Project overview

Puneet Prime Phase 2 Floor 3 To Floor 16 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800020753. Puneet Prime Phase 2 Floor 3 To Floor 16 is located at S G Barve Marg, Nehru Nagar, Nehru Nagar. This is a New Project being developed by Puneet Builders.

Puneet Prime Phase 2 Floor 3 To Floor 16 has 1 BHK, 1.5 BHK, 1RK, 2 BHK & 2.5 BHK Apartments with carpet areas ranging from 291 to 711 Sq.ft. Carpet. The Project has total 68 of which 0 are currently available for sale.

Puneet Prime Phase 2 Floor 3 To Floor 16 is being developed on a total land area of 12039 Sq.ft. Puneet Prime Phase 2 Floor 3 To Floor 16 has 1 Wings / Towers Puneet Prime

ProjectDeveloperLocationPossession
Ratnadeep Chs LtdS D Bhalerao Constructions Pvt Ltd Bldg No 60 JvSambar Galli, Nehru Nagar, Nehru Nagar31-05-2019 00:00:00
Skyline Sparkle Wing C Skyline GreathillsMumbai Suburban, 40007831-12-2018 00:00:00
Kuber Varshatai TowerAnand PatilMumbai Suburban, 40002431-12-2014 00:00:00
Redevelopment Of Gkw Sankey Employees ChslHeritage Lifestyles &Amp; Developers Pvt. Ltd.EMumbai Suburban, 40007831-05-2019 00:00:00
SovenirSuncity CorporationMumbai Suburban, 40007831-08-2016 00:00:00
CelestialSu Sharda Edifice LlpKurla, Kurla31-12-2017 00:00:00
Project Details
  • Project:
    Puneet Prime Phase 2 Floor 3 To Floor 16
  • Location:
  • S G Barve Marg, Nehru Nagar, Nehru Nagar
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    Puneet Builders
  • Phone:
  • Address:
  • 401 /402, Tulsee Chamber Premises, Teen Petrol Pump, Opp. Teen Petrol Pump, L.B.S. Road, 400602
Project RERA Details
MAHA REARA No: P51800020753
Project Type Residential
RERA Project Status New Project
Funding Bank HDFC Bank
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Feb 2024
Last Retrived 14 Jan 2025
Puneet Prime Phase 2 Floor 3 To Floor 16 QR Code
Puneet Prime Phase 2 Floor 3 To Floor 16
MahaRERA - P51800020753
Apartment Details & Configuration
TypeArea
1 BHK36.62 Sq.mts. ( 394 Sq.ft. )
1 BHK37.42 Sq.mts. ( 403 Sq.ft. )
1 BHK37.55 Sq.mts. ( 404 Sq.ft. )
1 BHK40.25 Sq.mts. ( 433 Sq.ft. )
1.5 BHK46.53 Sq.mts. ( 501 Sq.ft. )
1RK27.08 Sq.mts. ( 291 Sq.ft. )
1RK27.8 Sq.mts. ( 299 Sq.ft. )
2 BHK47.5 Sq.mts. ( 511 Sq.ft. )
2 BHK52.95 Sq.mts. ( 570 Sq.ft. )
2.5 BHK66.06 Sq.mts. ( 711 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Puneet Prime Phase 2 Floor 3 To Floor 16last updated on 14 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
CCTV
Will Be Completed Before Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Completed Before Oc
ELEVATORS
Will Be Completed Before Oc
Energy management
Will Be Completed Before Oc
Fire Protection And Fire Safety Requirements
Will Be Completed Before Oc
Landscaping & Tree Planting
Will Be Completed Before Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Completed Before Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Completed Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Will Be Completed Before Oc
VIDEO DOOR PHONE
Will Be Completed Before Oc
Water Conservation, Rain water Harvesting
Na
Water Supply
Will Be Completed Before Oc
Buildings / Wings in Puneet Prime Phase 2 Floor 3 To Floor 16
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Puneet Prime Phase 2 Floor 3 To Floor 16 by Puneet Builderslast updated on 14 Jan 2025 as per information obtained from MARA RERA.

12039 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

68 apartments in total
Total
68
Booked
68
Available
0

Saleable Area Statistics (Sq. ft.)

27636 Total
Total
27636
Booked
27636
Available
0
Total 68 apartments in project. 68 apartments booked. 100% apartments booked.
Total 27636 Sq.ft. saleable area. 27636 saleable area booked.
100% area booked.

Puneet Prime

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Puneet PrimeJun 2024141010043
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.62 Sq.mts. ( 394 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK37.42 Sq.mts. ( 403 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK37.55 Sq.mts. ( 404 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK40.25 Sq.mts. ( 433 Sq.ft. )1
1 Booked100% Booked
100% Booked
1.5 BHK46.53 Sq.mts. ( 501 Sq.ft. )13
13 Booked100% Booked
100% Booked
1RK27.08 Sq.mts. ( 291 Sq.ft. )13
13 Booked100% Booked
100% Booked
1RK27.8 Sq.mts. ( 299 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK47.5 Sq.mts. ( 511 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK52.95 Sq.mts. ( 570 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK66.06 Sq.mts. ( 711 Sq.ft. )1
1 Booked100% Booked
100% Booked
68 total apartments / 68 apartments booked. 100% apartments booked.
Work Description in Building Puneet PrimeCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress55% done
55% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress71% done
71% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress68% done
68% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Puneet Builders
for Project
Puneet Prime Phase 2 Floor 3 To Floor 16
last updated on 14 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation