Project overview

Raunak Imperial is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700052635. Raunak Imperial is located at Ghodbunder Road, Kolset, Kolset. This is a New Project being developed by Raunak Avenue Realty.

Raunak Imperial has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 466 to 853 Sq.ft. Carpet. The Project has total 33 of which 33 are currently available for sale.

Raunak Imperial is being developed on a total land area of 11948 Sq.ft. Raunak Imperial has 1 Wings / Towers Raunak Imperial - Building No 1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Raunak Imperial
  • Location:
  • Ghodbunder Road, Kolset, Kolset
  • Const. Stage:
    New Project
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Raunak Avenue Realty
  • Phone:
  • Address:
  • A/5, Satnam Apartment, Lt Road, Mulund East, Mulund East, 400081
Project RERA Details
MAHA REARA No: P51700052635
Project Type Residential
RERA Project Status New Project
Funding Bank ICICI BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Feb 2024
Last Retrived 16 Jan 2025
Raunak Imperial QR Code
Raunak Imperial
MahaRERA - P51700052635
Apartment Details & Configuration
TypeArea
1 BHK43.26 Sq.mts. ( 466 Sq.ft. )
2 BHK63.76 Sq.mts. ( 686 Sq.ft. )
3 BHK79.2 Sq.mts. ( 853 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Raunak Imperiallast updated on 16 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
0
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Raunak Imperial
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Raunak Imperial by Raunak Avenue Realtylast updated on 16 Jan 2025 as per information obtained from MARA RERA.

11948 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

33 apartments in total
Total
33
Booked
0
Available
33

Saleable Area Statistics (Sq. ft.)

21883 Total
Total
21883
Booked
0
Available
21883
Total 33 apartments in project. 0 apartments booked. 0% apartments booked.
Total 21883 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Raunak Imperial - Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Raunak Imperial - Building No 1Dec 202661010094
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.26 Sq.mts. ( 466 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK63.76 Sq.mts. ( 686 Sq.ft. )12
None Booked0% Booked
0% Booked
3 BHK79.2 Sq.mts. ( 853 Sq.ft. )10
None Booked0% Booked
0% Booked
33 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Raunak Imperial - Building No 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Raunak Avenue Realty
for Project
Raunak Imperial
last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation