Project overview

Orion -3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006838. Orion -3 is located at Vijay Vilas Road, Village Kavesar, Ghodbunder Road, Village Kavesar, Ghodbunder Road. This is a On-Going Project being developed by Vijay Suraksha Realty Llp.

Orion -3 has 1 BHK, 2 BHK, 3 BHK & 4 BHK Apartments with carpet areas ranging from 1214 to 975 Sq.ft. Carpet. The Project has total 73 of which 60 are currently available for sale.

Orion -3 is being developed on a total land area of 5877 Sq.ft. Orion -3 has 1 Wings / Towers Orion-3

ProjectDeveloperLocationPossession
Simone ResidencyM R M DevelopersKalyan, Daighar Village, Daighar Village30-12-2022 00:00:00
Delta WoodsDelta VentureMira Midc Road, Mira Road, Mira Road30-09-2023 00:00:00
Shreeji LandmarkVinayak DevelopersGodrej Hill Road, Khadakpada, Khadakpada30-12-2029 00:00:00
Hyde Park Residency F6 Building PhaseNexus Builders And Developers Pvt LtdOff Ghod Bunder Rd, Nr Hiranandani Meadows, Nr Hiranandani Meadows30-12-2021 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt LtdGhod Bunder Road, Nr. Hiranandani Meadows, Nr. Hiranandani Meadows30-12-2021 00:00:00
Hyde Park Residency F5 Building PhaseNexus Builders And Developers Pvt LtdTulsidham Road, Nr Hiranandani Meadows, Nr Hiranandani Meadows30-09-2023 00:00:00
Arihant City Phase-Ii - N BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
Arihant City Phase-Ii - K BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad Bhiwandi, Bhadwad Bhiwandi30-06-2026 00:00:00
Arihant City Phase-Ii - M BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
The Icon Phase 1Leading Frontier Private LimitedHighlands Garden Road, Dhokali, Dhokali30-12-2022 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyBalkum Road, Balkum, Balkum31-12-2022 00:00:00
Vardhman VatikaDiwali DevelopersGhodbunder Road, Thane, Thane31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedMankivili Road, Mankivili, Mankivili30-12-2023 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private LimitedVillage Panchpakhadi, Pokharan Road No.2, Subhash Nagar, Thane- West, Subhash Nagar, Thane- West, Village Panchpakhadi31-12-2027 00:00:00
Umiya Nakshatra HeightsM/S. Jigar EnterpriseKarjat Badlapur By Pass Road, Katrap Badlapur E, Katrap Badlapur E31-12-2027 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private LimitedOld Mumbai Pune Highway, Shilphata Junction, Thane, Shilphata Junction, Thane31-12-2022 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedMidc Road, Mankivali, Mankivali31-12-2018 00:00:00
Iris ShoppingHiranandani Properties Private LimitedPokhran Road No Ii, Hiranandani Meadows, Hiranandani Meadows30-03-2023 00:00:00
Krishna Vihar Co-Operative Housing Society LimitedBal Ganapati Laabh DevelopersRam Maruti Road, Naupada, Naupada30-12-2021 00:00:00
Arihant City Phase-Ii - L BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
Om ShikharVaidik DevelopersDiva Vasai Railway Track Road, Juni Dombivli, Juni Dombivli01-05-2022 00:00:00
Gnp ArcadiaPriva InfraconDombivli Industrial Area, Midc, Dombivli, Midc, Dombivli31-01-2021 00:00:00
Paramount BKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-06-2024 00:00:00
SanyogAditya AssociatesRam Ganesh Gadkari Cross Road, Naupada, Naupada30-06-2023 00:00:00
Sachinam Co Op Hsg SocietyShreekanth DevelopersGaondevi Road, Kulgaon, Kulgaon31-03-2024 00:00:00
Krishna KunjShashank C Mishra HufB K No A-513, Room No 1026, Cts No 18726, Sheet No 16, Ulhasnagar, Ulhasnagar, B K No A-513, Room No 1026, Cts No 1872631-12-2023 00:00:00
Yashanand Chsl Ojass ConstructionsOjass ConstructionsGovind Bacchaji Road, Charai Thane West, Charai Thane West30-03-2022 00:00:00
Orion - Northern LightsJaykali Developers Private LimitedPokharan Road No. 2, Village Panchpakhadi, Subhash Nagar, Thane (West), Thane (West), Pokharan Road No. 2, Village Panchpakhadi30-03-2025 00:00:00
Omega - Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane (West), Subhash Nagar, Thane (West), Pokharan Road No.230-03-2025 00:00:00
Royal EmpireSai Pooja ConstructionsBoradpada Road, Badlapur, Badlapur30-12-2024 00:00:00
Guru SakshatSadguru EnterprisesB Cabin Road, Siddhivinayak Nagar, Siddhivinayak Nagar30-12-2025 00:00:00
Poddar Wondercity Phase - ViPoddar Housing And Development Limited-, Joveli Vilalge, Joveli Vilalge30-06-2024 00:00:00
Poddar Wondercity Phase - IiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2022 00:00:00
Poddar Wondercity Phase - IPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2023 00:00:00
Poddar Wondercity Phase - IiiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2024 00:00:00
Poddar Wondercity Phase - IvPoddar Housing And Development Limited-, Joveli Village, Joveli Village31-07-2023 00:00:00
Poddar Wondercity Phase - VPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2024 00:00:00
Lodha Amara - Wing 40 And 41Macrotech Developers LimitedSector 5, Balkum, Balkum29-11-2024 00:00:00
Palava Serenity APalava Dwellers Private LimitedKalyan Sheel Phata Road, Palava, Palava28-11-2025 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.Pokhran Road No 2, Pokhran Road 2, Pokhran Road 202-10-2026 00:00:00
Teri KudratVishnu BadlaniNear Prabhat Garden, Opp Menka Apartment, Opp Menka Apartment31-10-2024 00:00:00
Kanha ResidencyKulkarnii BuilderFatima School Road, Belavali Gaon, Belavali Gaon14-05-2025 00:00:00
Upper Thane -Sereno A1Macrotech Developers Limited.31-07-2024 00:00:00
Asmeeta Texpa - IiMagus Infratech Private LimitedKalyan Bhiwandi Road, Additional Kalyan Bhiwandi Industrial Area, Additional Kalyan Bhiwandi Industrial Area30-12-2030 00:00:00
Janki LegacyNandkumar PapaiyaRamdev Park Road, Mira Road East, Mira Road East22-04-2026 00:00:00
Raj Height A WingBhavani EnterprisesLodha Heaven, Shirgoan, Shirgoan31-12-2019 00:00:00
Oyster - Shapoorji Pallonji Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane West, Village Panchpakhadi, Subhash Nagar, Thane West30-09-2025 00:00:00
Rental Building A-1 R2Sonam BuildersNew Golden Nest Phase Xiii, Bhayander East, Bhayander East31-12-2019 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private LimitedThane, 40060131-12-2022 00:00:00
Highland Springs B4- A WingSiddhi Real Estate DevelopersUniversity Road, Dhokali, Dhokali30-06-2020 00:00:00
Gajanan Samruddhi Phase Ii C WingShree Gajanan Developers100 Feet Road, Khadegolavali, Khadegolavali30-12-2023 00:00:00
Jasmine TPalava Dwellers Pvt LtdKalyan Shilphata Road, Palava, Palava30-03-2023 00:00:00
Jasmine A, B, C, G, H And IPalava Dwellers Pvt Ltd.30-03-2023 00:00:00
Amanda ShoppingHiranandani Properties Private LimitedPokhran Road No Ii, Hiranandani Meadows, Hiranandani Meadows31-12-2019 00:00:00
Saptashree HeightsSaptashree Reality Private LimitedThane, 40060231-10-2017 00:00:00
IrisHiranandani Properties Private LimitedOff: Pokhran Road No Ii, Hiranandani Meadows, Hiranandani Meadows31-12-2019 00:00:00
The EmpressUnique Shanti Developers LlpBehind Latif Park, Opp. Mig Colony,, Mira Road (East), Dist. Thane, Mira Road (East), Dist. Thane, Behind Latif Park, Opp. Mig Colony30-03-2023 00:00:00
Lotus ParkReal EnterpriseShahpur, Shahpur30-12-2022 00:00:00
Raviraj ApartmentRajendra GhorpadeGanesh Nagar Road, Ganesh Nagar, Ganesh Nagar30-12-2022 00:00:00
Krupa SindhuAshish GoleKulgaon, Kulgaon28-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesDr Agaskar Road, Naupada, Naupada30-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyShirgaon, Badlapur, Badlapur30-09-2019 00:00:00
Mauli MadhusudhanRameshwar PatilVasundari Road, Near Siddeshwar Hospital, Near Siddeshwar Hospital30-03-2023 00:00:00
Salangpur NirmanSalangpur NirmanRamdev Park Road, Mira Road East, Mira Road East30-12-2022 00:00:00
Golden Hills B- 3Vihang EnterprisesG.B. Road, Thane, Bhayenderpada, Bhayenderpada, G.B. Road30-12-2024 00:00:00
Classic ResidencyClassic ConstructionPanna Compound, New Kaneri, New Kaneri30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersKhadapada Road, Khadakpada, Khadakpada30-03-2026 00:00:00
Jai MatadeeAaradhana DevelopersBhaskar Colony, Bhaskar Colony31-12-2017 00:00:00
One Indiabulls Thane - 1Tapir Constructions LimitedPokharan Road No 2, Thane, Thane29-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited.31-12-2020 00:00:00
Evana D-2Vihang Infrastructure Pvt LtdGb Cross Road Thane, Thane, Thane31-12-2029 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai, Ambernath, Ambernath31-12-2025 00:00:00
Trinity MokshRattanraj LifespacesNxt To Shiv Mandir Road, Palegaon, Palegaon31-03-2025 00:00:00
Ganesh BhuvanMagnum HomesHitavardhani Path, Naupada, Naupada30-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresJuveli, Juveli30-06-2025 00:00:00
Sheth Cnergy Ph 1 - Upto 11Th FloorSheth Developers Private LimitedEastern Express Highway, Panch Pakhadi, Panch Pakhadi30-12-2023 00:00:00
Paramount EKalpataru Homes Private LimitedMajiwada, Thane, Thane30-06-2025 00:00:00
Suyog ApartmentTelange Builders &Amp; Developers Private LimitedSai Section, Sai Section30-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction-, Pendse Nagar, Pendse Nagar30-06-2023 00:00:00
Sarthi ElanzaSarthi DevelopersKalyan Shil Road, Near Shivam Hospital, Near Shivam Hospital31-10-2023 00:00:00
Spm Dream City Phase 1D K BuildconVillage Pali, Village Pali31-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-06-2025 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt LtdDiva Manpada Road, Usarghar Dombivali, Usarghar Dombivali31-12-2027 00:00:00
Baliram Tare ResidencyTare Group Builders And DevelopersTulja Bhavani Mandir Road, Chinchpada Gaon, Chinchpada Gaon31-12-2025 00:00:00
Om Ashish ChsGreen Heights InfraChurch Road, Ganesh Nagar, Ganesh Nagar31-12-2025 00:00:00
Shiv Ganga ApartmentShree Swami Samarth ConstructionSatramdas, Ulhasnagar, Ulhasnagar31-12-2024 00:00:00
Shivsai ParadiseBharat Agri Fert &Amp; Realty LimitedMajiwada Village Road, Thane West, Thane West31-12-2027 00:00:00
RubaShreyas EnterprisesRam Maruti Road, Ram Maruti Road31-03-2020 00:00:00
Madhu VillaShree Krishna EnterprisesChikanghar, Chikanghar30-12-2022 00:00:00
Shapoorji Pallonji The Impulse- Phase 1Jaykali Developers Private LimitedPokharan Road No. 2, Village Panchpakhadi, Subhash Nagar, Pokharan Road No.2, Thane- West, Village Panchpakhadi, Subhash Nagar, Pokharan Road No.2, Thane- West30-06-2024 00:00:00
Seven Eleven CourtyardS.S.S AssoicatesMira Bhaynder Road, Goddev, Goddev30-11-2025 00:00:00
Project Details
  • Project:
    Orion -3
  • Location:
  • Vijay Vilas Road, Village Kavesar, Ghodbunder Road, Village Kavesar, Ghodbunder Road
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2016
Developer Details

  • Developer:
    Vijay Suraksha Realty Llp
  • Phone:
  • Address:
  • 205, Marine Chambers, 43, New Marine Lines, Opp Sndt College, Churchgate, 400020
Project RERA Details
MAHA REARA No: P51700006838
Project Type Residential
RERA Project Status On-Going Project
Architect M/S. Dimensions Architects Pvt Ltd
Funding Bank ICICI Bank
Proposed Possession 31 Dec 2016
Revised Possession 30 Dec 2020
Extended Possession 30 Oct 2021
Litigations Yes
Last Modified 03 Feb 2022
Last Retrived 16 Jan 2025
Orion -3 QR Code
Orion -3
MahaRERA - P51700006838
Apartment Details & Configuration
TypeArea
1 BHK82.96 Sq.mts. ( 893 Sq.ft. )
2 BHK90.54 Sq.mts. ( 975 Sq.ft. )
3 BHK112.79 Sq.mts. ( 1214 Sq.ft. )
4 BHK174.63 Sq.mts. ( 1880 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Orion -3last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Common Amenities like Gym Common room containing mirror wooden flooring for yoga or meditation Room65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Community Buildings100% completed
95% Complete
Club House Completed &Amp; Shared By Entire Layout
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Elec. Meterroom Prop &Amp; Substation Shared By Layout
Energy management50% completed
50% Complete
Energy Efficient Lights &Amp; Dg Backup In Commonarea
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc.
Games room with carrom chess and cards65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Guest rooms and Recreational Hall65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Landscaping & Tree Planting90% completed
90% Complete
Shared By Entire Layout
Open Parking
Na
Reading room and Senior Citizen area small area and childproof room with soft rubber flooring65% completed
65% Complete
At 3Rd Recreation Flr. &Amp; Common For All Orion Bldg
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Common Stp Is Given And Shared By Entire Layout
Society Office50% completed
50% Complete
As Approved By Tmc
Solid Waste Management And Disposal100% completed
95% Complete
Owc Is Provided &Amp; Shared By All Orion Buildings
Storm Water Drains100% completed
95% Complete
To Be Given As Approved By Tmc
Street Lighting90% completed
90% Complete
To Be Given As Approved By Tmc
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Water Shall Be Used For Flushing &Amp; Gardening
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rwh Pit To Be Given As Approved By Tmc
Water Supply100% completed
95% Complete
Water Connection To Be Given By Tmc After Oc.
Buildings / Wings in Orion -3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Orion -3 by Vijay Suraksha Realty Llplast updated on 16 Jan 2025 as per information obtained from MARA RERA.

5877 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

73 apartments in total
Total
73
Booked
13
Available
60

Saleable Area Statistics (Sq. ft.)

94127 Total
Total
94127
Booked
19111
Available
75016
Total 73 apartments in project. 13 apartments booked. 17% apartments booked.
Total 94127 Sq.ft. saleable area. 19111 saleable area booked.
20% area booked.

Orion-3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Orion-3Jun 20202410130161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK82.96 Sq.mts. ( 893 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK90.54 Sq.mts. ( 975 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHK112.79 Sq.mts. ( 1214 Sq.ft. )42
4 BHK174.63 Sq.mts. ( 1880 Sq.ft. )15
5 Booked33% Booked
33% Booked
73 total apartments / 13 apartments booked. 17% apartments booked.
Work Description in Building Orion-3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vijay Suraksha Realty Llp
for Project
Orion -3
last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation