Project overview

Parmarth Niketan - Redevelopment Of Mani Bhuvan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001745. Parmarth Niketan - Redevelopment Of Mani Bhuvan is located at J6dguqag5bty4najjzysdvptuaexypzy5bloetwwd80=. This is a Ongoing being developed by J V Constructions & Developers.

Parmarth Niketan - Redevelopment Of Mani Bhuvan has 1 BHK & 2 BHK Apartments with carpet areas ranging from 331 to 553 Sq.ft. Carpet. The Project has total 51 of which 26 are currently available for sale.

Parmarth Niketan - Redevelopment Of Mani Bhuvan is being developed on a total land area of 8666 Sq.ft. Parmarth Niketan - Redevelopment Of Mani Bhuvan has 1 Wings / Towers Parmarth Niketan - Redevelopment Of Mani Bhuvan

ProjectDeveloperLocationPossession
Ashtavinayak NxAshtavinayak InfrastructureUmmfxwidvtcdgy0zl4p75cjkqltugqi6szkwd3bi91q=31-03-2019 00:00:00
A And O EminenteAshapura Housing Private Limited400068, Mumbai Suburban31-12-2021 00:00:00
Rakhi Tower Phase 1Western DevelopmentsGvw2geojwue7eaj/O27j/Ggafjos6tc40t5xk5hw12u=21-12-2019 00:00:00
Radha Madhav ChslShri Krishna Chaitanya EnterprisesO0z0ympgvzxvjzjjgelmag==30-09-2018 00:00:00
New Tashkent Terrace ChslAmar AssociatesKbamhlwzojcix0nfkf6m6a==01-10-2018 00:00:00
Shri Vallabh ResidencySwadhinta Builders Llp Jczarsl8c7udhn7qenl3gg==26-01-2022 00:00:00
Earth Residency Wing C And Wing DEarth Estate Developers Pvt LtdXtsoxab6il0puhllpa6imfrqh0ox3mhpi0ypuo5mzuo=28-08-2023 00:00:00
AsharaDevleela DevelopersDnxo5g43kfusasishjzqrw==31-12-2019 00:00:00
New Shiv Krupa Chsl Triveni ContourTriveni DevelopersMumbai Suburban, 40006631-03-2018 00:00:00
Casa PalazzoM/S. Paradigm Real Estates LlpS88wb9moxtmq8xnfermcvomvv5lqfw6xy2xdqyc6k/Jflclbk5uqpkkqthyfjjc9vtgrhqsqluogbi9snrlp2s2cuhdwlpochmgtflv589gwt4v/Xbkopz3gog1nh14e31-03-2019 00:00:00
KarmyogKrishnir Realtors And Developers400066, Mumbai Suburban31-03-2020 00:00:00
Sai ParadiseSai Universal Realtors &Amp; Developers LlpMumbai Suburban, 40006631-12-2017 00:00:00
Megha Edge- Red RoseMegha Lakshmi Enterprise2O4emi/Akbdqselsfgyela==30-09-2025 00:00:00
Chheda BhuvanHaresh Popatlal ChhedaCy1i2wq+Tnazjgkeaqkerfzafl6ml60ot8ogltexdos=31-12-2026 00:00:00
Shree YashodhanK Mehta And CompanyE8hzguwjw6nm6dn7cjzxbw==30-09-2025 00:00:00
Park ResidencyPavan Sheth And Associates AopXoj/Gibvapoivyeyq/Ibag==31-01-2021 00:00:00
AudumbarVas Builder & DevelopersPcuw76gswj5x90+Itralbq==31-12-2019 00:00:00
Patel Associates A/C New BelevuePatel Associates A/C New BelevueJgqwsvdbeckgk0lyaema/Hkavmpa7eahpxtvpefu8bx0xpg5u6coq0z710szxsco30-06-2021 00:00:00
Construction Of 86 Tenements Out Of 430 Mig Tenements Of Old Magathane Village BorivaliMaharashtra Housing And Area Development AuthorityOcgdge9ht4td5mxkhccrrffwlzq7dnqyab0aes/Q2ozkmkq/Q9aq9y+Ala+0Kcuznv3txq/Gz/Hnawhmns7wxrs5ugr+Xdanl+Lyzz14omo=13-12-2018 00:00:00
Shree Rasraj TowerK Mehta And CompanyLuvuyk/Jqlhlnztoutdzwpjdjzrgfbpmnzwkilrvxfo=31-12-2019 00:00:00
Teenmurty SummitM/S Teenmurty Summit Realty LlpGrfcearg0ccbsjh6uq9tyq==31-07-2022 00:00:00
Elite TowerElite Construction Co.400066, Mumbai Suburban31-07-2023 00:00:00
Target The MallMahendra Jamnadas KaraO6tjintsywmhn3jtkv1zdtaedm3nltlf/Qiwt3w6bmw=31-12-2017 00:00:00
Dahisar Sunderbaug Co-Op Housing Society Ltd.Rishabraj Estate Developers Pvt LtdG+T3hid0q2omtwcqg5azjg==31-12-2018 00:00:00
Sbies Geetanjali ChslB.Chopda Construction Pvt LtdLckcgcqmbparsf1jzx7mgfamelsmv9w1xcqhvfffvx/Tanq6q7i/Gxys4lldpbco31-07-2019 00:00:00
Modispaces TashkentModispaces Real Estate Pvt LtdYfbt2v2+Zw8ldlb1mtgkb1htavo5xztnycqkrxnxeyowsfgsabv4xktjdqtkapfl31-12-2018 00:00:00
Jaliyan Heights BorivaliJaliyan DeveloperZvrh1qbalumgdtvmnscbw4l3kvskiwgkpkvcjgkgekvqnmhbo8sj+Iijubbguzkcetaubsxy+7Tiocdjzdpjbwl4kqe3swa0b61cpa2j03mih6rvemzow1xgrqgfidfq30-07-2021 00:00:00
Redevelopment Of Kripadham Chs LtdKripa Realtors1M4cfoxrxtkt5jchqrwaiw==31-12-2017 00:00:00
Sanghvi SolitaireSanghvi Premises Private LimitedB9by6wvbspdk78uxd4oadb6jxncwzd6nlpxqmg1vsasne5wure4nxwqybgiseencxaljlznhxydhtncdxlfxmg==31-12-2018 00:00:00
Borivali Dipti Co-Op Hsg LtdShree Riddhi Siddhi Builders5Kcjwvvj0mycheijvcuytw==30-06-2019 00:00:00
Borivali Sai Smruti Cooperative Housing Society LimitedM/S Sapphire DevelopersPjdbpdmmwy+Af+P0pvgtpg==30-06-2027 00:00:00
Borivali Sagar ChslMahavir InfraprojectsRvilfikjc2fuqzvsgpmy4jddv6e1pusxiabc7a0kljo=31-03-2026 00:00:00
Sianna HeightsShubhjivan Builders Pvt LtdNgq5nsxzibi9svo14iy+Plfwtcvbillgj3s5vdely2q=31-08-2025 00:00:00
Harsiddhi Sadan Chs LtdRk ConstructionS78jumgciz8wvvdk/Knb9g==30-06-2025 00:00:00
The Konark RiseKonark Rajendra ShahW4eokwe5+Wczcufswo4adq==31-03-2026 00:00:00
Arvind NiwasHridyaa Infraprojects LlpW/Gakpvhyola7dreedzrrewrq7lw9mes5wwqwamg9/Tlkdaz0knyqea56lucakat30-06-2025 00:00:00
Navkar AtlantisNavkar Lifespaces Private LimitedDaulat Nagar30-11-2017 00:00:00
Redevelopment Of Sanjog Chs LtdHeritage Lifestyles Llp/Ikowek2dbvaql5hqj2lz/Qspk+9P0xbk8qb+Xbywpg=31-12-2018 00:00:00
Sai LeelaLaxmi AssociatesNd5di1flbwwkk6lmyzq9gejbr2zbilecetr7bxfwtta=31-12-2019 00:00:00
Redevelopment Of Pravesh ChslPranav Constructions Limited3Qiuiewmyauz2kchqfwrbw==28-11-2023 00:00:00
Rishabraj DivineM/S. Rishabraj Balaji InfraXkuymijzql9eazxs1z8af3av/Djrdvdd0oqifou2wow=30-10-2023 00:00:00
Sankeshwar DarshanM/S. Rishabraj Balaji InfraHml/Ukassvrc4m8vgxyxwb+1Jcvjgt/C0e1tno1ax3kjnk7ljdstiipkjbnbwcsj30-10-2023 00:00:00
SHAMBHAV DARSHANAAVISHKAR ENTERPRISESMumbai Suburban, 40006630-06-2020 00:00:00
Sbi Employees Prashant ChsAditya Developers40006618-05-2020 00:00:00
Shree KrishnaShakuntala BhoirMumbai Suburban, 40006831-12-2018 00:00:00
Om Moti Nagar ChslRenovator ConstructionE8l3gnio/2Esxqs2tuumn+H8055sjtifnqo1qvlrre4=30-06-2024 00:00:00
Shiv Shreyas ChslK P Developers5Iqaxualf2+Aqinrkuqn0w==31-12-2025 00:00:00
MatruchhayaM/S. Rishabraj Balaji Infra4Nryghkl7ay2lymlylwjmk90afaeolskboeyjeyslto=31-12-2024 00:00:00
Jeevan Shobha Chsl And Bhansali ChslHirani Realtors LlpLcqgtjx96jfxdn5jo/Gvshixynoclxrsrvveqf2oqeeeb54ktsyl+Gbwdq6av+Lc31-03-2026 00:00:00
Borivali Yashodhan ChslTgn Realtor LlpH1ydfyazwnqsgkfguxo+Ha==30-06-2024 00:00:00
KASHI BHUVANBHARAT V KENNY1011/A31-12-2024 00:00:00
Star PlazaSevenstar DevelopersF6xphjuncphfjzxqd+6Hz/Vxm9itdvnxtprlkemoeqcc4btjimirxf8yjwgy9b4b30-12-2022 00:00:00
Ratna Mohan Triveni ChslAtul CorporatesJnhmh5e4ympnz5gavbhboa==31-12-2018 00:00:00
Marina Enclave Wing J,K,L Phase -IGurukrupa Developers D N Nagar ProjectCfk3y9bdoaz6tuvoy8xdow==30-12-2020 00:00:00
Redevelopment Of Divya Jyoti Co-Operative Housing Society LimitedD V Developers LlpL3spzeb+Zvatb1hur7ngj+P2wq/Yimsevqkxkm5yvcln5xuhcf8hlq5id2jsksxd30-12-2021 00:00:00
Kumbhavati NiwasKrishna Bhooraram PurohitYihyirnweznf9urs+Pu7wg==30-12-2021 00:00:00
Kaveri HeightsKaveri GoldZh5zlby42zlzcaoorhmvuw==30-12-2021 00:00:00
Rooprajat EnclaveSiddhivinayak DevelopersVt1crgrkjcyrwe9o+Wfgyw==30-12-2021 00:00:00
RudranshSpa Jain Real Estate Private LimitedSc6eervygpcpzn0wrgjgqsmxrjewl+Mvrisslpyn3jfxokraqd4xax75eqefkfe7eobutenrh/Dlnus50d4h0w==31-12-2017 00:00:00
TatvaGitanjali Infratech LimitedKjjrtbbk1zxykfe1mjze2g==31-12-2018 00:00:00
Signature-IChaubey Realties Private LimitedX55qh06rr/7T32aebc1mvzvad/Ifg3vgiwtpho8ezdxtyp6qb20gbrhcnm2i5wfl31-12-2021 00:00:00
Parag - Reserve Co-Op Hsg SocSadguru Buildspacespvt. Ltd.3Hnhjahsx9++Vxwv1sgthq==30-12-2020 00:00:00
Navkar HeightsNavkar Groups Private LimitedI4ofuppchnguavuysj8khq==30-12-2021 00:00:00
101 BoulevardH M DevelopersTtu4s9tpp4kmo9yguwtnwy16pxwxz6ngzacs7q//Rvi=30-06-2026 00:00:00
Maruti ResidencyOm ConstructionOxvxfxyhxgjlystdie3wyq==30-06-2025 00:00:00
PavapuriKum Kum EnterprisesQo7ap3oumpaoxijoh2l+0Q==31-12-2026 00:00:00
Sbi Ragvihar ChsTuvin Consultancy Llp/Pnegt/5Coplf0ogc2d4za==10-12-2020 00:00:00
Swayambhu ResidencyYogiraj Builders And DevelopersPakuzzrfu5fdq+9Iyqd33w==30-09-2021 00:00:00
KrishnaSunit EnterpriseGvraf+1J3ddtii56966mxtewpyheuwlag0rn33bkqnw=30-12-2028 00:00:00
Torna ApartmentRajmudra Construction Pvt LtdAut5gqneeycjdpptus+Okg==31-01-2018 00:00:00
Nishchay Wing FShreeraj Developer LlpRqey4x9ui6rbj3kh1o4vmg==30-12-2024 00:00:00
The Borivali Neel Akash ChslTriveni Developers400066, Mumbai Suburban31-12-2018 00:00:00
Gaurishankar Bungalow RedevelopmentS S RealityCxx7mwdgi/Yyz+Jlzmfnpa==31-12-2019 00:00:00
Nishchay - Wing EShreeraj Developer LlpRqey4x9ui6rbj3kh1o4vmg==30-12-2024 00:00:00
Nishchay Wing DShreeraj Developer LlpNructmdx/Qwjwpgvblmjfg==30-12-2024 00:00:00
Sai JharokhaSwastik SpaceHwlqchars7kzj8vhhr3zxw==30-09-2017 00:00:00
Parmarth Niketan - Redevelopment Of Mani BhuvanJ V Constructions & DevelopersJ6dguqag5bty4najjzysdvptuaexypzy5bloetwwd80=31-12-2019 00:00:00
Shashwat ResidencyRushi Realty India Pvt Ltd9Jdfisn4fftodneqiqoszroi6mg35hadrvdxuexpatucimogbdf5285hah+Oqqf1pmbxbzb4zhnc+Lvpscrgynzhbqm9zhs2s6sel4e/Gzk4+7Kikk5vtf30cs3pt0gm30-12-2022 00:00:00
Jay Shrinath ChslK Mehta And CompanyHguulqifjlu2iaqcb758nq==30-06-2025 00:00:00
Rite FortisRite Housing DevelopersEhprseqdcqo4oh6xocwc+A==31-03-2023 00:00:00
Chaitanya Om Shivam - Om Shivam Premises CslChaitanya Enterprises84Mnczrpwpqx3l35tlkciq==31-05-2024 00:00:00
SaraswatiKarmvir Saraswati Developers LlpMd9jhtjruxzotosqfkse/Pxwj6mtuudi1wgdheqv7oujgaec0kzopzzr8lls+Mkorlf3k1yotjmryml2bes6vkmdxvxorwsy05y7pqzfrgy=24-12-2024 00:00:00
Unicorn HeightsTeoama Infrastructure Private LimitedGglw2u/3Pcwcznlspaomnhlcxcqw/Uflnnlwz8z3nle=30-06-2025 00:00:00
Blue Star Crystal ChslParadigm Blue Star Llp5Ptzy29q9kenhntcso9kuw==12-07-2027 00:00:00
Apurva Vaishali ChslDiravya Developers Llp3Nllyyapenlahdku9pkjya==30-09-2025 00:00:00
State Sector Bank Employees Chs Ltd Kailas BuildingKonark Structural Engineers Private LimitedNlvxg3uxzrzqudvziiqaww==31-03-2025 00:00:00
Aakasha ChslTrivenidevelopersUq5bj6szn8+Fp7aswv0twa==31-12-2017 00:00:00
Shree Sai Prasad Sra Chs LtdArjun WaghmareBorivali West31-12-2018 00:00:00
Ami ChslMehta Group3Cyxjzqnds9b5p672mkkpswkkxzb3rmp5fu2l7xrp3zb7cbmkqotsyqgseoacdcr31-12-2018 00:00:00
MadonnaMichael Rodrigues8Smururjovg+3V6y1pwekq==15-12-2019 00:00:00
Shri Hari BuildingShri Neelkanth Developers3Zg6ixbnssbbn613yaak0w==31-01-2019 00:00:00
Samet Sikar MahalKothari Construction CompanyCgiva6txrjalqohy/53Xevtlteom5mohgwvbmkrvfwqjdnjgdefki5/Bwmuodqu8j7u1bguvhgclddhrheuahq==31-12-2018 00:00:00
Maa EnrichDhanish Jitendra ShahA/Xsd5ynqsaqjazt0y+Yjg==31-05-2018 00:00:00
Rakhi Tower Phase 2 9Th To 11Th Floor PartWestern DevelopmentsMumbai Suburban, 40006621-12-2020 00:00:00
Golden GatewayD.N DevelopersMpwow3uysasdjgec0eqtnq==31-12-2029 00:00:00
Borivali Kesar Kripa Chs LtdBorivali Kesar Kripa Chs LtdQabuheoe+Mqss0p/Zfpy/Q==31-12-2027 00:00:00
Varella MansionDean Home Llp2Prm01d6zzvl19chrqigp7fbfpjesbesvfgizeau/V8=31-10-2027 00:00:00
Muktangan ResidencyRaaz Mohammed Abdul Samad PathanIeeob4ym+Pwncbi6un8wzytadkk8fj0iqbd1rk36vgk=31-10-2027 00:00:00
Kaveri HeritageKaveri Shine Builders And Developers LlpI2ci4eieaijqqbzwpzx+Jg==31-03-2025 00:00:00
Borivali New Roma Sadan ChslSumukh InfraprojectJptqfcg0uvxkt5+Qgqxbzq==30-06-2023 00:00:00
Arkade CrownArkade Developers Private LimitedPrvor++El1fudpo1y6md/Q==31-12-2025 00:00:00
Bhavik Darshan Chs Ltd And Gajmukh Chs LtdKonark Structural Engineers Private LimitedDddho45evol0zxr4eg1mrjtll1g1r3ckleohhmws/Ighhuti2pkwl1v7azlv8jncvcgfn8jnzczzlzo5avvsm+Xn3jtpscytqpmxfv2tanq=31-12-2027 00:00:00
AAKRUTI BUILDING NO. 4 AND 5AAKRUTI BUILDERS & DEVELOPERS15A/2/B/1 And 15A/4,5A,6A And 18/1,2,3 And 19/1,2 And 20,1,230-06-2021 00:00:00
Rishabraj ChambersRishabraj Estate Developers Pvt LtdQv6rbotjo5ykz5nuidmmmo/5H58um5xtv1liqckuuiu=31-12-2025 00:00:00
Shiv ParbatV3 PartnersFo2virvki0wqjlt0kvglqa==15-03-2027 00:00:00
Garden ViewSmlife Shreeji Developers LlpOi19z2eonrb20x5rp5o9xa==30-05-2025 00:00:00
21 JewelRatansingh And BrothersHlfrkostfhskjrzox84npccuzjedrcw0wsw62csycpi=31-12-2028 00:00:00
103 WestM/S. Relcon Zp Je Construction LlpFmq6rurkazksxgo+Alsysa==31-03-2029 00:00:00
Shreeji LeelaK Mehta And CompanyJ4hhwt+Trjpx5pg2fcrnxr5ocrnskvdqmyzffqfzcts=30-06-2028 00:00:00
Nl Park ViewBeautiful Properties Private Limited7Wc8wboqyzanjjzvthp+Na==30-05-2028 00:00:00
Borivali Gulmohar Terrace ChsAditya DevelopersFvvap+1W4dgxz1jkfph14w==25-12-2019 00:00:00
SanskritiJem And AssociatesG5mcdfv2aoo85ouakjeq5fk1089aamheux8fga7uq1c=31-01-2021 00:00:00
Pratham - By ShraddhaShraddha Prime Projects Limited0Dhooynxpjsglqxlkpi+2Ooiiko+4Hxi5j2vdedjvsi=31-12-2029 00:00:00
66 Aventus AvenueAventus Infrastructure LlpYump8ulrxlsb5qvgcpr67ha6k8iaqqc3yovfje3c78a=31-12-2029 00:00:00
Nicco Vanashri And Nicco HeightsNew India Construction CompanyVglwg6wrkpn/Lssjs3t+Uixqq54hgvcr9yhyt4d+77Efjrrd4klw1epwrygfxu2n31-12-2028 00:00:00
Adinath HeightsShri Neelkanth DevelopersGx8jresglohl4kq2t6/O0g==31-03-2026 00:00:00
Shraddha Park CityShraddha Prime Projects LimitedQn3pocelmguc3stmhc0a8mhfaxau6rfege2wmm2ibyht5ucrecwuqumo3bgkfad431-12-2029 00:00:00
Bldg No.1 Dahisar Sai Sadan Chs LtdTrumph DevelopersQdriatdybiebmg3e5vruvq==31-12-2019 00:00:00
Suresh SadanJaverben Nenshi ChhadvaMdwjkl/Boww91dldjonbjruk1qwdjmikznmpbzmyjicdnpf2eg44ophso+4Ild6k7webobjwaqj+Q3jpv7wxx9ibkfzrjcvjpxukpzxklkg=31-12-2018 00:00:00
Parimal HeritageDvnm Realty Private Limited2Thueykpl152fza9lpeuopa4ohmjuj+7J0v+9Rtfvla=31-03-2027 00:00:00
Ami OneAmi Wiseowlzz Realty31-12-2027 00:00:00
Redevelopment Of Sbi Emp Navjeevan ChslPranav Constructions Limited21-07-2028 00:00:00
Tasmai AnandaTasmai Shree30-06-2027 00:00:00
Shiv Guru TowerRajlaxmi DevelopersHccj4hqz12x65owbz6kokw==31-12-2027 00:00:00
Poonam ChslDigam Lifespaces LlpYcmaqebhjo/Zl+Nti/Kcqd0zysokl16vrzn26cxe7b3squdenapxncxml2ursljl31-10-2027 00:00:00
Dahisar Sagar Co-Operative Housing Society LimitedM/S. Trilogy Realtors Private LimitedCkzlimpqf4eofeb7x6lhpq==31-12-2029 00:00:00
Raj CapitalRaj Insignia Private LimitedDxlwepxrclasnu+Bmekagg==31-08-2026 00:00:00
Saikrupa ChsHasmukh R Hirani4Wx/Nfgd2gwpslzyy/Tplw==30-06-2019 00:00:00
Jalaram SquareShree Jalaram Developers30-09-2027 00:00:00
Avvirahi PlatinumAvvirahi Infra Llp25-12-2030 00:00:00
Shree Hari Om NagarRising Pioneers Infra LlpBao7qcbctijrofixgzavsq==31-12-2027 00:00:00
ShivalayaParadigm Friends Realtors Llp 02-01-2029 00:00:00
Avyukta MeghaKhushi Spaces Llp30-12-2028 00:00:00
Sambhav Darshan Purshottam Park Co-Operative Housing Society LtdSamarpan Homes & Developers31-12-2027 00:00:00
Proposed Redevelopment Of Prakashkunj ChslYash Realtors & Developers7Xipfhvqbs+Wwukevke5w70kojvlbyvqgrj1etls4tq=30-12-2023 00:00:00
Avyukta JayeshShivoham Infrahomes Llp31-03-2029 00:00:00
Girnar Apartment Co-Operative Housing Society LimitedKonark Structural Engineers Private Limited31-12-2029 00:00:00
Rishabraj Forest FrontRishabraj Estate Developers Pvt Ltd31-12-2028 00:00:00
Parekh EminenceParekh Spaces Llp31-12-2028 00:00:00
Parshuram HeightsSpacewalk Realty Llp30-09-2028 00:00:00
Rajhans VandanaRajhans Constructions31-12-2027 00:00:00
Gorai Samadhan Cooperative Housing Society LimitedGorai Samadhan Cooperative Housing Society Limited30-06-2027 00:00:00
Rohom RadianceRohom Realty01-09-2029 00:00:00
Harshail Iris ApartmentHarshmaan Spaces Llp30-09-2029 00:00:00
Rijin PrideSurbhi Construction30-09-2028 00:00:00
25 RbcRander Bandhu Corporation Llp31-03-2029 00:00:00
66 Infinia Parsh Realtors31-12-2028 00:00:00
Manglam RajanigandhaManglam & Karnani Ventures LlpRmfgecjt2huzyguipndxuw==30-06-2027 00:00:00
Empire EternityEmpire Land Developers Llp31-07-2028 00:00:00
Narayan ResidencyNarayan Vventures30-01-2030 00:00:00
Project Details
  • Project:
    Parmarth Niketan - Redevelopment Of Mani Bhuvan
  • Location:
  • J6dguqag5bty4najjzysdvptuaexypzy5bloetwwd80=
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    J V Constructions & Developers
  • Phone:
  • Address:
  • Akhil Tower
Project RERA Details
MAHA REARA No: P51800001745
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect A R Mehta & Associates
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Jun 2023
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 13 Feb 2026
Parmarth Niketan - Redevelopment Of Mani Bhuvan QR Code
Parmarth Niketan - Redevelopment Of Mani Bhuvan
MahaRERA - P51800001745
Apartment Details & Configuration
TypeArea
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )
1 BHK30.96 Sq.mts. ( 333 Sq.ft. )
1 BHK33.71 Sq.mts. ( 363 Sq.ft. )
1 BHK33.74 Sq.mts. ( 363 Sq.ft. )
1 BHK36.6 Sq.mts. ( 394 Sq.ft. )
2 BHK51.42 Sq.mts. ( 553 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Parmarth Niketan - Redevelopment Of Mani Bhuvanlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply
Na
Buildings / Wings in Parmarth Niketan - Redevelopment Of Mani Bhuvan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Parmarth Niketan - Redevelopment Of Mani Bhuvan by J V Constructions & Developerslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

8666 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

51 apartments in total
Total
51
Booked
25
Available
26

Saleable Area Statistics (Sq. ft.)

20863 Total
Total
20863
Booked
10285
Available
10578
Total 51 apartments in project. 25 apartments booked. 49% apartments booked.
Total 20863 Sq.ft. saleable area. 10285 saleable area booked.
49% area booked.

Parmarth Niketan - Redevelopment Of Mani Bhuvan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parmarth Niketan - Redevelopment Of Mani BhuvanDec 2020141010618
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )10
4 Booked40% Booked
40% Booked
1 BHK30.96 Sq.mts. ( 333 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK33.71 Sq.mts. ( 363 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK33.74 Sq.mts. ( 363 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK36.6 Sq.mts. ( 394 Sq.ft. )11
3 Booked27% Booked
27% Booked
2 BHK51.42 Sq.mts. ( 553 Sq.ft. )13
7 Booked53% Booked
53% Booked
51 total apartments / 25 apartments booked. 49% apartments booked.
Work Description in Building Parmarth Niketan - Redevelopment Of Mani BhuvanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
J V Constructions & Developers
for Project
Parmarth Niketan - Redevelopment Of Mani Bhuvan
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation