Project overview

Poddar Riviera Phase - I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700023508. Poddar Riviera Phase - I is located at Kalyan Murbad Road, Mharal, Mharal. This is a New Project being developed by Poddar Housing And Development Limited.

Poddar Riviera Phase - I has 1 BHK i.e. UDCPR, 1 BHK PMAY PPP, 1.5 BHK i.e. UDCPR, 1.5 BHK PMAY PPP, 2 BHK i.e. UDCPR & 2 BHK PMAY PPP Apartments with carpet areas ranging from 343 to 565 Sq.ft. Carpet. The Project has total 720 of which 295 are currently available for sale.

Poddar Riviera Phase - I is being developed on a total land area of 30224 Sq.ft. Poddar Riviera Phase - I has 4 Wings / Towers A1,A2,A3,A4

ProjectDeveloperLocationPossession
Poddar Riviera Phase - IiPoddar Housing And Development LimitedKalyan Murbad Road, Mharal, Mharal30-12-2026 00:00:00
Poddar Riviera Phase - IiiPoddar Housing And Development LimitedKalyan Murbad Road, Mharal, Mharal30-03-2025 00:00:00
Shivnath Sky CityShivnath DeveloperThane, 42120431-12-2017 00:00:00
Galaxy Wing 5Bright Sky Heights Builders And Developers Private LimitedKalyan Shil Road, Padale Village, Padale Village31-10-2017 00:00:00
B-1 Mukta HeightsPravin PatilThane, 42120431-12-2017 00:00:00
Ammar MeadowsMeenar AssociatesThane, 40061231-12-2020 00:00:00
Galaxy Bldg 1 And 2Bright Sky Heights Builders And Developers Private LimitedKalyan Shil Road, Padale Village, Padale Village31-10-2017 00:00:00
Mansarovar Residency D WingKiran RealtyKalyanshill Road, Desai Village, Desai Village31-12-2023 00:00:00
Project Details
  • Project:
    Poddar Riviera Phase - I
  • Location:
  • Kalyan Murbad Road, Mharal, Mharal
  • Const. Stage:
    New Project
  • Possession:
    30 Sep 2025
Developer Details

  • Developer:
    Poddar Housing And Development Limited
  • Phone:
  • Address:
  • Unit No. 3-5, Poddar Group Building, 126 N M Joshi Marg, Mathuradas Mill Compound, Lower Parel West, 400013
Project RERA Details
MAHA REARA No: P51700023508
Project Type Residential
RERA Project Status New Project
Architect Architect Hafeez Contractor
Funding Bank HDFC BANK LIMITED
Proposed Possession 30 Sep 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Apr 2023
Last Retrived 18 Jan 2025
Poddar Riviera Phase - I QR Code
Poddar Riviera Phase - I
MahaRERA - P51700023508
Apartment Details & Configuration
TypeArea
1 BHK i.e. UDCPR34.93 Sq.mts. ( 376 Sq.ft. )
1 BHK PMAY PPP31.85 Sq.mts. ( 343 Sq.ft. )
1.5 BHK i.e. UDCPR43.17 Sq.mts. ( 465 Sq.ft. )
1.5 BHK PMAY PPP39.2 Sq.mts. ( 422 Sq.ft. )
2 BHK i.e. UDCPR53.73 Sq.mts. ( 578 Sq.ft. )
2 BHK PMAY PPP49.6 Sq.mts. ( 534 Sq.ft. )
1 BHK i.e. UDCPR35.43 Sq.mts. ( 381 Sq.ft. )
1 BHK PMAY PPP31.86 Sq.mts. ( 343 Sq.ft. )
1.5 BHK i.e. UDCPR43.57 Sq.mts. ( 469 Sq.ft. )
2 BHK i.e. UDCPR52.45 Sq.mts. ( 565 Sq.ft. )
2 BHK PMAY PPP48.15 Sq.mts. ( 518 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Poddar Riviera Phase - Ilast updated on 18 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
It Will Be Part Of Whole Project
Banquet, Party Lawn
It Will Be Part Of Whole Project
Club Gym, Open crèche
It Will Be Part Of Whole Project
Community Buildings
It Will Be Part Of Whole Project
Electrical Meter Room, Sub-Station, Receiving Station
It Will Be Part Of Whole Project
Energy management
It Will Be Part Of Whole Project
Fire Protection And Fire Safety Requirements
It Will Be Part Of Whole Project
Fishing, Amphitheatre, Outdoor organic farm patch
It Will Be Part Of Whole Project
Indoor games Pool, Table tennis, Chess, Carom
It Will Be Part Of Whole Project
Kids play area, Barbeque area
It Will Be Part Of Whole Project
Landscaping & Tree Planting
It Will Be Part Of Whole Project
Multipurpose ground, Tennis court, Cricket pitch
It Will Be Part Of Whole Project
Open air gym, Giant Jenga, Giant chess play area
It Will Be Part Of Whole Project
Open Parking
It Will Be Part Of Whole Project
Senior citizens??? corner, Jogging / walking track
It Will Be Part Of Whole Project
Sewerage (Chamber, Lines, Septic Tank , STP)
It Will Be Part Of Whole Project
Solid Waste Management And Disposal
It Will Be Part Of Whole Project
Storm Water Drains
It Will Be Part Of Whole Project
Street Lighting
It Will Be Part Of Whole Project
Swimming pool Adult pool, Kids pool, Jacuzzi
It Will Be Part Of Whole Project
Terrace party area on club
It Will Be Part Of Whole Project
Treatment And Disposal Of Sewage And Sullage Water
It Will Be Part Of Whole Project
Water Conservation, Rain water Harvesting
It Will Be Part Of Whole Project
Water Supply
It Will Be Part Of Whole Project
Buildings / Wings in Poddar Riviera Phase - I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Poddar Riviera Phase - I by Poddar Housing And Development Limitedlast updated on 18 Jan 2025 as per information obtained from MARA RERA.

30224 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

720 apartments in total
Total
720
Booked
425
Available
295

Saleable Area Statistics (Sq. ft.)

309716 Total
Total
309716
Booked
171076
Available
138640
Total 720 apartments in project. 425 apartments booked. 59% apartments booked.
Total 309716 Sq.ft. saleable area. 171076 saleable area booked.
55% area booked.

A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A1Sep 20252211120168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK i.e. UDCPR34.93 Sq.mts. ( 376 Sq.ft. )30
1 BHK PMAY PPP31.85 Sq.mts. ( 343 Sq.ft. )51
51 Booked100% Booked
100% Booked
1.5 BHK i.e. UDCPR43.17 Sq.mts. ( 465 Sq.ft. )31
1.5 BHK PMAY PPP39.2 Sq.mts. ( 422 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK i.e. UDCPR53.73 Sq.mts. ( 578 Sq.ft. )26
None Booked0% Booked
0% Booked
2 BHK PMAY PPP49.6 Sq.mts. ( 534 Sq.ft. )18
18 Booked100% Booked
100% Booked
169 total apartments / 90 apartments booked. 53% apartments booked.
Work Description in Building A1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

A2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A2Sep 20252211120168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK i.e. UDCPR34.93 Sq.mts. ( 376 Sq.ft. )25
1 BHK PMAY PPP31.85 Sq.mts. ( 343 Sq.ft. )56
56 Booked100% Booked
100% Booked
1.5 BHK i.e. UDCPR43.17 Sq.mts. ( 465 Sq.ft. )29
None Booked0% Booked
0% Booked
1.5 BHK PMAY PPP39.2 Sq.mts. ( 422 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK i.e. UDCPR53.73 Sq.mts. ( 578 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK PMAY PPP49.6 Sq.mts. ( 534 Sq.ft. )26
26 Booked100% Booked
100% Booked
169 total apartments / 101 apartments booked. 59% apartments booked.
Work Description in Building A2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

A3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A3Sep 20252211120168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK i.e. UDCPR34.93 Sq.mts. ( 376 Sq.ft. )22
6 Booked27% Booked
27% Booked
1 BHK PMAY PPP31.85 Sq.mts. ( 343 Sq.ft. )59
59 Booked100% Booked
100% Booked
1.5 BHK i.e. UDCPR43.17 Sq.mts. ( 465 Sq.ft. )25
1.5 BHK PMAY PPP39.2 Sq.mts. ( 422 Sq.ft. )19
19 Booked100% Booked
100% Booked
2 BHK i.e. UDCPR53.73 Sq.mts. ( 578 Sq.ft. )25
2 BHK PMAY PPP49.6 Sq.mts. ( 534 Sq.ft. )19
19 Booked100% Booked
100% Booked
169 total apartments / 106 apartments booked. 62% apartments booked.
Work Description in Building A3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

A4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A4Sep 20252211120168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK i.e. UDCPR35.43 Sq.mts. ( 381 Sq.ft. )29
1 BHK PMAY PPP31.86 Sq.mts. ( 343 Sq.ft. )56
56 Booked100% Booked
100% Booked
1.5 BHK i.e. UDCPR43.57 Sq.mts. ( 469 Sq.ft. )44
1.5 BHK PMAY PPP39.2 Sq.mts. ( 422 Sq.ft. )44
44 Booked100% Booked
100% Booked
2 BHK i.e. UDCPR52.45 Sq.mts. ( 565 Sq.ft. )17
2 BHK PMAY PPP48.15 Sq.mts. ( 518 Sq.ft. )23
23 Booked100% Booked
100% Booked
213 total apartments / 128 apartments booked. 60% apartments booked.
Work Description in Building A4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Poddar Housing And Development Limited
for Project
Poddar Riviera Phase - I
last updated on 18 Jan 2025 as per information obtained from MARA RERA.