Project overview

Pine View is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700033505. Pine View is located at Qa/I22dccf28+Fnqhlvbbgrbjg9kki3/5Wxvw8rxyro=. This is a New being developed by Satya Developers.

Pine View has 1 BHK & 2 BHK Apartments with carpet areas ranging from 304 to 491 Sq.ft. Carpet. The Project has total 167 of which 167 are currently available for sale.

Pine View is being developed on a total land area of 33153 Sq.ft. Pine View has 2 Wings / Towers Pine View Wing A,Pine View Wing B

ProjectDeveloperLocationPossession
Sadguru ResidencySadguru InfraSc3f8fa9feb41twnbvfjkg==31-03-2018 00:00:00
Heramb Park Phase IiSai Samruddhi Construction CoWtdli/Jn13plier7yvwesffxuo0ckbkbg6jng4kpbdctapeo2+095Y8j6hsuetw/Busgiakzm7wirsxaetydxkjxoj6wa0fjtth+Mq4pj8i=31-07-2019 00:00:00
Dbr ClassicDbr Constructions Pvt LtdOa9d5xia+Iekubjtc2yg1q==30-12-2021 00:00:00
Shashwat Park - Phase I- Building 2 Wing C D,Building 3 Wing E F, Building 4 Wing G HShashwat HomesAe0p5kltnjdd01lvzvw/Gey1i6zk5urkbwvcue4f36g=30-03-2022 00:00:00
Shashwat Park 1-AbShashwat HomesRlqf515+Tl6xabf+Cscpgtsy+Twp3moz4tu1boeorw8=30-03-2022 00:00:00
Saurabh ArcadeM/S Krishna Builders & DevelopersXnddq7+Lc8jomckbtbweb9gzpz0gybdc2hadnkmjlza=30-12-2021 00:00:00
Shivam GreensM.K.DevelopersAnchsmh14pldljkgezkafv6pmu0m3tzqkj+S5o5lt7u=30-12-2023 00:00:00
Parshva Residency Wing CParshva Realtors9Nvciel30dlpju/Nj+U+Qcpzj1crxobbuc1he6qxye1gtv5mza4p7lsd8uc80q6y31-12-2019 00:00:00
Shree Krishna ResidencyPanchala Builders & DevelopersHh0o2cxcyjgus7douudfiut7yam8h+Usyk0lfemygp3ojumci/Xotnwxznybsnrqrjucwgkashcufuxaxm6ugq==30-12-2023 00:00:00
Precious SolitaireShubh LifespacesIcrp2v+Zwuhnq8khzmz5upgk6df3/Qymeypumkwlz6o=31-08-2026 00:00:00
Shashwat Park Z-5 A And B Wing ApartmentShashwat Homes2Kd9za7c/7Yzs9/Iyxsnsw7xbwio44yxzlzqprg9ncu=30-06-2025 00:00:00
Pinnacle AdarshPinnacle EnterprisesUvjqabcuert70roj8xqaamo/Qeztsgn83u1oa2jrise=30-06-2025 00:00:00
Datar HeightsSaleem Abdul ShaikhB6bt/Pv4x30lbqak0nbwzhtyxj19+Tanicsfcsnc5jb73rp7kv4kq/Nioyr9gxfs/Ylq0tb6/Woyorqjwohzbw==31-10-2019 00:00:00
Ravi DarshanRavi DevelopersI0x6uddupojvxki+2W+J58ex1qyvgbkbsp33zlwd7iw9a6itd5jzjlebasij3el425-05-2018 00:00:00
The Address Wing C Phase IiiSadguru AssociatePlwdvwkrx1o4o3t80tz8ciwex5gekob4xoy+Gq87im0=31-12-2026 00:00:00
Audumber ChslBhavani EnterprisesEm9h2jkhii8dmmdvigjrs8ry6ehbxkhlf5ewtyf/Dxwl2zlaukklvbg2z2lhm2al15-06-2026 00:00:00
Sadguru Symphony, Wing - D Of Phase - IiSadguru InfraBadlapur (W), Barvi Dam Road, Thane30-12-2022 00:00:00
Shrushti Aarambh, Wing - C Of Phase - IShrushti Developers3Hgva8wuf9c1uto968bash66qr7jtr/Byxahsvhwdkktp0i1qg1mnjctqcdvnvlg30-12-2022 00:00:00
Pine ViewSatya DevelopersQa/I22dccf28+Fnqhlvbbgrbjg9kki3/5Wxvw8rxyro=31-03-2028 00:00:00
SADGURU HARMONY PHASE - 3 WING CSADGURU ASSOCIATEBadlapur30-06-2025 00:00:00
Sadguru Harmony Phase 4 Wing DSadguru AssociateQmkxgf0spxvf2ehr6lzbaugqcrs+R+Wiklhsssu074v5dtkgwplvqrx6t+Jwthhp55hfkjlrstp/E4e2lfdli8eoa142jr74b/Suowdc+Ki=30-06-2025 00:00:00
Shashwat ParkModern ConstructionGanab29gx+Opp0loa7fsrrkgeuvhv9hm5fx3t56wauk=31-12-2018 00:00:00
Sadguru Harmony Ph-1 Wing ASadguru AssociateXmmu5nqevhwjhvcqtzy08z1flezr/Idlvomojve87ny=31-12-2019 00:00:00
PANVELKAR UTSAV - PHASE 2Sai Swarg EnterprisesGut No. 1, H.No. 1 2 3 4 Gut No. 230-12-2023 00:00:00
Royal OrchidS S EnterprisesThane30-12-2023 00:00:00
Shashwat Aangan Building / Wing BSamarth ConstructionGut No 6/5/1, 6/5/230-12-2027 00:00:00
Shreeji GardenShubh DevelopersNwh1saslrtxw7t6apdgas56h/E5d1uqtj8dqqfke2et05fcl5v2wmzhqohlpodii1skjeqkmwwkppisk01ebbkpof4n0jbzufctoj1irpzi=30-12-2021 00:00:00
Vastu ShilpVastu HomesLv6eqdgpjo+Vllo00ypipzwu7r+Q3llcds4dtjz/Pt8wm/Yp2xuhgieyhixoz0krtgocrj3xnc+Oyciqhor2kbtrqcysiz6cdt1sskjetvw=31-03-2018 00:00:00
Viraj IconicBonzer OrbitKkpuagqp9rlzki0nh4xrpjygfs58hka9botm8ch/C01coracv7+R3cyydrhzsort3opa4uerodfrsj/Sbgpdpnfiwazaovwzasavgrp0nwmgjikjoannv+7Rxyk8bces31-12-2026 00:00:00
Shivam Paradise Phase IM.K. EnterprisesWcfhxxaefgh8xx7wjwutrmkdamsmmy88qjtjh2adw3xjbyszrhbpmxo2rhyk/4Dd31-12-2024 00:00:00
Divya Jyot ComplexShree Aditi DevelopersGa7i7byhk+Lx+Pzs6svcrmm2zcsxejqofnwullvbdwc=30-12-2021 00:00:00
Deep AanganParekh Infraprojects35Wa+Crhuse2jeuhtbzqreodftbhqvi1jndck+9Yya4=31-12-2019 00:00:00
Shivam Complex Wing D And EUmiya Enterprises2Vv48bczf5oeut6/Bkwrkwd3bhqkeerovmcjczo6jw0=30-09-2018 00:00:00
Shashwat Park -Phase Ii -Z4bShashwat HomesWcle1bboptrmj2nnokblta==31-12-2018 00:00:00
Trimurti ResidencyTrimurti Construction CoKesjgkoef1ngc0atyjumwaj20ledq1nptpcexxvwy/C=31-12-2018 00:00:00
Umiya DhamShree Mangalmurti DevelopersValivli31-07-2019 00:00:00
Mrunali ParadiseTukaram Barku MhatreKogwvapqzwh+Oruwigfs4no4i//C5vqn9iirvp1m/Trsejkttf12zkzuh6obudcf31-12-2018 00:00:00
Maruti Prakruti DhamAvishkar DevelopersD8valzeymy33olvg5rjef3cjmr5smff3vdxn2kltmh8=31-12-2018 00:00:00
Pradhan Mantri Awas Yojana - UrbanKulgaon Badlapur Municipal CouncilS2qqaa4ravu4bsm69ceipcnvzogjjp2pzyhdbat4v+W=31-12-2024 00:00:00
Sanveg HillsSanveg HomesP+Sdfhqfcg9qszdzxsopyixterujx9vtexktte7btku=30-12-2021 00:00:00
Shrushti PrarambhShrushti DevelopersMkysvcprwzcbshd/9Mqv7bmuwt+Cnusvabua1cnawlq=30-12-2022 00:00:00
Shreeji NxShubh BuildersQdxqun3l1xddejsju0drvuwahaoitcm4pulwevazvzi=31-12-2026 00:00:00
Umiya DarshanShree Umiya GroupBr67nhaik71useafzvvupipc9ye5llap7z4pj/79Semgvdl2lrnfmfnvx9+Vg8xm30-06-2018 00:00:00
Shashwat Park - Phase I - Wing PShashwat HomesTlzocnqtquvelqkf8lhmkg==31-12-2018 00:00:00
DHAVALSHREEJI AND INNOVATIVE DEVELOPERSPlot No 10/ Survey No 105A /Hissa No 1Pt30-12-2022 00:00:00
Sai Hillcrest A- WingSairaj EnterprisesNrz+Xf4oqt42uqlusynclris4/7Zw7cseopbfgjsoh8=30-09-2029 00:00:00
Sai BaliramAnnapurna InfraFbjqww0n/Pbycahudnbrvytixwebwcplrh+K6tei8+V1wrwpvefzup5bvqptavs5hgrtomu00bfaigh6hpdf2pbpoklrfgokzkxwruqkxv8=31-12-2027 00:00:00
Shivam NirvaanaM K Realty31-12-2030 00:00:00
Project Details
  • Project:
    Pine View
  • Location:
  • Qa/I22dccf28+Fnqhlvbbgrbjg9kki3/5Wxvw8rxyro=
  • Const. Stage:
    New
  • Possession:
    31 Mar 2028
Developer Details

  • Developer:
    Satya Developers
  • Phone:
  • Address:
  • The Legend
Project RERA Details
MAHA REARA No: P51700033505
Project Type Others
RERA Project Status New
Architect Raj Associates
Funding Bank UNION BANK OF INDIA
Proposed Possession 31 Mar 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 22 Feb 2022
Last Retrived 13 Feb 2026
Pine View QR Code
Pine View
MahaRERA - P51700033505
Apartment Details & Configuration
TypeArea
1 BHK28.01 Sq.mts. ( 301 Sq.ft. )
1 BHK28.27 Sq.mts. ( 304 Sq.ft. )
1 BHK32.5 Sq.mts. ( 350 Sq.ft. )
1 BHK33.42 Sq.mts. ( 360 Sq.ft. )
1 BHK33.97 Sq.mts. ( 366 Sq.ft. )
1 BHK37.97 Sq.mts. ( 409 Sq.ft. )
2 BHK46.32 Sq.mts. ( 499 Sq.ft. )
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )
2 BHK51.79 Sq.mts. ( 557 Sq.ft. )
Shop9.84 Sq.mts. ( 106 Sq.ft. )
Shop12.92 Sq.mts. ( 139 Sq.ft. )
Shop13.22 Sq.mts. ( 142 Sq.ft. )
Shop15.81 Sq.mts. ( 170 Sq.ft. )
Shop18.15 Sq.mts. ( 195 Sq.ft. )
Shop20.62 Sq.mts. ( 222 Sq.ft. )
1 BHK31.67 Sq.mts. ( 341 Sq.ft. )
1 BHK33.99 Sq.mts. ( 366 Sq.ft. )
1 BHK34.48 Sq.mts. ( 371 Sq.ft. )
1 BHK35.58 Sq.mts. ( 383 Sq.ft. )
2 BHK40.6 Sq.mts. ( 437 Sq.ft. )
2 BHK45.66 Sq.mts. ( 491 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pine Viewlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Space Provided Work Yet Not Started
Energy management
Only For Wing - A
Fire Protection And Fire Safety Requirements
Only For Wing - A
Landscaping & Tree Planting
Tree Planting Work Yet Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Yet Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Yet Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Work Yet Not Started
Water Supply
M.J.P Will Provided Water Connection After O.C.
Buildings / Wings in Pine View
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pine View by Satya Developerslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

33153 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

167 apartments in total
Total
167
Booked
0
Available
167

Saleable Area Statistics (Sq. ft.)

62575 Total
Total
62575
Booked
0
Available
62575
Total 167 apartments in project. 0 apartments booked. 0% apartments booked.
Total 62575 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Pine View Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pine View Wing AMar 20281211105810
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.01 Sq.mts. ( 301 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK28.27 Sq.mts. ( 304 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK32.5 Sq.mts. ( 350 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK33.42 Sq.mts. ( 360 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK33.97 Sq.mts. ( 366 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.97 Sq.mts. ( 409 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK46.32 Sq.mts. ( 499 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK46.55 Sq.mts. ( 501 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK51.79 Sq.mts. ( 557 Sq.ft. )11
None Booked0% Booked
0% Booked
Shop9.84 Sq.mts. ( 106 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12.92 Sq.mts. ( 139 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.22 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.81 Sq.mts. ( 170 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop18.15 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.62 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
111 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pine View Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress41% done
41% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked

Pine View Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pine View Wing BMar 20281211103125
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.27 Sq.mts. ( 304 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK31.67 Sq.mts. ( 341 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK33.99 Sq.mts. ( 366 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK34.48 Sq.mts. ( 371 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK35.58 Sq.mts. ( 383 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK40.6 Sq.mts. ( 437 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK45.66 Sq.mts. ( 491 Sq.ft. )7
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pine View Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Satya Developers
for Project
Pine View
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation