00:00:00
Opulis CLodha Developers Limited6Xzigboyh+8Xwsgnqxkzzq==31-05-2030 00:00:00
Project Details
  • Project:
    My City - Phase I - Part I
  • Location:
  • Ih49f7zrcgangkmpcd0usx3d5odhca5vfyifmq767lk=
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Horizon Projects Pvt Ltd
  • Phone:
  • Address:
  • Runwal And Omkar Esquare
Project RERA Details
MAHA REARA No: P51700000528
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Jun 2021
Revised Possession 30 Jun 2021
Extended Possession 30 Dec 2022
Litigations No Litigations
Last Modified 25 Oct 2021
Last Retrived 13 Feb 2026
My City - Phase I - Part I QR Code
My City - Phase I - Part I
MahaRERA - P51700000528
Apartment Details & Configuration
TypeArea
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )
1 BHK35.2 Sq.mts. ( 379 Sq.ft. )
1 BHK37.26 Sq.mts. ( 401 Sq.ft. )
1 BHK37.42 Sq.mts. ( 403 Sq.ft. )
2 BHK48.9 Sq.mts. ( 526 Sq.ft. )
2 BHK51.05 Sq.mts. ( 550 Sq.ft. )
SH113.61 Sq.mts. ( 146 Sq.ft. )
SH29.92 Sq.mts. ( 107 Sq.ft. )
SH39.28 Sq.mts. ( 100 Sq.ft. )
SH418.78 Sq.mts. ( 202 Sq.ft. )
SH59.94 Sq.mts. ( 107 Sq.ft. )
SH610.55 Sq.mts. ( 114 Sq.ft. )
2 BHK47.57 Sq.mts. ( 512 Sq.ft. )
2 BHK50.3 Sq.mts. ( 541 Sq.ft. )
2 BHK46.24 Sq.mts. ( 498 Sq.ft. )
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )
2 BHK48.95 Sq.mts. ( 527 Sq.ft. )
3 BHK62.89 Sq.mts. ( 677 Sq.ft. )
3 BHK65.48 Sq.mts. ( 705 Sq.ft. )
SH716.27 Sq.mts. ( 175 Sq.ft. )
SH811.05 Sq.mts. ( 119 Sq.ft. )
Shop22.83 Sq.mts. ( 246 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of My City - Phase I - Part Ilast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings100% completed
95% Complete
Completed
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management90% completed
90% Complete
Wip
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in My City - Phase I - Part I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of My City - Phase I - Part I by Horizon Projects Pvt Ltdlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

191482 Sq. ft.

Project Area

44403 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

425 apartments in total
Total
425
Booked
394
Available
31

Saleable Area Statistics (Sq. ft.)

212392 Total
Total
212392
Booked
201509
Available
10883
Total 425 apartments in project. 394 apartments booked. 92% apartments booked.
Total 212392 Sq.ft. saleable area. 201509 saleable area booked.
95% area booked.

A3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A3Dec 202028101218114
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )16
12 Booked75% Booked
75% Booked
1 BHK35.2 Sq.mts. ( 379 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.26 Sq.mts. ( 401 Sq.ft. )38
38 Booked100% Booked
100% Booked
1 BHK37.42 Sq.mts. ( 403 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK48.9 Sq.mts. ( 526 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK51.05 Sq.mts. ( 550 Sq.ft. )61
61 Booked100% Booked
100% Booked
129 total apartments / 123 apartments booked. 95% apartments booked.
Work Description in Building A3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

A4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A4Dec 202028101227107
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )54
46 Booked85% Booked
85% Booked
1 BHK35.2 Sq.mts. ( 379 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK48.9 Sq.mts. ( 526 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK51.05 Sq.mts. ( 550 Sq.ft. )3
3 Booked100% Booked
100% Booked
SH113.61 Sq.mts. ( 146 Sq.ft. )1
None Booked0% Booked
0% Booked
SH29.92 Sq.mts. ( 107 Sq.ft. )1
None Booked0% Booked
0% Booked
SH39.28 Sq.mts. ( 100 Sq.ft. )1
None Booked0% Booked
0% Booked
SH418.78 Sq.mts. ( 202 Sq.ft. )1
None Booked0% Booked
0% Booked
SH59.94 Sq.mts. ( 107 Sq.ft. )1
None Booked0% Booked
0% Booked
SH610.55 Sq.mts. ( 114 Sq.ft. )1
None Booked0% Booked
0% Booked
66 total apartments / 49 apartments booked. 74% apartments booked.
Work Description in Building A4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B2Dec 20202810124278
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.57 Sq.mts. ( 512 Sq.ft. )25
23 Booked92% Booked
92% Booked
2 BHK50.3 Sq.mts. ( 541 Sq.ft. )78
78 Booked100% Booked
100% Booked
103 total apartments / 101 apartments booked. 98% apartments booked.
Work Description in Building B2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C3Dec 20202810129109
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.24 Sq.mts. ( 498 Sq.ft. )23
23 Booked100% Booked
100% Booked
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK48.95 Sq.mts. ( 527 Sq.ft. )31
31 Booked100% Booked
100% Booked
2 BHK50.3 Sq.mts. ( 541 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK62.89 Sq.mts. ( 677 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK65.48 Sq.mts. ( 705 Sq.ft. )18
18 Booked100% Booked
100% Booked
103 total apartments / 103 apartments booked. 100% apartments booked.
Work Description in Building C3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C4Dec 20202010123882
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.24 Sq.mts. ( 498 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK62.89 Sq.mts. ( 677 Sq.ft. )19
18 Booked94% Booked
94% Booked
SH716.27 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
SH811.05 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.83 Sq.mts. ( 246 Sq.ft. )1
None Booked0% Booked
0% Booked
24 total apartments / 18 apartments booked. 75% apartments booked.
Work Description in Building C4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Horizon Projects Pvt Ltd
for Project
My City - Phase I - Part I
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation