Project overview

Puranik City Reserva Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000912. Puranik City Reserva Phase 1 is located at M8ai7rxbqbeyiwnechvmtucg2bzmtlkgkvr5d8wq3nahpt+Bvbgprqnxojdztoqsfxiw3z7l8y1kf4mec1xg2+Xnigfcvpoyoodfg9hevoa5j/Dkkdzsqosqo8ipyvvq8xr1yecvxzsz+Mcaqq2zww==. This is a Ongoing being developed by Puranik Builders Limited.

Puranik City Reserva Phase 1 has 1 BHK LUXE, 1 BHK SMART, 2 BHK LUXE A, 2 BHK LUXE B, 2 BHK LUXE C, 2 BHK SMART A, 2 BHK SMART B & 2 BHK SMART C Apartments with carpet areas ranging from 411 to 627 Sq.ft. Carpet. The Project has total 1229 of which 378 are currently available for sale.

Puranik City Reserva Phase 1 is being developed on a total land area of 273915 Sq.ft. out of which 62075 Sq.ft. i.e 23% is reserved for recreational purposes. Puranik City Reserva Phase 1 has 5 Wings / Towers Commercial - Block A,T1,T3,T4,T5

ProjectDeveloperLocationPossession
Tokyo Bay Phase - 2APuranik Tokyo Bay Private LimitedKfjt/Bi/Osqcnb5v9lyz5+Flvijt2mkxsqwqnqh4oofakpr4eos5gohwzzg33w4s30-12-2024 00:00:00
Platinum TowerHaware's Housing Development Finance Corporation Ltd.Ve5ryhgoinvvhml7tefvaqzxguehfk/Eyamce2rzxo3hvzkvmunhlkibucjjsy6z30-09-2022 00:00:00
White HouseLaabh Samruddhi EnterprisesCgg2atenl/Q46sotv8wu+W==30-12-2025 00:00:00
Satgurus SolitaireBuildwell Land Developers Private LimitedWkgnycagav9avtopetyglcdibpq0os2tygumy7mtv/A=31-12-2017 00:00:00
Rosa Oasis Phase 2Uma EnterprisesLcwmlmbcwkopccf2ej8hi4acrlcozw85mti9w1gwfixohcwkqozcf4awswerkvhyqdbiyixet9aawv6vy5sweq==31-12-2018 00:00:00
FalconM/S Ace ConstructionsE1vmrlwc8mhrjuihr8toyeyfbvhfvnmjh2ynyopbhgi=30-06-2018 00:00:00
Pristine TowerIdeal DevelopersThane, 40061531-12-2017 00:00:00
ShantaiJanardhan Sakharam Bhoir8Vst+Lz+Bpizsjevejaeqw==31-12-2019 00:00:00
Fiama ResidencyFiama Construction CompanyMbw1kuefz1xuv2cl+Dng+5N3k0ace7fxpr02qtwsxhl7ooczzvfsu1h0whq7hqwe30-12-2021 00:00:00
Shree Savali Wing BUmesh Raosaheb Pawar Patil HufCombb2j6g4nbhuir+Amtfqn44bf5l9zerooijhmvqti=31-07-2019 00:00:00
Mahavir Kalpavruksha - J WingDamji Shamji Realty Pvt.Ltd.32Si2pjqdw2kv9dgpddxzc7hzhjhqoglpkgmc80v0meexnsskymeeiygrwfyxfatlysaz+Kctp2nb1h5x4ght3hnbnteqvfq+Bnhjdfjrruk7/Qpzxevk/R1vznamvg+U2ybi9zime0qo8ezesuowg==30-12-2023 00:00:00
Sai PalaceSai DeveopersDgmnztclbodnwjiji+Vveiboopjo+Fx5hjbcnjcjtny=31-03-2018 00:00:00
Mukund NiwasNew Vegas DevelopersNxorlkwdygklffrbpnbuwg==30-09-2020 00:00:00
Trinity HeightsAnil Thakurdas KursijaWvc22en0pj8xf4nns6yni562mzxhon6hrcxzhvnq9ba=30-05-2023 00:00:00
Pushpanjali Residency Phase IiiShriraam Pioneer Developers Private LimitedYushcu2wpjpeucoiquv4mlgptqzmae3k+6Lyfoknhm9opr1qosvuempldhgv4woenbwf2fvxrq3buxvc8etwk3yp1xtm+Vxp2o/L8skqbdgpkb7lf2xlk7c7qubytksi30-12-2022 00:00:00
SubodhNew Homes Corporation/Du1zaescdrfgmtagyqicuhjfdkj21rsqphn0jz3uuq=30-09-2020 00:00:00
PelicanM/S Ace ConstructionsPeymgr7edu8x3bwn86475q==30-06-2018 00:00:00
Horizon Classique-ISachin EnterprisesDqdfrgahyyq4lxrcgu2q1f6nirkaftosd21jllgm/W0=30-06-2018 00:00:00
Ace Square Phase 1Anant SquareY7wg5zbjabavulofuswwh36t+M75w3k9g7d3kptnjqk=31-12-2017 00:00:00
Puraniks CapitolPuranik Builders LimitedKfbrv+Hnys0lrlo1lemjyw==30-12-2036 00:00:00
Mahavir Kalpavruksha - Oak, Tulip, Alcacia, AlmondDamji Shamji Realty Private LimitedOwkdt1znwqmfpvq5epnpbd7jbktbuky6rdurrkuy45qsg8apnsnpavioyn2vg8bs+Tnuwryogcsq8bgmrbcgsw3fakqda9ihogeif2amkund60xrlubtv8kcow3d2itu30-12-2021 00:00:00
Kavya ParkShree Construction CompanyBye7ts1okoixtfwh97myyodbsyy03+Zh87nfq/Jzcpkhy2alrk3ryxfzlld0u+Gx6p0hr9vp2hlva74h7i8ymw==30-06-2021 00:00:00
Pehla Ghar - Shubh Sanket ComplexLaabh RealtorsThane31-12-2020 00:00:00
Horizon Classique-2Sachin Enterprises54Fp9awokgippbuxjlr/5Ty4thqwvcs3sxbebsqr1zk=30-06-2021 00:00:00
Cosmos Enclave - ChestnutMonarch Developers6Xfrsekqn1vfein870i9sw==30-12-2023 00:00:00
Ace HomesAarti EstatesRllpa9mh4pk3z5x30vwoza==30-12-2022 00:00:00
Dedhia Elita C WingJaydeep CorporationKtxie9dxa7i18agciggvudzr0schxg+Lffenznr3d+Wdrxvvvcnnd7zywfa3wo4u30-06-2018 00:00:00
Ace Square Phase 2Anant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=30-06-2024 00:00:00
Horizon Heights DShreenath EnterprisesX8rgihhobgx3svrlfvpvvg==30-07-2018 00:00:00
Shree SaketUmesh Raosaheb Pawar PatilJypuwuyvkujuvbydkju3ivba+Afsgtzzflggibw0tvi=31-07-2022 00:00:00
Metropolis - Aquaris Phase 2ANANT SQUARE2/2330-09-2025 00:00:00
Metropolis - Aquaris Phase 1ANANT SQUARE2/2330-09-2024 00:00:00
Metropolis - Insignia TowersANANT SQUARE4/4, 4/5 And 6/114-04-2026 00:00:00
HORIZON PALMS - IIIKM DEVELOPERSOld S No 63, New S No 10130-12-2024 00:00:00
Mahavir Breeze Phase 1Damji Shamji Realty Pvt. Ltd.Wtbwt3x7u0syczfrtb7/Z7r2zu+G1ji9p3oc0l6z+7B7acylot3wcjbsmebxlo5fjsqhdufb6/Bdrkp81i8yqaoet0kzpvtdazza7kbxn2h/Shvqjiawzaqyoocpllc331-12-2024 00:00:00
Tokyo Bay Phase - 1Puranik Tokyo Bay Private LimitedFqzxa3zis/Dikh+Wvgafemmvveq3wt9qsussswxmvnw=30-10-2023 00:00:00
Rumahbali Phase 2Puranik Builders Limited7M3ij+Vst261txvv4aypolelb6k7urjz50f3pdv/Kg2a2gaaurccbsxmkpu1fsnhu9gh7cfbohxkxwbr64jw1fkap4ovy7gv5juggr3cjcipnkrfodrvupjmpyggffcx30-12-2023 00:00:00
Raunak HeightsUnnathi AssociatesB1o+Whhxrxk4lx4cmzd+1S5y6q5oq+L1x9oit2t61ne=30-12-2025 00:00:00
Ashok Smruti DefgM/S KeytechZkyt8sglj5zwaoql7eoqsq==31-12-2019 00:00:00
Puranik City Reserva Phase 1Puranik Builders LimitedM8ai7rxbqbeyiwnechvmtucg2bzmtlkgkvr5d8wq3nahpt+Bvbgprqnxojdztoqsfxiw3z7l8y1kf4mec1xg2+Xnigfcvpoyoodfg9hevoa5j/Dkkdzsqosqo8ipyvvq8xr1yecvxzsz+Mcaqq2zww==30-03-2029 00:00:00
Mahavir Estella - Wing EM/S. Cityscape Construction CompanyX4krlej3qnmun9mozxwq4a8gt9y2cgvdjacr0ykc9f38yxemhayg/Neqsf/Uh7jumy4adtjxt1d2mnpoy3atohev+Cwtk+Vmfxzo+Bvq96g=31-01-2021 00:00:00
Delta Greenville - AsterDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-01-2031 00:00:00
Delta Greenville - CedarDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-12-2030 00:00:00
Cascade Avenue BellagioAarsh ConstructionW9bxqyztihyailw5sxccao6yj96w7ludbsltpyq8/T9agnoteceqke+Vzmkhsffssh88dflzjzzryrf5ug+Wyq==31-12-2026 00:00:00
Ace CourtyardAce Signature Homes LlpFzmsxsuon/Gp2bd4cobh5q==31-03-2024 00:00:00
Ace EnclaveAce Signature Homes LlpQteztealwfqqs97tllfxug==31-12-2026 00:00:00
Metropolis BaysideANANT SQUAREGhodbunder Road31-05-2026 00:00:00
Rumah Bali Phase 4Puranik Builders LimitedTku0ipksyscbhnc3nenvw6jvat1paqp31/E6pti17u4vylb5llcf58wcdewufphiq895abm7fzm15rh4ycgwnirjkzvd2hfahjqrsxr39sl5c2nt9zsbzm4lnnxutf7/Bavm8cqnuese+Lstqb33l0x5yzeufi4exzndn1wsoqh9c5iafqhbaumy+Lnvdjukkukll7pcminjwdarroc8ezpapnsm717eoomddccyboyxydmdgeyuxlrpmgsgugj4nrjal/Eilslru6auvanifmo19ijbabvpdmqu18xqbxhv0zaojpd9ajv0g45g4o1ocdq9qz9wqm/Tl/Nwlnpz9w==31-12-2028 00:00:00
Horizon Palms IiK M DevelopersHlc1/Z7mu7nnu7wkmwcmkbcezya5/Mkjkkhyhtcdh3kjhy0sg4seem9codxfe0r330-04-2022 00:00:00
Olive ResidencyGoodwill PropertiesH7koywjrvddgb6uxq+Ankxdb1a/Vkkevydnqkdptbfnetf8uocxt7yfuu48xvgzj30-12-2021 00:00:00
Aarambh - CM/S. Annapurna Lifespaces Llp7Ihunz6vvh9za4b2wseqwq==30-06-2026 00:00:00
Dahlia Bldg A D And EHaware Engineers And Builders Private LimitedQzrvclapy/Nbnckxo52aiiult+Blspjxz5wybqcpnrc=30-04-2019 00:00:00
TaranganMaison Constructions Private LimitedYfitr+Xcfpdsmaxgkbmzpgz+2B50nrc5m9nn5d5cwxeon+Vcgb2ovw3o+Ds4tfjr31-05-2018 00:00:00
Bhakti Pearl - CBhakti CorporationNlmnzhhskvqosmxxawogrg==31-12-2017 00:00:00
Puranik Home Town - EPuranik Builders LimitedWazsfdolkfxaeyd+0Vaxfrlry3psbpmbomqoa4qrtbn9a1qgzp4dltaqhgbsy+Evxzovvp239bswitkxsr7pkw==30-12-2026 00:00:00
AnthuriumAarti EstatesFrtnoe+Acn0y7sz2bbc2zb7z1bleatj5cpc3l0lnak8ytqnqu0fgmuncllozkpcii1l0oxnhaljyzidm3+L1yw==30-10-2023 00:00:00
Shree SankalpShree ConstructionsK5sggkwkxffxbbgrphmjgg==31-07-2019 00:00:00
Horizon PearlKm DevelopersAbpwlgyfigior1huxez9m0zo+2Cdphkzfkctxhmngxuxurx4fe5domqqnbtjytjm38d8j2o3+Riuenlx0weqdftkklcjbjljhucmvdpl9sxgxd3/Ewhb8cbzz03o+Dyo/Dalgdutmhwuq0onyqyiza==30-04-2027 00:00:00
PINE WOODRDC VENTURES11/831-12-2017 00:00:00
Mahavir Estella - Wing A And BCityscape Construction CoBae3d/Ukjbuux22afadashd2ptzxntmhe1roc9ocbws=31-12-2018 00:00:00
Prity Park B And C Bldg Phase 2S D Bhalerao AssociatesOwala31-12-2017 00:00:00
Elyra By PuraniksNeelshilp Constructions Private Limited31-12-2032 00:00:00
Horizon Pearl IiKm DevelopersCfdijxvzkg306qy9geu0udaqbkmegbzbxrwnmalx2gfzbtfoow69k56g8ky3mitxebpisy+Bfxa+9R2vggd7p0xl/X3smweyalhheekbmpu=31-12-2028 00:00:00
Joy SquareAnant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=31-12-2019 00:00:00
Guru AshishShree Gurukrupa Ventures LlpEkycmc6j94nhl7d1zcsz9q==31-12-2018 00:00:00
Trimity AshwaTrimity ConstructionsYbxzv9tsjwpvpr6mjirz9a==31-12-2017 00:00:00
KIPL Moryakhade Infrastructre Pvt. Ltd.S.No. 21/12,13,1430-06-2021 00:00:00
Ace AristoGaurav Land CorporationRfabwxl0jzmylvcd/Yao9mgekebhfe1pt/Cwwvhaxf7biuxytm1nddrtcym/Wcml31-10-2026 00:00:00
Intelligentia Segment By Haware PropertiesSuresh Kashinath Haware1Pwsmo0jgein00kqzhd8/G==31-12-2027 00:00:00
Puraniks Unicorn Phase 2Puranik Builders LimitedRr1rrykv6ugvifnfn1rrvijxfgf8hbxxzhkl+Xriq1i/Vzc7ztnbgthwcsqrowiltme3o2n2x3jsfzrrwse+Qg==31-12-2029 00:00:00
HORIZON PALMS IVKM DEVELOPERSOld Survey No 68, Hissa No 1/231-12-2027 00:00:00
Project Details
  • Project:
    Puranik City Reserva Phase 1
  • Location:
  • M8ai7rxbqbeyiwnechvmtucg2bzmtlkgkvr5d8wq3nahpt+Bvbgprqnxojdztoqsfxiw3z7l8y1kf4mec1xg2+Xnigfcvpoyoodfg9hevoa5j/Dkkdzsqosqo8ipyvvq8xr1yecvxzsz+Mcaqq2zww==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Mar 2029
Developer Details

  • Developer:
    Puranik Builders Limited
  • Phone:
  • Address:
  • Puraniks One
Project RERA Details
MAHA REARA No: P51700000912
Project Type Others
RERA Project Status Ongoing
Architect Vastushilpa Associates
Funding Bank HDFC BANK
Proposed Possession 30 Mar 2029
Revised Possession 30 Mar 2029
Extended Possession
Litigations No Litigations
Last Modified 20 Aug 2025
Last Retrived 13 Feb 2026
Puranik City Reserva Phase 1 QR Code
Puranik City Reserva Phase 1
MahaRERA - P51700000912
Apartment Details & Configuration
TypeArea
Shop 131.5 Sq.mts. ( 339 Sq.ft. )
Shop 1022.13 Sq.mts. ( 238 Sq.ft. )
Shop 1121.55 Sq.mts. ( 232 Sq.ft. )
Shop 1722.7 Sq.mts. ( 244 Sq.ft. )
Shop 1827.94 Sq.mts. ( 301 Sq.ft. )
Shop 1924.72 Sq.mts. ( 266 Sq.ft. )
Shop 230.45 Sq.mts. ( 328 Sq.ft. )
Shop 2124.7 Sq.mts. ( 266 Sq.ft. )
Shop 329.42 Sq.mts. ( 317 Sq.ft. )
Shop 428.38 Sq.mts. ( 305 Sq.ft. )
Shop 527.34 Sq.mts. ( 294 Sq.ft. )
Shop 626.29 Sq.mts. ( 283 Sq.ft. )
Shop 725.26 Sq.mts. ( 272 Sq.ft. )
Shop 824.21 Sq.mts. ( 261 Sq.ft. )
Shop 923.18 Sq.mts. ( 250 Sq.ft. )
1 BHK A41.54 Sq.mts. ( 447 Sq.ft. )
1 BHK B39.09 Sq.mts. ( 421 Sq.ft. )
1 RK A25.75 Sq.mts. ( 277 Sq.ft. )
1 RK B29.48 Sq.mts. ( 317 Sq.ft. )
1 RK C27.49 Sq.mts. ( 296 Sq.ft. )
1 RK D28.67 Sq.mts. ( 309 Sq.ft. )
1 RK E28.87 Sq.mts. ( 311 Sq.ft. )
2 BHK A55.21 Sq.mts. ( 594 Sq.ft. )
2 BHK B52.62 Sq.mts. ( 566 Sq.ft. )
1 BHK LUXE38.22 Sq.mts. ( 411 Sq.ft. )
2 BHK LUXE A58.28 Sq.mts. ( 627 Sq.ft. )
2 BHK SMART A54.23 Sq.mts. ( 584 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Puranik City Reserva Phase 1last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Done After Last Bldg Oc In Project Pcr
Club House
Will Be Done After Last Bldg Oc In Project Pcr
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Will Be Done Prior To Oc
Energy management90% completed
90% Complete
Will Be Done Prior To Oc
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Will Be Done Prior To Oc
Landscaping & Tree Planting80% completed
80% Complete
Will Be Done Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Will Be Done Prior To Oc
Solid Waste Management And Disposal100% completed
95% Complete
Will Be Done Prior To Oc
Storm Water Drains100% completed
95% Complete
Will Be Done Prior To Oc
Street Lighting50% completed
50% Complete
Will Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Will Be Done Prior To Oc
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Prior To Oc
Water Supply100% completed
95% Complete
Will Be Done Prior To Oc
Buildings / Wings in Puranik City Reserva Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Puranik City Reserva Phase 1 by Puranik Builders Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

273915 Sq. ft.

Project Area

62075 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

1229 apartments in total
Total
1229
Booked
851
Available
378

Saleable Area Statistics (Sq. ft.)

592550 Total
Total
592550
Booked
407323
Available
185227
Total 1229 apartments in project. 851 apartments booked. 69% apartments booked.
Total 592550 Sq.ft. saleable area. 407323 saleable area booked.
69% area booked.

Commercial - Block A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Commercial - Block AMar 202811000020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop 131.5 Sq.mts. ( 339 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1022.13 Sq.mts. ( 238 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1121.55 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1221.55 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1321.55 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1421.55 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1521.55 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1621.55 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1722.7 Sq.mts. ( 244 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1827.94 Sq.mts. ( 301 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 1924.72 Sq.mts. ( 266 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 230.45 Sq.mts. ( 328 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 2024.72 Sq.mts. ( 266 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 2124.7 Sq.mts. ( 266 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 329.42 Sq.mts. ( 317 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 428.38 Sq.mts. ( 305 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 527.34 Sq.mts. ( 294 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 626.29 Sq.mts. ( 283 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 725.26 Sq.mts. ( 272 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 824.21 Sq.mts. ( 261 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop 923.18 Sq.mts. ( 250 Sq.ft. )1
None Booked0% Booked
0% Booked
21 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Commercial - Block ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

T1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
T1Mar 20284210120249
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A41.54 Sq.mts. ( 447 Sq.ft. )60
59 Booked98% Booked
98% Booked
1 BHK B39.09 Sq.mts. ( 421 Sq.ft. )100
100 Booked100% Booked
100% Booked
1 RK A25.75 Sq.mts. ( 277 Sq.ft. )15
14 Booked93% Booked
93% Booked
1 RK B29.48 Sq.mts. ( 317 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 RK C27.49 Sq.mts. ( 296 Sq.ft. )15
15 Booked100% Booked
100% Booked
1 RK D28.67 Sq.mts. ( 309 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 RK E28.87 Sq.mts. ( 311 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 RK F27.34 Sq.mts. ( 294 Sq.ft. )12
11 Booked91% Booked
91% Booked
2 BHK A55.21 Sq.mts. ( 594 Sq.ft. )25
25 Booked100% Booked
100% Booked
2 BHK B52.62 Sq.mts. ( 566 Sq.ft. )45
44 Booked97% Booked
97% Booked
311 total apartments / 305 apartments booked. 98% apartments booked.
Work Description in Building T1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress74% done
74% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress51% done
51% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

T3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
T3Mar 20284710120270
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK LUXE38.22 Sq.mts. ( 411 Sq.ft. )48
None Booked0% Booked
0% Booked
1 BHK SMART38.22 Sq.mts. ( 411 Sq.ft. )132
None Booked0% Booked
0% Booked
2 BHK LUXE A58.28 Sq.mts. ( 627 Sq.ft. )41
None Booked0% Booked
0% Booked
2 BHK LUXE B58.28 Sq.mts. ( 627 Sq.ft. )27
None Booked0% Booked
0% Booked
2 BHK LUXE C58.28 Sq.mts. ( 627 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK SMART A54.23 Sq.mts. ( 584 Sq.ft. )46
None Booked0% Booked
0% Booked
2 BHK SMART B54.23 Sq.mts. ( 584 Sq.ft. )30
None Booked0% Booked
0% Booked
2 BHK SMART C54.23 Sq.mts. ( 584 Sq.ft. )14
None Booked0% Booked
0% Booked
351 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building T3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

T4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
T4Mar 20283710120210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Luxe38.22 Sq.mts. ( 411 Sq.ft. )36
36 Booked100% Booked
100% Booked
1 BHK Smart38.22 Sq.mts. ( 411 Sq.ft. )104
104 Booked100% Booked
100% Booked
2 BHK Luxe A58.28 Sq.mts. ( 627 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK Luxe B58.28 Sq.mts. ( 627 Sq.ft. )22
22 Booked100% Booked
100% Booked
2 BHK Luxe C58.28 Sq.mts. ( 627 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK Smart A54.23 Sq.mts. ( 584 Sq.ft. )36
36 Booked100% Booked
100% Booked
2 BHK Smart B54.23 Sq.mts. ( 584 Sq.ft. )24
24 Booked100% Booked
100% Booked
2 BHK Smart C54.23 Sq.mts. ( 584 Sq.ft. )10
10 Booked100% Booked
100% Booked
273 total apartments / 273 apartments booked. 100% apartments booked.
Work Description in Building T4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

T5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
T5Dec 20243710120210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK LUXE38.22 Sq.mts. ( 411 Sq.ft. )36
36 Booked100% Booked
100% Booked
1 BHK SMART38.22 Sq.mts. ( 411 Sq.ft. )104
104 Booked100% Booked
100% Booked
2 BHK LUXE A58.28 Sq.mts. ( 627 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK LUXE B58.28 Sq.mts. ( 627 Sq.ft. )22
22 Booked100% Booked
100% Booked
2 BHK LUXE C58.28 Sq.mts. ( 627 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK SMART A54.23 Sq.mts. ( 584 Sq.ft. )36
36 Booked100% Booked
100% Booked
2 BHK SMART B54.23 Sq.mts. ( 584 Sq.ft. )24
24 Booked100% Booked
100% Booked
2 BHK SMART C54.23 Sq.mts. ( 584 Sq.ft. )10
10 Booked100% Booked
100% Booked
273 total apartments / 273 apartments booked. 100% apartments booked.
Work Description in Building T5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Puranik Builders Limited
for Project
Puranik City Reserva Phase 1
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation