Project overview

Nakshatra is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002370. Nakshatra is located at V. N. Purav Marg, Chembur, Chembur. This is a On-Going Project being developed by Metro Developers Co..

Nakshatra has 2 BHK Apartments with carpet areas ranging from 634 to 768 Sq.ft. Carpet. The Project has total 36 of which 6 are currently available for sale.

Nakshatra is being developed on a total land area of 8380 Sq.ft. Nakshatra has 3 Wings / Towers Phase 1 - Ground To 2Nd Floor,Phase 2- 3Rd To 6Th Floor,Phase 3- 7Th To 12Th Floor

ProjectDeveloperLocationPossession
PanoramaEkta Shubham VentureTrombay Road, Chembur, Chembur31-12-2019 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.Mumbai Suburban, 40007111-03-2011 00:00:00
Harvest MoonCalvin Properties14Th Road, Chembur, Chembur31-12-2019 00:00:00
Sabari Palm ViewSabari Developers LlpNear Diamond Garden, Chembur, Chembur31-05-2018 00:00:00
Trishabh SignetDimension Housing Realty LlpD. K. Sandu Marg, Chembur East, Chembur East31-12-2016 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction CompanyMumbai Suburban, 40007131-12-2018 00:00:00
Skyline Sparkle Wing C Skyline GreathillsMumbai Suburban, 40007831-12-2018 00:00:00
Amrita PriveSkree Krishna Properties12Th Road, Chembur, Chembur30-06-2019 00:00:00
StevelandCalvin Properties10Th Road, Chembur, Chembur31-12-2020 00:00:00
Veena SerenityVeena Realcon Private LimitedSahakar Nagar Road No.3, Chambur, Chambur01-12-2020 00:00:00
LegranzEkta Shubham VentureChembur, Chembur31-12-2017 00:00:00
OrionNivaan Infratech Private LimitedMumbai Suburban, 40007131-12-2017 00:00:00
Redevelopment Of Gkw Sankey Employees ChslHeritage Lifestyles &Amp; Developers Pvt. Ltd.EMumbai Suburban, 40007831-05-2019 00:00:00
SovenirSuncity CorporationMumbai Suburban, 40007831-08-2016 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles &Amp; Developers Pvt.Ltd.Road No 21, Chembur, Chembur31-12-2019 00:00:00
CelestialSu Sharda Edifice LlpKurla, Kurla31-12-2017 00:00:00
AbhilashSanjona BuildersMumbai Suburban, 40007130-12-2017 00:00:00
Pearl BellezaChembur Hotels Private LimitedD K Sandu Marg, Chembur, Chembur31-08-2017 00:00:00
GeetanjaliKukreja Construction CoMumbai Suburban, 40007131-12-2017 00:00:00
Srishti SolitaireSiddhivinayak EnterpriseMumbai Suburban, 40007831-12-2017 00:00:00
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Mumbai Suburban, 40007123-05-2021 00:00:00
Chembur Heights IiKukreja Construction CoMumbai Suburban, 40007131-03-2018 00:00:00
Tridhaatu Bhaveshwar VilasTridhaatu Bhaveshwar Developers Llp17Th Road, Chembur, Chembur31-10-2018 00:00:00
Aayush PoornimaAayush DevelopersSwastik Park, Chembur, Chembur31-12-2018 00:00:00
Siddhi GarimaNha Infraprojects Private LimitedChembur, Chembur31-12-2018 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.Irla Society Road, Vile Parle (West), Vile Parle (West)31-12-2019 00:00:00
Shrikant Chembers IiShrikant Studios Pvt. Ltd.Mumbai Suburban, 40007131-03-2022 00:00:00
Maa KamalVirat BuildersMumbai Suburban, 40007101-04-2012 00:00:00
Arya HeightsRishabh EnterprisesMaharashtra, Bhandup, Bhandup31-12-2019 00:00:00
Parvati SadanMeena Builder Unit Of V N Raikar Huf15Th Road, Plot No 49A Parvati Sadan Front Of Dhanlaxmi Bank Chembur Mumbai, Plot No 49A Parvati Sadan Front Of Dhanlaxmi Bank Chembur Mumbai30-06-2021 00:00:00
Marvel Gold - Phase Ii - ColloseumSwaroop Constructions Private LimitedTank Road, Harijan Colony Valmiki Nagar, Harijan Colony Valmiki Nagar30-12-2022 00:00:00
Vighnaharta Sra Chs LtdParsn Construction And Developers Private LimitedSiddharth Colony Road, Paralkarwadi Village Chembur Taluka Kurla, Paralkarwadi Village Chembur Taluka Kurla30-12-2024 00:00:00
KailasaDevnani DevelopersSindhi Soc., Chembur West, Chembur West30-06-2021 00:00:00
OdinaRajyog EnterpriseSion Trombay, Chembur, Chembur30-06-2017 00:00:00
Tirupati HeightTirupati DeveloperMumbai Suburban, 40007831-05-2018 00:00:00
Business PointPoint Developers Pvt. LtdD.K. Sandu Marg, Chembur, Chembur31-12-2016 00:00:00
Zen ApartmentsBholenath Developers Ltd.Mumbai Suburban, 40007116-09-2016 00:00:00
Simran HeightsVikas RaikarW.T. Patil Marg, Govandi, Govandi20-03-2019 00:00:00
Hubtown Seasons - I WingJoynest Premises Private LimitedRc Chemburkar Marg, Chembur, Chembur31-12-2023 00:00:00
NakshatraMetro Developers Co.V. N. Purav Marg, Chembur, Chembur31-12-2020 00:00:00
Hubtown Seasons - DaintreeJoynest Premises Private LimitedR. Chemburkar Marg, Chembur East, Chembur East31-12-2020 00:00:00
Trishabh Greens - Wing ARishabh EnterprisesOff R C Marg, Chembur Naka, Chembur East, Chembur Naka, Chembur East30-12-2025 00:00:00
Trishabh Greens - Wing BRishabh EnterprisesOff R C Marg, Chembur Naka, Chembur East, Chembur Naka, Chembur East30-12-2025 00:00:00
Meraki ArenaMeraki Habitats LlpChembur, Chembur31-12-2018 00:00:00
VastukalpNhk Developers LlpBhandup Village Road, Bhandup West, Bhandup West31-12-2023 00:00:00
Castle PeakInnerspaceMumbai Suburban, 40007130-11-2017 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedLbs Marg, Bhandup (W), Bhandup (W)29-02-2020 00:00:00
Altavista - Phase 2Spenta Enclave Private LimitedMumbai Suburban, 40007131-12-2019 00:00:00
Altavista - Phase 1Spenta Enclave Private LimitedMumbai Suburban, 40007131-05-2018 00:00:00
Chembur Manshanti ChslMenorah Realties Private LimitedMumbai Suburban, 40007131-12-2014 00:00:00
Jay KrishnaShreegoandevi Enterprises Private LimitedJangal Mangal Road, Jangal Mangal Road31-12-2022 00:00:00
M M SpectraM. M. Developers - ShramjiviMumbai Suburban, 40007131-12-2014 00:00:00
Saffron Residency Phase -1Ayodhya Construction CoS G Barve Marg, Kurla, Kurla31-10-2018 00:00:00
Hari Kunj IiiKukreja Construction CoMumbai Suburban, 40007131-12-2014 00:00:00
Stella Sapphire A WingVaibhavlaxmi Builders And DevelopersKannamwar Nagar 1, Vikhroli East, Vikhroli East31-12-2017 00:00:00
Srinivas BuildingArjun Development &Amp; Construction ( India ) Private LimitedMumbai Suburban, 40007131-12-2019 00:00:00
RudrakshSandu DevelopersMumbai Suburban, 40007107-11-2015 00:00:00
Shraddha InfinityShraddha Landmark Private LimitedMumbai Suburban, 40007831-12-2017 00:00:00
Neptune FlorenciaSachin M Deshmukh And Nayan A Bheda (Aop)Pk Road, Mulund West, Mulund West31-12-2018 00:00:00
Natekar HeightsSabari Developers Llp11Th Road, Chembur, Chembur31-05-2019 00:00:00
Arham AumMahavir EnterprisesMumbai Suburban, 40007130-11-2017 00:00:00
ZynergyMaa Ashapura DevelopersLal Dongar Road, Lal Dongar, Lal Dongar31-12-2017 00:00:00
Signature Business ParkSwastik DevelopersPostal Colony Road, Chembur, Chembur30-06-2016 00:00:00
Orchid CourtPranjee Properties Pvt. Ltd.Mumbai Suburban, 40007130-12-2014 00:00:00
Suvidha SolitairePremier Infotech Pvt LtdMumbai Suburban, 40007131-12-2027 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private LimitedR. Chemburkar Marg, Chembur East, Chembur East31-12-2021 00:00:00
Ruparel OrionK D Lite Developers Pvt LtdWestern Express, Chembur, Chembur31-12-2017 00:00:00
ShivblissRushi Builder &Amp; DeveloperMumbai Suburban, 40007831-07-2018 00:00:00
Udaya BhuvanShree Krishna Homes Pvt LtdChembur, Chembur31-03-2019 00:00:00
JaihindS.P. Erectors And Developers Private LimitedShell Colony Road, Chembur, Chembur30-06-2024 00:00:00
The Golf Boulevard Building - 1Empress &Amp; Adishakti JvChembur, Chembur30-06-2021 00:00:00
Chaurang ShraddhaM/S. Chaurang DevelopersMumbai Suburban, 40007131-05-2017 00:00:00
Happy Home C WingEntee DevelopersMumbai Suburban, 40007831-12-2019 00:00:00
RajeswariShree Krishna Homes Pvt LtdMumbai Suburban, 40007131-12-2017 00:00:00
Le JardinJay Construction IndiaMumbai Suburban, 40007129-02-2012 00:00:00
Krishna NiwasShree Krishna Homes Pvt LtdMumbai Suburban, 40007130-11-2017 00:00:00
Hubtown Seasons CzarnowoJoynest Premises Private LimitedRc Chemburkar Marg, Chembur, Chembur30-06-2017 00:00:00
Sabari AshvilleSabari Jani AssociatesN B Patil Marg, Chembur, Chembur31-03-2017 00:00:00
ApurvaSidhivinayak ConstructionsKurla, Kurla31-03-2018 00:00:00
SamaraCharisma Builders LtdV. N. Purav Marg, Chembur, Mumbai, Chembur, Mumbai30-03-2024 00:00:00
SriniketanMajestic Royale Developers14Th Road, Chembur, Chembur30-12-2022 00:00:00
Trishabh Greens - Wing CRishabh EnterprisesOff R C Marg, Chembur East, Chembur East30-06-2027 00:00:00
Gaodevi Krupa Darshan Sra Chs LtdShivshankar Singh &Amp; OthersSanman Singh Marg, Bhandup (West), Bhandup (West)31-12-2022 00:00:00
Krishvi ResidencyShagun Chembur (Aop)V N Purav Marg, Chembur, Chembur31-12-2018 00:00:00
Stella Sapphire B WingVaibhavlaxmi Builders And DevelopersMumbai Suburban, 40007131-12-2017 00:00:00
Project Details
  • Project:
    Nakshatra
  • Location:
  • V. N. Purav Marg, Chembur, Chembur
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2020
Developer Details

  • Developer:
    Metro Developers Co.
  • Phone:
  • Address:
  • Unit No.301 &Amp; 302, The Ambience Court, Plot No.2, Sector 19D, Opp. Vashi R.T.O., Vashi, 400703
Project RERA Details
MAHA REARA No: P51800002370
Project Type Others
RERA Project Status On-Going Project
Architect Amit N .Patil Architects
Funding Bank State Bank of India
Proposed Possession 31 Dec 2020
Revised Possession 30 Mar 2022
Extended Possession 30 Mar 2023
Litigations Yes
Last Modified 01 Jul 2023
Last Retrived 15 Jan 2025
Nakshatra QR Code
Nakshatra
MahaRERA - P51800002370
Apartment Details & Configuration
TypeArea
2 BHK58.92 Sq.mts. ( 634 Sq.ft. )
2 BHK59.31 Sq.mts. ( 638 Sq.ft. )
2 BHK67.94 Sq.mts. ( 731 Sq.ft. )
4 BHK119.86 Sq.mts. ( 1290 Sq.ft. )
Shop620.52 Sq.mts. ( 221 Sq.ft. )
Shop723.65 Sq.mts. ( 255 Sq.ft. )
2 BHK71.33 Sq.mts. ( 768 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nakshatralast updated on 15 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
In Later Stage
Energy management
Na
Fire Protection And Fire Safety Requirements
In Later Stage
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
In Later Stage
Solid Waste Management And Disposal
Na
Storm Water Drains
In Later Stage
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
In Later Stage
Water Supply
In Later Stage
Buildings / Wings in Nakshatra
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nakshatra by Metro Developers Co.last updated on 15 Jan 2025 as per information obtained from MARA RERA.

8380 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

36 apartments in total
Total
36
Booked
30
Available
6

Saleable Area Statistics (Sq. ft.)

24035 Total
Total
24035
Booked
19473
Available
4563
Total 36 apartments in project. 30 apartments booked. 83% apartments booked.
Total 24035 Sq.ft. saleable area. 19473 saleable area booked.
81% area booked.

Phase 1 - Ground To 2Nd Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Phase 1 - Ground To 2Nd FloorSep 202131010015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.92 Sq.mts. ( 634 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK59.31 Sq.mts. ( 638 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.94 Sq.mts. ( 731 Sq.ft. )2
1 Booked50% Booked
50% Booked
4 BHK119.86 Sq.mts. ( 1290 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop620.52 Sq.mts. ( 221 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop723.65 Sq.mts. ( 255 Sq.ft. )1
1 Booked100% Booked
100% Booked
7 total apartments / 4 apartments booked. 57% apartments booked.
Work Description in Building Phase 1 - Ground To 2Nd FloorCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Phase 2- 3Rd To 6Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Phase 2- 3Rd To 6Th FloorSep 202140000018
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.92 Sq.mts. ( 634 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK59.31 Sq.mts. ( 638 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK67.94 Sq.mts. ( 731 Sq.ft. )4
4 Booked100% Booked
100% Booked
12 total apartments / 11 apartments booked. 91% apartments booked.
Work Description in Building Phase 2- 3Rd To 6Th FloorCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Phase 3- 7Th To 12Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Phase 3- 7Th To 12Th FloorSep 202160000015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.92 Sq.mts. ( 634 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK59.31 Sq.mts. ( 638 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK67.94 Sq.mts. ( 731 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK71.33 Sq.mts. ( 768 Sq.ft. )1
1 Booked100% Booked
100% Booked
17 total apartments / 15 apartments booked. 88% apartments booked.
Work Description in Building Phase 3- 7Th To 12Th FloorCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Metro Developers Co.
for Project
Nakshatra
last updated on 15 Jan 2025 as per information obtained from MARA RERA.