Project overview

Poddar Wondercity Phase - Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020028. Poddar Wondercity Phase - Ii is located at -, Joveli Village, Joveli Village. This is a New Project being developed by Poddar Housing And Development Limited.

Poddar Wondercity Phase - Ii has ONE BHK S Apartments with carpet areas ranging from 304 to 304 Sq.ft. Carpet. The Project has total 540 of which 433 are currently available for sale.

Poddar Wondercity Phase - Ii is being developed on a total land area of 16082 Sq.ft. out of which 8913 Sq.ft. i.e 55% is reserved for recreational purposes. Poddar Wondercity Phase - Ii has 3 Wings / Towers B4,B5,B6

ProjectDeveloperLocationPossession
Baliram Tare ResidencyTare Group Builders And DevelopersTulja Bhavani Mandir Road, Chinchpada Gaon, Chinchpada Gaon31-12-2025 00:00:00
Om Ashish ChsGreen Heights InfraChurch Road, Ganesh Nagar, Ganesh Nagar31-12-2025 00:00:00
Shiv Ganga ApartmentShree Swami Samarth ConstructionSatramdas, Ulhasnagar, Ulhasnagar31-12-2024 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private LimitedVillage Panchpakhadi, Pokharan Road No.2, Subhash Nagar, Thane- West, Subhash Nagar, Thane- West, Village Panchpakhadi31-12-2027 00:00:00
Umiya Nakshatra HeightsM/S. Jigar EnterpriseKarjat Badlapur By Pass Road, Katrap Badlapur E, Katrap Badlapur E31-12-2027 00:00:00
Simone ResidencyM R M DevelopersKalyan, Daighar Village, Daighar Village30-12-2022 00:00:00
Delta WoodsDelta VentureMira Midc Road, Mira Road, Mira Road30-09-2023 00:00:00
Shreeji LandmarkVinayak DevelopersGodrej Hill Road, Khadakpada, Khadakpada30-12-2029 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt LtdGhod Bunder Road, Nr. Hiranandani Meadows, Nr. Hiranandani Meadows30-12-2021 00:00:00
The Icon Phase 1Leading Frontier Private LimitedHighlands Garden Road, Dhokali, Dhokali30-12-2022 00:00:00
Thanekar Civic Phase IiThanekar Construction LlpVadavali Gaon, Chikhloli Badlapur, Chikhloli Badlapur30-12-2024 00:00:00
Om Dattatray Chs LtdShiv Shakti DevelopersPlot No 13, Shiv Ganga Nagar, Shiv Ganga Nagar31-12-2024 00:00:00
25Hourlife - Tower B1Runwal Developers Private LimitedGhodbundar Road, Punchpakhadi, Punchpakhadi31-12-2029 00:00:00
SanyogAditya AssociatesRam Ganesh Gadkari Cross Road, Naupada, Naupada30-06-2023 00:00:00
Sachinam Co Op Hsg SocietyShreekanth DevelopersGaondevi Road, Kulgaon, Kulgaon31-03-2024 00:00:00
Krishna KunjShashank C Mishra HufB K No A-513, Room No 1026, Cts No 18726, Sheet No 16, Ulhasnagar, Ulhasnagar, B K No A-513, Room No 1026, Cts No 1872631-12-2023 00:00:00
25Hourlife - Tower C1Runwal Developers Private LimitedGhodbundar Road, Panchpakhadi, Panchpakhadi31-12-2029 00:00:00
Omkarr Sindhu ResidencyBluesky RealtyKurla Camp Road, Kurla Camp, Kurla Camp31-08-2024 00:00:00
Siddhivinayak Prasad Co-Op.Housing Soc.LtdShaurya DevelopersKulgaon, Badlapur, Badlapur31-12-2026 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private LimitedOld Mumbai Pune Highway, Shilphata Junction, Thane, Shilphata Junction, Thane31-12-2022 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedMidc Road, Mankivali, Mankivali31-12-2018 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyBalkum Road, Balkum, Balkum31-12-2022 00:00:00
Vardhman VatikaDiwali DevelopersGhodbunder Road, Thane, Thane31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedMankivili Road, Mankivili, Mankivili30-12-2023 00:00:00
Ekatva CoralSynergy DevelopersGanesh Wadi Road, Pancpakhadi, Pancpakhadi31-12-2025 00:00:00
24 EastMalhar DevelopersSector 8, Sanpada, Sanpada30-06-2026 00:00:00
Harshal Co-Op Housing Society LtdVeena DevelopersHari Niwas, Hari Niwas30-09-2024 00:00:00
NandigramYogesh MahajanKabe Road, Mahagiri Kharkar Ali, Thane, Mahagiri Kharkar Ali, Thane31-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNear Platina Complex, Bhayander West, Bhayander West31-12-2027 00:00:00
Gnp ArcadiaPriva InfraconDombivli Industrial Area, Midc, Dombivli, Midc, Dombivli31-01-2021 00:00:00
Paramount BKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-06-2024 00:00:00
Krishna Vihar Co-Operative Housing Society LimitedBal Ganapati Laabh DevelopersRam Maruti Road, Naupada, Naupada30-12-2021 00:00:00
Yashanand Chsl Ojass ConstructionsOjass ConstructionsGovind Bacchaji Road, Charai Thane West, Charai Thane West30-03-2022 00:00:00
Orion - Northern LightsJaykali Developers Private LimitedPokharan Road No. 2, Village Panchpakhadi, Subhash Nagar, Thane (West), Thane (West), Pokharan Road No. 2, Village Panchpakhadi30-03-2025 00:00:00
Ten X Era Raymond Realty Tower CRaymond LimitedPokhran Road No 1, Village Pachpakhadi, Village Pachpakhadi30-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder &Amp; DevelopersShirgaon , Badlapur, Badlapur East, Badlapur East, Shirgaon 31-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarKalyan, Ambivali, Ambivali31-12-2027 00:00:00
Evana D-2Vihang Infrastructure Pvt LtdGb Cross Road Thane, Thane, Thane31-12-2029 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai, Ambernath, Ambernath31-12-2025 00:00:00
Omega - Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane (West), Subhash Nagar, Thane (West), Pokharan Road No.230-03-2025 00:00:00
Royal EmpireSai Pooja ConstructionsBoradpada Road, Badlapur, Badlapur30-12-2024 00:00:00
Guru SakshatSadguru EnterprisesB Cabin Road, Siddhivinayak Nagar, Siddhivinayak Nagar30-12-2025 00:00:00
Poddar Wondercity Phase - ViPoddar Housing And Development Limited-, Joveli Vilalge, Joveli Vilalge30-06-2024 00:00:00
Poddar Wondercity Phase - IiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2022 00:00:00
Poddar Wondercity Phase - IPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2023 00:00:00
Poddar Wondercity Phase - IiiPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-09-2024 00:00:00
Poddar Wondercity Phase - IvPoddar Housing And Development Limited-, Joveli Village, Joveli Village31-07-2023 00:00:00
Kashi Darshan B WingVarad Raj ConstructionAt Wadeghar, Near Marathi School, Saparde Road, Saparde Road, At Wadeghar20-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersRam Ganesh Gadkari Path, Talaopali, Talaopali19-01-2026 00:00:00
Narang Privado - BNarang Realty Private LimitedAcharya Atre Road, Off Pokharan Road No. 1, Off Pokharan Road No. 131-03-2028 00:00:00
Suyog ApartmentTelange Builders &Amp; Developers Private LimitedSai Section, Sai Section30-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction-, Pendse Nagar, Pendse Nagar30-06-2023 00:00:00
Sarthi ElanzaSarthi DevelopersKalyan Shil Road, Near Shivam Hospital, Near Shivam Hospital31-10-2023 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdThane, 41020301-03-2014 00:00:00
Silver ArcadeSiddhivinayak EnterprisesThane, 40060131-12-2017 00:00:00
Orion Business ParkNeminath EnterprisesG B Road, Cine Wonder Cinema, Cine Wonder Cinema31-12-2018 00:00:00
Poddar Wondercity Phase - VPoddar Housing And Development Limited-, Joveli Village, Joveli Village30-06-2024 00:00:00
Lodha Amara - Wing 40 And 41Macrotech Developers LimitedSector 5, Balkum, Balkum29-11-2024 00:00:00
Palava Serenity APalava Dwellers Private LimitedKalyan Sheel Phata Road, Palava, Palava28-11-2025 00:00:00
Saket ImperialNirmaan RealtySavarkar Road, Tilak Road, Tilak Road07-08-2025 00:00:00
Maruti Square Building No 7Maruti Dwellers Private LimitedMira Bhayander Road, Mira Road East, Mira Road East31-12-2027 00:00:00
Paramount FKalpataru Homes Private LimitedBhiwandi Road, Balkum, Balkum30-09-2024 00:00:00
Upper Thane -Sereno A1Macrotech Developers Limited.31-07-2024 00:00:00
Asmeeta Texpa - IiMagus Infratech Private LimitedKalyan Bhiwandi Road, Additional Kalyan Bhiwandi Industrial Area, Additional Kalyan Bhiwandi Industrial Area30-12-2030 00:00:00
Janki LegacyNandkumar PapaiyaRamdev Park Road, Mira Road East, Mira Road East22-04-2026 00:00:00
Bsc It ParkBansal Steel CorporationRoad 16A, Wagle Industrial Estate, Wagle Industrial Estate01-06-2024 00:00:00
Runwal Lands EndRunwal Construction Private LimitedKolshet Road, Kolshet, Kolshet30-06-2029 00:00:00
Bhagwan Krishna NiwasQuick DevelopersGawand Path, Naupada, Naupada01-07-2024 00:00:00
Raj Height A WingBhavani EnterprisesLodha Heaven, Shirgoan, Shirgoan31-12-2019 00:00:00
Oyster - Shapoorji Pallonji Northern LightsJaykali Developers Private LimitedPokharan Road No.2, Village Panchpakhadi, Subhash Nagar, Thane West, Village Panchpakhadi, Subhash Nagar, Thane West30-09-2025 00:00:00
Gajanan Samruddhi Phase Ii C WingShree Gajanan Developers100 Feet Road, Khadegolavali, Khadegolavali30-12-2023 00:00:00
Jasmine TPalava Dwellers Pvt LtdKalyan Shilphata Road, Palava, Palava30-03-2023 00:00:00
Jasmine A, B, C, G, H And IPalava Dwellers Pvt Ltd.30-03-2023 00:00:00
Nirman SignatureShree Sha DevelopersBoradpada Road, Badlapur (W), Badlapur (W)31-03-2026 00:00:00
Hcs HorizonHcs Realtors LlpKanakia Road, Mira Road East, Mira Road East31-12-2026 00:00:00
Maplewoods Phase 1M/S Bks Galaxy Realtors LlpGut No. 51(2) 56 And 57(2), Dighe, Dighe31-12-2028 00:00:00
The EmpressUnique Shanti Developers LlpBehind Latif Park, Opp. Mig Colony,, Mira Road (East), Dist. Thane, Mira Road (East), Dist. Thane, Behind Latif Park, Opp. Mig Colony30-03-2023 00:00:00
Lotus ParkReal EnterpriseShahpur, Shahpur30-12-2022 00:00:00
Urban Grandeur Bldg-2Cllaro Enterprises LlpOpp. Winstone Tower, Mirabhayandar Road, Beverly Park, Miraroad E, Miraroad E, Miraroad E, Opp. Winstone Tower, Mirabhayandar Road, Beverly Park30-06-2027 00:00:00
ZenithRunwal Developers Private LimitedBalkum Road, Balkum Dhokali, Balkum Dhokali30-09-2028 00:00:00
Rental Building A-1 R2Sonam BuildersNew Golden Nest Phase Xiii, Bhayander East, Bhayander East31-12-2019 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private LimitedThane, 40060131-12-2022 00:00:00
Highland Springs B4- A WingSiddhi Real Estate DevelopersUniversity Road, Dhokali, Dhokali30-06-2020 00:00:00
Raviraj ApartmentRajendra GhorpadeGanesh Nagar Road, Ganesh Nagar, Ganesh Nagar30-12-2022 00:00:00
Krupa SindhuAshish GoleKulgaon, Kulgaon28-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesDr Agaskar Road, Naupada, Naupada30-12-2023 00:00:00
Newa Bhakti Park B WingNewa Technocity (I) Private LimitedAiroli Knowledge Park, Airoli, Airoli31-12-2027 00:00:00
Skyrise ResidencyNishith LuharShivganga Nagar Near Rikshaw Stand Plot No 6, Ambernath, Ambernath30-07-2025 00:00:00
Sheth Cnergy Ph 1 - Upto 11Th FloorSheth Developers Private LimitedEastern Express Highway, Panch Pakhadi, Panch Pakhadi30-12-2023 00:00:00
Paramount EKalpataru Homes Private LimitedMajiwada, Thane, Thane30-06-2025 00:00:00
Urban Nest Bldg - 1Cllaro Enterprises LlpMarigold Road, Beverly Park Mira Road East, Beverly Park Mira Road East31-12-2024 00:00:00
Green SquareSquarefeet Enterprises40 M Wide Road, Kavesar Ghodbunder Road Behind D Mart, Kavesar Ghodbunder Road Behind D Mart31-12-2027 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyShirgaon, Badlapur, Badlapur30-09-2019 00:00:00
Mauli MadhusudhanRameshwar PatilVasundari Road, Near Siddeshwar Hospital, Near Siddeshwar Hospital30-03-2023 00:00:00
Salangpur NirmanSalangpur NirmanRamdev Park Road, Mira Road East, Mira Road East30-12-2022 00:00:00
Jai MatadeeAaradhana DevelopersBhaskar Colony, Bhaskar Colony31-12-2017 00:00:00
One Indiabulls Thane - 1Tapir Constructions LimitedPokharan Road No 2, Thane, Thane29-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited.31-12-2020 00:00:00
Project Details
  • Project:
    Poddar Wondercity Phase - Ii
  • Location:
  • -, Joveli Village, Joveli Village
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Poddar Housing And Development Limited
  • Phone:
  • Address:
  • Unit No. 3-5, Poddar Group Building, 126 N M Joshi Marg, Mathuradas Mill Compound, Lower Parel West, 400013
Project RERA Details
MAHA REARA No: P51700020028
Project Type Residential
RERA Project Status New Project
Architect Architect Hafeez Contractor
Funding Bank HDFC BANK LIMITED
Proposed Possession 30 Jun 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Apr 2023
Last Retrived 18 Jan 2025
Poddar Wondercity Phase - Ii QR Code
Poddar Wondercity Phase - Ii
MahaRERA - P51700020028
Apartment Details & Configuration
TypeArea
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Poddar Wondercity Phase - Iilast updated on 18 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Yet Commenced
Club House - Mini Cinema Theater, Library, Banquet / Multipurpose Town Hall, Gymnasium
Part Of Entire Project
Club House Indoor Games - Table Tennis, Chess & Carom Room, Pool, Cards, Health Club
Part Of Entire Project
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Commenced
Energy management
Not Yet Commenced
Fire Protection And Fire Safety Requirements
Not Yet Commenced
Kids Play Area
Part Of Entire Project
Landscaping & Tree Planting
Not Yet Commenced
Mini Football Ground, Cricket Pitches, Tennis, Volleyball and Basketball Court / Multi Purpose Court
Part Of Entire Project
Neighbourhood Retail, Giant Jenga Play Area, Giant Chess Play Area, Outdoor games tables with boards
Part Of Entire Project
Open Air Gymnasium, Jogging/Walking Track, Picnic Area/Event Space & Arena/Activity Deck/Park
Part Of Entire Project
Open Parking
Not Yet Commenced
Organic farm Patch / Horticulture, Petting Zoo, Barbeque Area, Skating Rink, Café
Part Of Entire Project
Senior Citizens Corner, Dominos Tables, Dart Board, Yoga Corner/Room/Aerobic Room/Meditation Area
Part Of Entire Project
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Commenced
Solid Waste Management And Disposal
Not Yet Commenced
Storm Water Drains
Not Yet Commenced
Street Lighting
Not Yet Commenced
Swimming Pool Adult and Kids
Part Of Entire Project
Treatment And Disposal Of Sewage And Sullage Water
Not Yet Commenced
Water Conservation, Rain water Harvesting
Not Yet Commenced
Water Supply
Not Yet Commenced
Buildings / Wings in Poddar Wondercity Phase - Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Poddar Wondercity Phase - Ii by Poddar Housing And Development Limitedlast updated on 18 Jan 2025 as per information obtained from MARA RERA.

16082 Sq. ft.

Project Area

8913 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

540 apartments in total
Total
540
Booked
107
Available
433

Saleable Area Statistics (Sq. ft.)

164089 Total
Total
164089
Booked
32514
Available
131575
Total 540 apartments in project. 107 apartments booked. 19% apartments booked.
Total 164089 Sq.ft. saleable area. 32514 saleable area booked.
20% area booked.

B4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B4Dec 202124101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )180
36 Booked20% Booked
20% Booked
180 total apartments / 36 apartments booked. 20% apartments booked.
Work Description in Building B4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress43% done
43% Booked

B5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B5Dec 202124101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )180
44 Booked24% Booked
24% Booked
180 total apartments / 44 apartments booked. 24% apartments booked.
Work Description in Building B5Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked

B6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B6Dec 202124101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
ONE BHK S28.23 Sq.mts. ( 304 Sq.ft. )180
180 total apartments / 27 apartments booked. 15% apartments booked.
Work Description in Building B6Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress44% done
44% Booked
Channel Partners
Channel Partners Registered by Developer
Poddar Housing And Development Limited
for Project
Poddar Wondercity Phase - Ii
last updated on 18 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation