Project overview

Pranjee Garden City Phase -Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005963. Pranjee Garden City Phase -Ii is located at Near Ganesh Ghat, Katrap, Katrap. This is a On-Going Project being developed by Pranjee Properties Pvt. Ltd.

Pranjee Garden City Phase -Ii has 1 BHK & 2 BHK Apartments with carpet areas ranging from 316 to 413 Sq.ft. Carpet. The Project has total 456 of which 346 are currently available for sale.

Pranjee Garden City Phase -Ii is being developed on a total land area of 105658 Sq.ft. out of which 46284 Sq.ft. i.e 44% is reserved for recreational purposes. Pranjee Garden City Phase -Ii has 10 Wings / Towers Camellia D2,Casablanca E3,Frangipani D5,Jasmine E1,Lillium,Magnolia D3,Petunia E2,Primrose D1,Tulip D4,Veronica

ProjectDeveloperLocationPossession
Shubh NisargVardhaman And Vastu AssociatesThane, 42150320-12-2021 00:00:00
Vastu ShilpVastu HomesThane, 42150331-03-2018 00:00:00
Siddharth ApartmentRohan Gruh NirmanThane, 42150331-12-2017 00:00:00
Wing C-7 MoryaM K Patil Developers-31-12-2018 00:00:00
Arham VatikaArham EnterprisesThane, 42150331-07-2018 00:00:00
Om VatikaOm Shiv EnterprisesThane, 42150330-06-2018 00:00:00
Tulsi AahanRaj GroupNa, Badlpaur, Badlpaur31-12-2019 00:00:00
Thanekar ParklandAjay ThanekarThane, 42150331-12-2018 00:00:00
Kondilkar ResidencyAditi ConstructionThane, 42150301-06-2018 00:00:00
Swanand Treo Building No 3 -Swami GannayakSwanand HeightsKatrap Road, Badlapur, Badlapur31-08-2017 00:00:00
Om Shrinivas ApartmentShriniwas DevelopersThane, 42150331-03-2018 00:00:00
Maruti AsthaMaruti HomesThane, 42150331-10-2017 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development Limited-31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesThane, 42150331-12-2020 00:00:00
Vastu SquareVastu BuildersThane, 42150331-03-2018 00:00:00
Krishna KutirShubh Krishna RealtorsShop No 2 Amber Dhara Ii Opp Petrol Pump, Badlapur, Badlapur30-06-2025 00:00:00
Badlapur LandmarkRavindra PatilKalyan Badlapur Road, Belavali, Badlapur West, Belavali, Badlapur West31-12-2026 00:00:00
Amrut ManjilSai Shradha DevelopersMauje Badlapur Taluka Ambernath, Ambernath, Ambernath31-01-2028 00:00:00
Rachana HeightsReshma BambulkarThane, 42150309-06-2019 00:00:00
Saurabh ArcadeM/S Krishna Builders &Amp; DevelopersThane, 42150330-12-2021 00:00:00
Maruti MeadowsVasani EnterprisesNa, Na30-12-2020 00:00:00
Sairaj Avenue Wing BVirendra SalunkheSubhash Nagar Road Belavali, Behind Shree Complex Badlapur West, Behind Shree Complex Badlapur West31-05-2024 00:00:00
Dattatray ResidencyShri Krishna VastuBadlapur, Badlapur31-12-2027 00:00:00
Samarth ParadiseS P DevelopersKatrap, Badlapur East, Badlapur East31-12-2026 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedS.No.143 H No.5-6, Badlapur, Badlapur31-05-2018 00:00:00
AsawariAshish GoleThane, 42150331-05-2018 00:00:00
Sai ArcadeSai DevelopersThane, 42150331-10-2017 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersThane, 42150331-12-2018 00:00:00
Thanekar ParadiseAjay ThanekarThane, 42150330-12-2019 00:00:00
Vishwajeet ManorAbhijeet RealtyBadlapur, Katrap, Katrap31-12-2019 00:00:00
Silicon TowerShree Radhakrishna DeveloperThane, 42150331-05-2018 00:00:00
PalmPranjee Properties Pvt. LtdNear Ganesh Ghat, Katrap, Katrap28-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupBadlapur, Badlapur31-10-2019 00:00:00
Sai Raj ResidencyShriram DevelopersThane, 42150331-03-2018 00:00:00
Shubh VatikaShubh EnterprisesThane, 42150331-05-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionNear Ganesh Ghat, Katrap, Katrap15-04-2015 00:00:00
Ekdant SmaranPrashant BaeetThane, 42150316-03-2021 00:00:00
Deep EnclaveDattaguru EnterprisesSurvey No. 42, Plot No. C-11 And C-11A, Division Konkan, Village - Kulgaon (Mhada), Badlapur, Badlapur, Survey No. 42, Plot No. C-11 And C-11A, Division Konkan30-06-2019 00:00:00
Sanveg Residency - Phase IOm Vastu HomesBoradpada Road, Badlapur Gaon, Badlapur Gaon30-06-2021 00:00:00
Madhumalti Apartment B WingShree Datta EnterprisesJadhav Colony, Belavli, Belavli31-03-2018 00:00:00
Pinnacle AdarshPinnacle EnterprisesJadhav Colony, Belavli, Belavli Badlapur West, Belavli Badlapur West, Jadhav Colony30-06-2025 00:00:00
First EleganceGurupreet Singh SandhuSurvey No 26, Hissa 2/A/23, Plot No 20, Village Shiragaon, Taluka Ambernath, Dist Thane, Badlapur East Katrap, Badlapur East Katrap, Survey No 26, Hissa 2/A/23, Plot No 20, Village Shiragaon, Taluka Ambernath31-12-2025 00:00:00
Satvik E WingJigar Enterprises-, Katrap, Katrap01-12-2019 00:00:00
Chintamani HeightsYash EnterprisesKulgaon Village, Kulgaon, Kulgaon31-12-2019 00:00:00
Aawas DeepShree Krishna BuildconBadlapur Gaon Road, Yashraj Nagar, Yashraj Nagar31-12-2021 00:00:00
Motiram PuramNayan DalalThane, 42150331-05-2021 00:00:00
Evergreen Residency C WingBalaji ConstructionBadlapur, Badlapur Gaon, Badlapur Gaon31-12-2021 00:00:00
Aditi PlazaChintamani ConstructionHendrepada, Hendrepada31-12-2017 00:00:00
Tharwani Millennium City Phase IiTharwani RealtorsNear Katrap Petrol Pump, Badlapur, Badlapur30-12-2024 00:00:00
Tharwani Millennium City Phase IiiTharwani RealtorsNear Katrap Petrol Pump, Badlapur, Badlapur30-12-2026 00:00:00
Nandraj Nagari Type ESwaraj DevelopersThane, 42150331-03-2018 00:00:00
Ravindranath Tagore NiketanSai City DevelopersThane, 42150330-06-2020 00:00:00
Amber ArcadeMaitri DevelopersThane, 42150314-08-2018 00:00:00
Sai VillaBuilt Tech Builders &Amp; Developers Pvt. Ltd.Aamdar Niwas Road, Badalapur Gaon, Badalapur Gaon30-12-2022 00:00:00
Shreeji HeightsShubh BuildconShirgaon, Badlapur East, Badlapur East30-06-2022 00:00:00
Metro ImperialMetro Balaji DevelopersNew English School Road, Badlapur, Badlapur30-06-2021 00:00:00
Manohar Vikas Shreeji Paraiso Phase 1Deeplaxmi DevelopersThane, 42150331-05-2021 00:00:00
Shree Sai PoojaM/S Mahalaxmi Construction Co.Thane, 42150331-12-2018 00:00:00
Blue Diamond ResidencyKimaya ConstructionThane, 42150331-12-2019 00:00:00
Rathadia Co-Operative Housing Society LtdJ Square InfraBadlapur Gaon Road, Kulgaon, Kulgaon31-03-2019 00:00:00
Navjeevan Co-Op. Housing Society LtdAvishkar GroupPlot No. H3-A &Amp; H3-B, Kulgaon, Kulgaon31-12-2019 00:00:00
Shree PalacePushlata GhuleBadlapur Gaon Road, Badlapur Gaon, Badlapur Gaon30-12-2021 00:00:00
Precious Harmony Phase IiM/S Soham ConstructionOpp Krishna Garden, Katrap, Katrap30-12-2022 00:00:00
Royal Wood ParkPrabhavati ConstructionsS.No.23 H.No.1, Badlapur, Badlapur30-06-2021 00:00:00
Avantika ResidencySanchita ConstructionThane, 42150327-08-2018 00:00:00
Murlidhar PlazaSaipoojan EnterprisesThane, 42150319-12-2020 00:00:00
ParshvadharaParshvanath DevelopersThane, 42150330-12-2018 00:00:00
Sky HillSeven Hill BuildconThane, 42150330-04-2019 00:00:00
LeelaanganPravin HawareDp Road, Behind Badlapur High School, Behind Badlapur High School31-12-2021 00:00:00
Swami HighlandsShree Swami Samarth AssociatesThane, 42150331-12-2019 00:00:00
Alok GalaxyJuhi Developers30 Mtr Road, Shirgaon, Shirgaon13-10-2021 00:00:00
Omkar ApartmentsPinnacle LifespacesKondeshwar Road, Juveli Village, Badlapur, Badlapur, Kondeshwar Road30-03-2022 00:00:00
Krishna C And D WingNina BuildersHendrepada, Badlapur West, Badlapur West30-12-2021 00:00:00
Sai Krupa ResidencySairaj DevelopersShirgaon, Badlapur, Badlapur31-12-2019 00:00:00
Shubh Nirman Phase IGuru DevelopersBelavali, Belavali30-12-2022 00:00:00
Badlapur ArcadeMahalaxmi Builders &Amp; DevelopersShirgaon, Badlapur West, Badlapur West30-12-2023 00:00:00
Mansvi ApartmentRuhi EnterprisesPlot No 7 Survey No 45 Hissa No 1/7, Belavali West Badlapur, Belavali West Badlapur30-03-2023 00:00:00
Sara HeightsShete'S ConstructionG No 47 P, Hissa No 19 &Amp; 20, At Manjarli Badlapur, At Manjarli Badlapur, G No 47 P30-12-2022 00:00:00
Wing D- DurvankurM K Patil DevelopersThane, 42150319-08-2019 00:00:00
Aruna UlhasGaondevi DevelopersThane, 42150331-10-2017 00:00:00
Apte HomesShree Siddhi DevelopersThane, 42150331-12-2018 00:00:00
Royal OrchidS S EnterprisesAmbernath Badlapur Road, Belavali, Belavali30-12-2023 00:00:00
Tharwani Millennium City Phase ITharwani RealtorsNear Katrap Petrol Pump, Badlapur, Badlapur31-07-2023 00:00:00
Olive - Phase Iii - Pranjee Garden CityPranjee Properties Pvt. LtdNear Ganesh Ghat, Katrap, Katrap30-06-2024 00:00:00
Pranjee Garden City Phase -IiPranjee Properties Pvt. LtdNear Ganesh Ghat, Katrap, Katrap31-12-2016 00:00:00
Sonal Co-Op Housing SocietySoham DevelopersThane, 42150331-01-2019 00:00:00
Sai ShrutiPinnacle ConstructionsThane, 42150331-12-2017 00:00:00
Manohar Shreeji Nirvana Phase 4Deeplaxmi DevelopersKatrap, Katrap30-10-2022 00:00:00
Sanveg HillsSanveg HomesManjarli, Badlapur, Badlapur30-12-2021 00:00:00
Shrushti PrarambhShrushti DevelopersSurvey No.5/3/3, Belavali, Badlapur, Badlapur, Survey No.5/3/330-12-2022 00:00:00
Swaroop OrchidSwaroop ConstructionThane, 42150330-06-2018 00:00:00
Datar HeightsSaleem ShaikhThane, 42150331-10-2019 00:00:00
The Address Ph-1 Wing ASadguru AssociateBadlapur, Badlapur31-08-2020 00:00:00
Satvik Wing BM/S. Jigar Enterprise-, Katrap, Katrap31-12-2023 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersNear Church Road, Badlapur West, Badlapur West31-03-2026 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersJoveli Gaon Road, Joveli, Joveli31-12-2025 00:00:00
Paradise Park - Phase 1M/S Vakratund EnterprisesBelavli, Belavli30-03-2024 00:00:00
Shiv SamarthShiv CorporationKoneshwar Road, Joveli, Joveli30-09-2020 00:00:00
SundaramM/S. Purab AssociatesBadlapur Ambernath Midc Road, Opposite Hp Petrol Pump, Opposite Hp Petrol Pump31-01-2020 00:00:00
Parijat Plaza Type BM/S Parijat ConstructionsThane, 42150331-03-2018 00:00:00
Vastu Swapnapurty ResidencyVastu Builders And DevelopersThane, 42150331-07-2022 00:00:00
Maitri HillsEshwar EnterprisesThane, 42150331-12-2018 00:00:00
Sai HighlandShree Saikrupa DevelopersThane, 42150330-03-2022 00:00:00
Patil Hill ViewEkdant DevelopersThane, 42150330-06-2018 00:00:00
Neelkanth DeepKeshav RealtyThane, 42150330-06-2019 00:00:00
Nirmala ParadisePokhriyal And AssociatesChintamani Chowk, Badlapur West, Badlapur West30-09-2024 00:00:00
Bingo Dham Co-Op Hsg Soc LtdSai ConstructionsBadlapur, Badlapur31-12-2022 00:00:00
Daksh PalaceThakur DevelopersVillage Manjarli, Manjarli, Manjarli30-09-2024 00:00:00
Bhakti Park B WingBhakti CorporationThane, 42150331-08-2017 00:00:00
Ravi DarshanRavi DevelopersThane, 42150325-05-2018 00:00:00
Krishna KunjKrishna AssociatesThane, 42150331-03-2018 00:00:00
Entilla By DevDev Konark CorporationThane, 42150331-03-2018 00:00:00
Bahinai BhuvanManoj VaidyaThane, 42150330-06-2020 00:00:00
NilgiriShivam DeveloperThane, 42150330-05-2018 00:00:00
Rubyana Residency Phase 1Sudhir GhatnekarThane, 42150330-06-2018 00:00:00
Eternal AvenueMagnum Life SpacesThane, 42150331-03-2018 00:00:00
Krishna KunjRaj WadhwaThane, 42150331-03-2018 00:00:00
Shubh HillsVardhman EnterprisesThane, 42150331-07-2018 00:00:00
Nirmal DharaSiddhivinayak EnterprisesThane, 42150331-12-2019 00:00:00
Krishna ResidencyKrishna EnterprisesThane, 42150330-11-2018 00:00:00
Krishna HillsShree Omsai ConstructionThane, 40053131-07-2017 00:00:00
Precious HarmonyM/S Soham ConstructionThane, 42150331-03-2018 00:00:00
Ganesh HeightsShiv Builders And DevelopersThane, 42150301-07-2019 00:00:00
Shubh AarambhPacific Construction &Amp; DevelopersThane, 42150330-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme DevelopersThane, 42150330-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan TharwaniThane, 42150330-05-2017 00:00:00
Sai DarshanUnity InfratechThane, 42150330-06-2020 00:00:00
Mrunali ParadiseTukaram MhatreThane, 42150331-12-2017 00:00:00
Shree Ganesh Vyapari SankulRajdeep Builders And DevelopersThane, 42150331-03-2019 00:00:00
Trinity Galaxy R1 And R4Trinity DevelopersThane, 42150331-12-2017 00:00:00
Vedant Imperial D Phase 3Mohan TharwaniThane, 42150330-05-2022 00:00:00
Kalp CityKasata Home TechThane, 42150331-03-2017 00:00:00
Shree Ashtavinayak Vastu PrakalpaBalkrishna BhoirThane, 42150330-06-2018 00:00:00
Tulsi AnandAnand HomesBarvidem Road, Eranjade, Eranjade31-12-2017 00:00:00
Sai Prasad PlazaSainath SheteThane, 42150331-12-2019 00:00:00
Project Details
  • Project:
    Pranjee Garden City Phase -Ii
  • Location:
  • Near Ganesh Ghat, Katrap, Katrap
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2016
Developer Details

  • Developer:
    Pranjee Properties Pvt. Ltd
  • Phone:
  • Address:
  • 201, Jollitha Complex, N. B. Patil Marg, Near Syndicate Bank, Near Maitri Park, 400071
Project RERA Details
MAHA REARA No: P51700005963
Project Type Others
RERA Project Status On-Going Project
Architect Satish Oak
Funding Bank Axis Bank
Proposed Possession 31 Dec 2016
Revised Possession 30 Nov 2018
Extended Possession 30 Nov 2019
Litigations No Litigations
Last Modified 11 Mar 2020
Last Retrived 18 Jan 2025
Pranjee Garden City Phase -Ii QR Code
Pranjee Garden City Phase -Ii
MahaRERA - P51700005963
Apartment Details & Configuration
TypeArea
2 BHK39.23 Sq.mts. ( 422 Sq.ft. )
3 BHK45.28 Sq.mts. ( 487 Sq.ft. )
2 BHK38.82 Sq.mts. ( 418 Sq.ft. )
2 BHK39.74 Sq.mts. ( 428 Sq.ft. )
2 BHK40.4 Sq.mts. ( 435 Sq.ft. )
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )
2 BHK38.37 Sq.mts. ( 413 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Pranjee Garden City Phase -Iilast updated on 18 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings60% completed
60% Complete
Work In Progress
Compound Wall
Work In Progress
Electrical Meter Room, Sub-Station, Receiving Station
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Work In Progress
Landscaping & Tree Planting
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains
Work In Progress
Street Lighting
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Work Not Yet Started
Water Conservation, Rain water Harvesting
Work In Progress
Water Supply
Kbmc Will Provide Connection On Receipt Of Oc
Buildings / Wings in Pranjee Garden City Phase -Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pranjee Garden City Phase -Ii by Pranjee Properties Pvt. Ltdlast updated on 18 Jan 2025 as per information obtained from MARA RERA.

105658 Sq. ft.

Project Area

46284 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

456 apartments in total
Total
456
Booked
110
Available
346

Saleable Area Statistics (Sq. ft.)

184544 Total
Total
184544
Booked
47195
Available
137349
Total 456 apartments in project. 110 apartments booked. 24% apartments booked.
Total 184544 Sq.ft. saleable area. 47195 saleable area booked.
26% area booked.

Camellia D2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Camellia D2Nov 201871010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.23 Sq.mts. ( 422 Sq.ft. )21
11 Booked52% Booked
52% Booked
3 BHK45.28 Sq.mts. ( 487 Sq.ft. )7
3 Booked42% Booked
42% Booked
28 total apartments / 14 apartments booked. 50% apartments booked.
Work Description in Building Camellia D2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Casablanca E3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Casablanca E3Nov 201871010018
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK38.82 Sq.mts. ( 418 Sq.ft. )14
4 Booked28% Booked
28% Booked
2 BHK39.74 Sq.mts. ( 428 Sq.ft. )14
3 Booked21% Booked
21% Booked
2 BHK40.4 Sq.mts. ( 435 Sq.ft. )14
42 total apartments / 9 apartments booked. 21% apartments booked.
Work Description in Building Casablanca E3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Frangipani D5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Frangipani D5Nov 201871010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.23 Sq.mts. ( 422 Sq.ft. )21
9 Booked42% Booked
42% Booked
3 BHK45.28 Sq.mts. ( 487 Sq.ft. )7
2 Booked28% Booked
28% Booked
28 total apartments / 11 apartments booked. 39% apartments booked.
Work Description in Building Frangipani D5Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Jasmine E1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Jasmine E1Nov 201871010011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK38.82 Sq.mts. ( 418 Sq.ft. )14
6 Booked42% Booked
42% Booked
2 BHK39.74 Sq.mts. ( 428 Sq.ft. )14
4 Booked28% Booked
28% Booked
2 BHK40.4 Sq.mts. ( 435 Sq.ft. )14
4 Booked28% Booked
28% Booked
42 total apartments / 14 apartments booked. 33% apartments booked.
Work Description in Building Jasmine E1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Lillium

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
LilliumNov 2018121010025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )47
None Booked0% Booked
0% Booked
2 BHK38.37 Sq.mts. ( 413 Sq.ft. )48
None Booked0% Booked
0% Booked
95 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building LilliumCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Magnolia D3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Magnolia D3Nov 201871010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.23 Sq.mts. ( 422 Sq.ft. )21
16 Booked76% Booked
76% Booked
3 BHK45.28 Sq.mts. ( 487 Sq.ft. )7
28 total apartments / 17 apartments booked. 60% apartments booked.
Work Description in Building Magnolia D3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Petunia E2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Petunia E2Nov 201871010011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK38.82 Sq.mts. ( 418 Sq.ft. )14
11 Booked78% Booked
78% Booked
2 BHK39.74 Sq.mts. ( 428 Sq.ft. )14
4 Booked28% Booked
28% Booked
2 BHK40.4 Sq.mts. ( 435 Sq.ft. )14
4 Booked28% Booked
28% Booked
42 total apartments / 19 apartments booked. 45% apartments booked.
Work Description in Building Petunia E2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Primrose D1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Primrose D1Nov 20187101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.23 Sq.mts. ( 422 Sq.ft. )21
11 Booked52% Booked
52% Booked
3 BHK45.28 Sq.mts. ( 487 Sq.ft. )7
3 Booked42% Booked
42% Booked
28 total apartments / 14 apartments booked. 50% apartments booked.
Work Description in Building Primrose D1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tulip D4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tulip D4Nov 201871010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.23 Sq.mts. ( 422 Sq.ft. )21
11 Booked52% Booked
52% Booked
3 BHK45.28 Sq.mts. ( 487 Sq.ft. )7
28 total apartments / 12 apartments booked. 42% apartments booked.
Work Description in Building Tulip D4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Veronica

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VeronicaNov 2018121010025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.37 Sq.mts. ( 316 Sq.ft. )47
None Booked0% Booked
0% Booked
2 BHK38.37 Sq.mts. ( 413 Sq.ft. )48
None Booked0% Booked
0% Booked
95 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building VeronicaCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Pranjee Properties Pvt. Ltd
for Project
Pranjee Garden City Phase -Ii
last updated on 18 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation