Project overview

Panvelkar Estate - Stanford - Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000366. Panvelkar Estate - Stanford - Phase 1 is located at Midc Road, Mankivali, Mankivali. This is a On-Going Project being developed by Panvelkar Infrastructures Private Limited.

Panvelkar Estate - Stanford - Phase 1 has 1 BHK B, 1 BHK C & 1 BHK D Apartments with carpet areas ranging from 277 to 313 Sq.ft. Carpet. The Project has total 285 of which 0 are currently available for sale.

Panvelkar Estate - Stanford - Phase 1 is being developed on a total land area of 85036 Sq.ft. out of which 8504 Sq.ft. i.e 10% is reserved for recreational purposes. Panvelkar Estate - Stanford - Phase 1 has 3 Wings / Towers R2,R3,R4

ProjectDeveloperLocationPossession
Baliram Tare ResidencyTare Group Builders And DevelopersTulja Bhavani Mandir Road, Chinchpada Gaon, Chinchpada Gaon31-12-2025 00:00:00
Om Ashish ChsGreen Heights InfraChurch Road, Ganesh Nagar, Ganesh Nagar31-12-2025 00:00:00
Shiv Ganga ApartmentShree Swami Samarth ConstructionSatramdas, Ulhasnagar, Ulhasnagar31-12-2024 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private LimitedVillage Panchpakhadi, Pokharan Road No.2, Subhash Nagar, Thane- West, Subhash Nagar, Thane- West, Village Panchpakhadi31-12-2027 00:00:00
Umiya Nakshatra HeightsM/S. Jigar EnterpriseKarjat Badlapur By Pass Road, Katrap Badlapur E, Katrap Badlapur E31-12-2027 00:00:00
Simone ResidencyM R M DevelopersKalyan, Daighar Village, Daighar Village30-12-2022 00:00:00
Delta WoodsDelta VentureMira Midc Road, Mira Road, Mira Road30-09-2023 00:00:00
Shreeji LandmarkVinayak DevelopersGodrej Hill Road, Khadakpada, Khadakpada30-12-2029 00:00:00
Thanekar Civic Phase IiThanekar Construction LlpVadavali Gaon, Chikhloli Badlapur, Chikhloli Badlapur30-12-2024 00:00:00
Om Dattatray Chs LtdShiv Shakti DevelopersPlot No 13, Shiv Ganga Nagar, Shiv Ganga Nagar31-12-2024 00:00:00
25Hourlife - Tower B1Runwal Developers Private LimitedGhodbundar Road, Punchpakhadi, Punchpakhadi31-12-2029 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt LtdGhod Bunder Road, Nr. Hiranandani Meadows, Nr. Hiranandani Meadows30-12-2021 00:00:00
The Icon Phase 1Leading Frontier Private LimitedHighlands Garden Road, Dhokali, Dhokali30-12-2022 00:00:00
SanyogAditya AssociatesRam Ganesh Gadkari Cross Road, Naupada, Naupada30-06-2023 00:00:00
Sachinam Co Op Hsg SocietyShreekanth DevelopersGaondevi Road, Kulgaon, Kulgaon31-03-2024 00:00:00
Krishna KunjShashank C Mishra HufB K No A-513, Room No 1026, Cts No 18726, Sheet No 16, Ulhasnagar, Ulhasnagar, B K No A-513, Room No 1026, Cts No 1872631-12-2023 00:00:00
Arihant City Phase-Ii - N BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
Arihant City Phase-Ii - K BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad Bhiwandi, Bhadwad Bhiwandi30-06-2026 00:00:00
Arihant City Phase-Ii - M BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
Arihant City Phase-Ii - L BuildingArihant EnterprisesKalyan Bhiwandi Road, Bhadwad, Bhadwad30-06-2026 00:00:00
25Hourlife - Tower C1Runwal Developers Private LimitedGhodbundar Road, Panchpakhadi, Panchpakhadi31-12-2029 00:00:00
Omkarr Sindhu ResidencyBluesky RealtyKurla Camp Road, Kurla Camp, Kurla Camp31-08-2024 00:00:00
Siddhivinayak Prasad Co-Op.Housing Soc.LtdShaurya DevelopersKulgaon, Badlapur, Badlapur31-12-2026 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyBalkum Road, Balkum, Balkum31-12-2022 00:00:00
Vardhman VatikaDiwali DevelopersGhodbunder Road, Thane, Thane31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedMankivili Road, Mankivili, Mankivili30-12-2023 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private LimitedOld Mumbai Pune Highway, Shilphata Junction, Thane, Shilphata Junction, Thane31-12-2022 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedMidc Road, Mankivali, Mankivali31-12-2018 00:00:00
Ekatva CoralSynergy DevelopersGanesh Wadi Road, Pancpakhadi, Pancpakhadi31-12-2025 00:00:00
24 EastMalhar DevelopersSector 8, Sanpada, Sanpada30-06-2026 00:00:00
Harshal Co-Op Housing Society LtdVeena DevelopersHari Niwas, Hari Niwas30-09-2024 00:00:00
NandigramYogesh MahajanKabe Road, Mahagiri Kharkar Ali, Thane, Mahagiri Kharkar Ali, Thane31-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNear Platina Complex, Bhayander West, Bhayander West31-12-2027 00:00:00
Evana D-2Vihang Infrastructure Pvt LtdGb Cross Road Thane, Thane, Thane31-12-2029 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai, Ambernath, Ambernath31-12-2025 00:00:00
Gnp ArcadiaPriva InfraconDombivli Industrial Area, Midc, Dombivli, Midc, Dombivli31-01-2021 00:00:00
Paramount BKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-06-2024 00:00:00
Krishna Vihar Co-Operative Housing Society LimitedBal Ganapati Laabh DevelopersRam Maruti Road, Naupada, Naupada30-12-2021 00:00:00
Yashanand Chsl Ojass ConstructionsOjass ConstructionsGovind Bacchaji Road, Charai Thane West, Charai Thane West30-03-2022 00:00:00
Orion - Northern LightsJaykali Developers Private LimitedPokharan Road No. 2, Village Panchpakhadi, Subhash Nagar, Thane (West), Thane (West), Pokharan Road No. 2, Village Panchpakhadi30-03-2025 00:00:00
Suyog ApartmentTelange Builders &Amp; Developers Private LimitedSai Section, Sai Section30-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction-, Pendse Nagar, Pendse Nagar30-06-2023 00:00:00
Sarthi ElanzaSarthi DevelopersKalyan Shil Road, Near Shivam Hospital, Near Shivam Hospital31-10-2023 00:00:00
Omega - Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane (West), Subhash Nagar, Thane (West), Pokharan Road No.230-03-2025 00:00:00
Royal EmpireSai Pooja ConstructionsBoradpada Road, Badlapur, Badlapur30-12-2024 00:00:00
Om ShikharVaidik DevelopersDiva Vasai Railway Track Road, Juni Dombivli, Juni Dombivli01-05-2022 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.Pokhran Road No 2, Pokhran Road 2, Pokhran Road 202-10-2026 00:00:00
Teri KudratVishnu BadlaniNear Prabhat Garden, Opp Menka Apartment, Opp Menka Apartment31-10-2024 00:00:00
Ten X Era Raymond Realty Tower CRaymond LimitedPokhran Road No 1, Village Pachpakhadi, Village Pachpakhadi30-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder &Amp; DevelopersShirgaon , Badlapur, Badlapur East, Badlapur East, Shirgaon 31-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarKalyan, Ambivali, Ambivali31-12-2027 00:00:00
Guru SakshatSadguru EnterprisesB Cabin Road, Siddhivinayak Nagar, Siddhivinayak Nagar30-12-2025 00:00:00
Poddar Wondercity Phase - ViPoddar Housing And Development Limited-, Joveli Vilalge, Joveli Vilalge30-06-2024 00:00:00
Poddar Wondercity Phase - IiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2022 00:00:00
Bsc It ParkBansal Steel CorporationRoad 16A, Wagle Industrial Estate, Wagle Industrial Estate01-06-2024 00:00:00
Runwal Lands EndRunwal Construction Private LimitedKolshet Road, Kolshet, Kolshet30-06-2029 00:00:00
Bhagwan Krishna NiwasQuick DevelopersGawand Path, Naupada, Naupada01-07-2024 00:00:00
Poddar Wondercity Phase - IPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2023 00:00:00
Poddar Wondercity Phase - IiiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2024 00:00:00
Poddar Wondercity Phase - IvPoddar Housing And Development Limited-, Joveli Village, Joveli Village31-07-2023 00:00:00
Kashi Darshan B WingVarad Raj ConstructionAt Wadeghar, Near Marathi School, Saparde Road, Saparde Road, At Wadeghar20-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersRam Ganesh Gadkari Path, Talaopali, Talaopali19-01-2026 00:00:00
Narang Privado - BNarang Realty Private LimitedAcharya Atre Road, Off Pokharan Road No. 1, Off Pokharan Road No. 131-03-2028 00:00:00
Poddar Wondercity Phase - VPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2024 00:00:00
Lodha Amara - Wing 40 And 41Macrotech Developers LimitedSector 5, Balkum, Balkum29-11-2024 00:00:00
Palava Serenity APalava Dwellers Private LimitedKalyan Sheel Phata Road, Palava, Palava28-11-2025 00:00:00
Rental Building A-1 R2Sonam BuildersNew Golden Nest Phase Xiii, Bhayander East, Bhayander East31-12-2019 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private LimitedThane, 40060131-12-2022 00:00:00
Highland Springs B4- A WingSiddhi Real Estate DevelopersUniversity Road, Dhokali, Dhokali30-06-2020 00:00:00
Urban Grandeur Bldg-2Cllaro Enterprises LlpOpp. Winstone Tower, Mirabhayandar Road, Beverly Park, Miraroad E, Miraroad E, Miraroad E, Opp. Winstone Tower, Mirabhayandar Road, Beverly Park30-06-2027 00:00:00
ZenithRunwal Developers Private LimitedBalkum Road, Balkum Dhokali, Balkum Dhokali30-09-2028 00:00:00
Kanha ResidencyKulkarnii BuilderFatima School Road, Belavali Gaon, Belavali Gaon14-05-2025 00:00:00
Trinity MokshRattanraj LifespacesNxt To Shiv Mandir Road, Palegaon, Palegaon31-03-2025 00:00:00
Ganesh BhuvanMagnum HomesHitavardhani Path, Naupada, Naupada30-09-2024 00:00:00
Upper Thane -Sereno A1Macrotech Developers Limited.31-07-2024 00:00:00
Asmeeta Texpa - IiMagus Infratech Private LimitedKalyan Bhiwandi Road, Additional Kalyan Bhiwandi Industrial Area, Additional Kalyan Bhiwandi Industrial Area30-12-2030 00:00:00
Janki LegacyNandkumar PapaiyaRamdev Park Road, Mira Road East, Mira Road East22-04-2026 00:00:00
Saket ImperialNirmaan RealtySavarkar Road, Tilak Road, Tilak Road07-08-2025 00:00:00
Maruti Square Building No 7Maruti Dwellers Private LimitedMira Bhayander Road, Mira Road East, Mira Road East31-12-2027 00:00:00
Paramount FKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-09-2024 00:00:00
Urban Nest Bldg - 1Cllaro Enterprises LlpMarigold Road, Beverly Park Mira Road East, Beverly Park Mira Road East31-12-2024 00:00:00
Green SquareSquarefeet Enterprises40 M Wide Road, Kavesar Ghodbunder Road Behind D Mart, Kavesar Ghodbunder Road Behind D Mart31-12-2027 00:00:00
Raj Height A WingBhavani EnterprisesLodha Heaven, Shirgoan, Shirgoan31-12-2019 00:00:00
Oyster - Shapoorji Pallonji Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane West, Village Panchpakhadi, Subhash Nagar, Thane West30-09-2025 00:00:00
Larkins NestPride Property DevelopersGhodbunder Road, Village Wadavali, Village Wadavali31-12-2025 00:00:00
Shanti LegacyAnmol InfraMira Bhayander Road, Goddev Village, Goddev Village31-03-2025 00:00:00
Rukmani ResidencyClay Nest DevelopersAdarsh Park Road, Kasar Ali, Kasar Ali31-12-2027 00:00:00
Gajanan Samruddhi Phase Ii C WingShree Gajanan Developers100 Feet Road, Khadegolavali, Khadegolavali30-12-2023 00:00:00
Jasmine TPalava Dwellers Pvt LtdKalyan Shilphata Road, Palava, Palava30-03-2023 00:00:00
Jasmine A, B, C, G, H And IPalava Dwellers Pvt Ltd.30-03-2023 00:00:00
Sheth Cnergy Ph 1 - Upto 11Th FloorSheth Developers Private LimitedEastern Express Highway, Panch Pakhadi, Panch Pakhadi30-12-2023 00:00:00
Paramount EKalpataru Homes Private LimitedMajiwada, Thane, Thane30-06-2025 00:00:00
Nirman SignatureShree Sha DevelopersBoradpada Road, Badlapur (W), Badlapur (W)31-03-2026 00:00:00
Hcs HorizonHcs Realtors LlpKanakia Road, Mira Road East, Mira Road East31-12-2026 00:00:00
Maplewoods Phase 1M/S Bks Galaxy Realtors LlpGut No. 51(2) 56 And 57(2), Dighe, Dighe31-12-2028 00:00:00
Audumber Flower ValleyAudumber SuperstructuresJuveli, Juveli30-06-2025 00:00:00
Spm Dream City Phase 1D K BuildconVillage Pali, Village Pali31-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-06-2025 00:00:00
Project Details
  • Project:
    Panvelkar Estate - Stanford - Phase 1
  • Location:
  • Midc Road, Mankivali, Mankivali
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Panvelkar Infrastructures Private Limited
  • Phone:
  • Address:
  • 1St Floor, Nandi Commercial Complex, Station Road, Near Dns Bank, Shiv Dham, 421501
Project RERA Details
MAHA REARA No: P51700000366
Project Type Residential
RERA Project Status On-Going Project
Architect Sameer Durve Architects
Funding Bank ICICI BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 04 May 2022
Last Retrived 18 Jan 2025
Panvelkar Estate - Stanford - Phase 1 QR Code
Panvelkar Estate - Stanford - Phase 1
MahaRERA - P51700000366
Apartment Details & Configuration
TypeArea
1 BHK25.69 Sq.mts. ( 277 Sq.ft. )
1 BHK27.78 Sq.mts. ( 299 Sq.ft. )
1 BHK27.86 Sq.mts. ( 300 Sq.ft. )
1 BHK D29.11 Sq.mts. ( 313 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Panvelkar Estate - Stanford - Phase 1last updated on 18 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Electrical Meter Room Proposed
Energy management
Na
Fire Protection And Fire Safety Requirements80% completed
80% Complete
In Progress
Landscaping & Tree Planting80% completed
80% Complete
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Stp Provided
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
0
Street Lighting90% completed
90% Complete
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply
0
Buildings / Wings in Panvelkar Estate - Stanford - Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Panvelkar Estate - Stanford - Phase 1 by Panvelkar Infrastructures Private Limitedlast updated on 18 Jan 2025 as per information obtained from MARA RERA.

85036 Sq. ft.

Project Area

8504 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

285 apartments in total
Total
285
Booked
285
Available
0

Saleable Area Statistics (Sq. ft.)

82455 Total
Total
82455
Booked
82455
Available
0
Total 285 apartments in project. 285 apartments booked. 100% apartments booked.
Total 82455 Sq.ft. saleable area. 82455 saleable area booked.
100% area booked.

R2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R2Dec 201813101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.69 Sq.mts. ( 277 Sq.ft. )47
47 Booked100% Booked
100% Booked
1 BHK27.78 Sq.mts. ( 299 Sq.ft. )24
24 Booked100% Booked
100% Booked
1 BHK27.86 Sq.mts. ( 300 Sq.ft. )24
24 Booked100% Booked
100% Booked
95 total apartments / 95 apartments booked. 100% apartments booked.
Work Description in Building R2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

R3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R3Dec 201813101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A27.78 Sq.mts. ( 299 Sq.ft. )24
24 Booked100% Booked
100% Booked
1 BHK B25.69 Sq.mts. ( 277 Sq.ft. )47
47 Booked100% Booked
100% Booked
1 BHK C27.86 Sq.mts. ( 300 Sq.ft. )24
24 Booked100% Booked
100% Booked
95 total apartments / 95 apartments booked. 100% apartments booked.
Work Description in Building R3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

R4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R4Dec 201813101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK B25.69 Sq.mts. ( 277 Sq.ft. )47
47 Booked100% Booked
100% Booked
1 BHK C27.86 Sq.mts. ( 300 Sq.ft. )24
24 Booked100% Booked
100% Booked
1 BHK D29.11 Sq.mts. ( 313 Sq.ft. )24
24 Booked100% Booked
100% Booked
95 total apartments / 95 apartments booked. 100% apartments booked.
Work Description in Building R4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Panvelkar Infrastructures Private Limited
for Project
Panvelkar Estate - Stanford - Phase 1
last updated on 18 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation