Project overview

Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd. is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800006765. Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd. is located at W1uctr/Wqtozxf9hv8eega==. This is a Ongoing being developed by Kaustubh Construction Private Limited.

Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd. has 2 BHK & 3 BHK Apartments with carpet areas ranging from 842 to 1060 Sq.ft. Carpet. The Project has total 172 of which 19 are currently available for sale.

Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd. is being developed on a total land area of 34211 Sq.ft. Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd. has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Casa RareGeopreneur Corp Pvt LtdVixn1njzx8tt8ilbh+9Ydq==31-03-2019 00:00:00
Casa PalazzoM/S. Paradigm Real Estates LlpS88wb9moxtmq8xnfermcvomvv5lqfw6xy2xdqyc6k/Jflclbk5uqpkkqthyfjjc9vtgrhqsqluogbi9snrlp2s2cuhdwlpochmgtflv589gwt4v/Xbkopz3gog1nh14e31-03-2019 00:00:00
Ariana ResidencyJ V Realty And Developers7P/4Bhu6knjdb+C0canpagykkps/Q63dzbcuwv2ltdnaoopq67mpdupuyn3wuwp2j5xkfpxtecgbmzpbwyky5mvfmqd1bnrxyn8ylb+R8mu/Oyyla8zneyrwpd7gr7+Nmnd2zgnw98kktvhl8g3aqw==30-06-2021 00:00:00
Shivoham EnclaveSiddheshwar Builders Pvt. Ltd.J5f3xujzws9ecduqdva8set5x4bm4h0cyvryxrughrfpepn/M5uocbqmtm90oylnk79jc3fjud3yjedtx8pos8fmusnj9ulg7xtamjj0r9htslc+6Zisej5axfjfd+Vc30-06-2022 00:00:00
Rakhi Tower Phase 1Western DevelopmentsGvw2geojwue7eaj/O27j/Ggafjos6tc40t5xk5hw12u=21-12-2019 00:00:00
Rite PerintoRite Developers Pvt. Ltd.Oveyhwbt7dyj0ko3fjyfj6u+466Agevu5lldk9n10xa=30-03-2021 00:00:00
Borivali Neelkanth Nagar Chs LtdMahavir InfrastructureYdhr4fsuj+7Byghyw2yfrodabfikvt4tj+Yp26o4vpwuknkswd0nvbosm0hx1jpn31-12-2020 00:00:00
Borivali Padam ChslAmisha Constructions Private LimitedVkjxlk7ram1q9lc2x7nr4s30zxb9qiwtevzgcndvmuu=30-06-2025 00:00:00
OmkareshwarTriumph VenturesLn/U3za3tme5ntec4so27g==31-12-2024 00:00:00
Mehta Premiere-ResidentialAsiatic Trading And Construction CompanyZmbpqw4w0phlkhn0qnbzr6tjewwulbmvsmvskcgghfy=31-12-2025 00:00:00
Om SamarpanK Mehta And Company+Uqdatqq02brjolymxnkr3lttugfltghgmgs9rljvi0=31-07-2019 00:00:00
WintergreenCci Projects Private LimitedGvo9btu5fmviw6elavipq5zlwrcz/Awcahqpllr5rxe=31-12-2019 00:00:00
Shiv AaradhanaBrightmen Buildspaces Llp7Jamtfw/Rdpu3yhhqqbqgw==30-12-2023 00:00:00
Sky City Towers A To DIncline Realty Private LimitedIsizseskugi5dinlzfiyhz8to4qj3csaz4ctzr+Akumrdtotuuyn95bvgpg8sxb330-12-2023 00:00:00
Rustomjee SummitKeystone Realtors LimitedTrhrq1qevvvlgmgvnylxyq==31-12-2021 00:00:00
Pushp Vinod-3Vas Infrastructure Ltd.Mumbai Suburban, 40009215-12-2015 00:00:00
Rosary Villa Co Operative Housing Society LimitedJay Vee ConstructionSmc3c8vt9gqayrpksbnocbidztvqgxcrxfwji3cxoa3bb7mihz9+Gnu57pouxnvc31-03-2018 00:00:00
Palkhi AuraKcd And Synergy VenturesDukgb9/Ysupj/Tnranawig==31-12-2019 00:00:00
Ekta Apartment Upto 17Th FloorAditya Enterprise 0F6qnzdzeajed7+Kubynjq==31-03-2019 00:00:00
Om Sarjan ChslGlasswood Realty Private LimitedS9enuv1vhiacwso9y5l5y0oag3rnv1xfv5plmxj4cac=31-12-2019 00:00:00
Madhuban HeightsWadhwana Housing Development And Infrastructure CoMr7gfpfibxc3wn06xrp4za==31-08-2018 00:00:00
Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.Kaustubh Construction Private LimitedW1uctr/Wqtozxf9hv8eega==31-12-2018 00:00:00
Rishabraj Park VistasH Rishabraj RealtyMorxh9esfwykp2n9n3/Ezg==31-12-2025 00:00:00
Anjani TirthGeeta Space RealtorsVrzjq5fysmd3amvbjrodzpxyrlw3fssw28reuy0g7dc=31-12-2024 00:00:00
Auris Business CentreDev Pooja Builders Pvt LtdCu5b0fb2nzes96gktfdr1q==31-12-2024 00:00:00
Magathane Press Enclave ChslDhariwal Developers (India) Private LimitedArehvvwkasuq7f/Hbld+Zq==10-03-2027 00:00:00
Ajmera ManorAjmera Manor Private LimitedLoxnpde8y8i2c6e4hwy2uzhz6y/Ujtjehwd7gxngt4qge2turucvzhchpekftbpf31-12-2025 00:00:00
Anamika Niwas ChslltdAnamika Niwas Chs Ltd5Inqwywnmihmpaqjocgw8a==31-03-2024 00:00:00
Sky City Tower GIncline Realty Private Limited6Xvgy8exxz1fnyng0oqon7dzzphhyeafhtubxky9jhhs2o0nt2beyigul+L/Ruab31-12-2027 00:00:00
Orchid TowerShree Laxmi Estate Pvt. Ltd.Wghra9fonmcak01tbhciuzlcoe4bsz8vimwj90trrgc=31-03-2026 00:00:00
AureateNext Space Realty LlpOhchb6psvfj/En2idpcl4em2tb4el7sr57gzd8qsush+9A8eokb4cocprz1lxtd+Scc4oee7npieigze+Vuyi6gi7lhb/Bbrkmzar3xi3u4x/Siirv6m1gp+Iasycvwa30-06-2027 00:00:00
Paarijat Chs LtdMaan Housing DevelopmentJdyxeqv4l38axjqbbithnq==31-12-2018 00:00:00
Rooprajat EnclaveSiddhivinayak DevelopersVt1crgrkjcyrwe9o+Wfgyw==30-12-2021 00:00:00
Krishna KamalGraphic Housing Developments Pvt. Ltd.Yek7e9xwzpvdlweiiuj5jw==01-03-2020 00:00:00
Rustomjee PinnacleKeystone Realtors LimitedTrhrq1qevvvlgmgvnylxyq==31-12-2018 00:00:00
Satra ParkShreenivas Developers9Cai4tmnfwz7i1kmnhlukw==30-12-2021 00:00:00
Redevlopment Of Sun And Moon Chs Ltd. Bldg No. 12 And 13Kaustubh Construction Private LimitedPnvehsygmwzgjjzzxpxbcq==31-12-2019 00:00:00
VrindavanRight Channel Construction Pvt LtdCarter Road No 331-12-2017 00:00:00
Kcd RidgewoodKcd Heritage Pvt LtdBorivali, 400092, Mumbai Suburban29-02-2020 00:00:00
Mangaldeep Chsl.Dhariwal Constructions (India) Private LimitedRnk+Jy4nhvebkxodliafmg==31-12-2018 00:00:00
Shiv LilamNavkarmik Infra & Development Private LimitedJo2zhhrbxnjk5rww/Gzxzw==01-03-2025 00:00:00
ZENONENTITY DEVELOPERS PRIVATE LIMITEDDattapada Road, Opp Dattapada Bmc School31-12-2025 00:00:00
MahirrShree Balaji EnterpriseDuezwocs3vf4adbaa7ytuv8fa2qn0es2p4f+Manpxl4=31-12-2026 00:00:00
Ipsit Anand MangalNavkar Developers9Sgjge1/Brkn6ea6uvzb2d8b9qnqewkerqdvkea5eh/V43sjittny7shqgihaxuf2losw56+Xrln361adla61g==31-12-2027 00:00:00
The Jambli Galli Chs LtdMahavir Corporations5Iyewjzapmayblkx9vbwgq==31-03-2024 00:00:00
Raghav ParadiseVeda Infra ProjectsHdjvc+Vzms3fd6tkzfnmlg==31-12-2024 00:00:00
Maya MamtaGreenbuilding Lifescapes LlpXg9ydromzadlfey8cid30w==07-10-2025 00:00:00
Alliance EternisAlliance City Developers Realtors Pvt LtdBbqmsplyj2zf7c4vhhn6ig==30-04-2027 00:00:00
Dollars Avenue ChslM/S Hirani RealtorsWdo3hbdvzglkjxpv7pziyw==02-11-2027 00:00:00
Nl Park ViewBeautiful Properties Private Limited7Wc8wboqyzanjjzvthp+Na==30-05-2028 00:00:00
Nicco Vanashri And Nicco HeightsNew India Construction CompanyVglwg6wrkpn/Lssjs3t+Uixqq54hgvcr9yhyt4d+77Efjrrd4klw1epwrygfxu2n31-12-2028 00:00:00
Jayakunj Apartment ChslJayakunj Apartment Chsl8Ykwj2d3vb2yh6dqhqcfhq==30-10-2022 00:00:00
SamtaGreen Tree Lifescapes LlpEf8olezrxhxcsnr+Mmfhjq==01-08-2022 00:00:00
Rite Nectar Phase IiRite Developers Pvt. Ltd.D/0Fkugluqrtv2a0qphndw==30-09-2022 00:00:00
KrishnaSunit EnterpriseGvraf+1J3ddtii56966mxtewpyheuwlag0rn33bkqnw=30-12-2028 00:00:00
Esspee TowerBhatia Builders And Developers Pvt LtdcFnkktm///Z4l76fdwtreka==30-06-2021 00:00:00
MadhukunjDhara ConstructionDu2qhvj00imo+Duwgrfvsodo93hcxfvh1+Ehyptkdas=31-03-2018 00:00:00
Akar PinnacleAkar Creations Private LimitedDs2s0vhmfqxrszdxje+Kcg==31-12-2017 00:00:00
Ankur PalaceOsho Developers6+Zboysub/Z3mqeckaqfbg==15-08-2019 00:00:00
Samet Sikar MahalKothari Construction CompanyCgiva6txrjalqohy/53Xevtlteom5mohgwvbmkrvfwqjdnjgdefki5/Bwmuodqu8j7u1bguvhgclddhrheuahq==31-12-2018 00:00:00
Signia High, Magathane, Western Express Highway, Borivali EastSunteck Realty Limited9Yiofdqonggp5dhfijjsvhmmaallhvwy+Xmchr+Cooe=28-02-2021 00:00:00
Ami ChslMehta Group3Cyxjzqnds9b5p672mkkpswkkxzb3rmp5fu2l7xrp3zb7cbmkqotsyqgseoacdcr31-12-2018 00:00:00
Fortune Avirahi Wing AFortune ConstructionsXdxuagp4+Pjlndvykxvbkkjtrblhqjyap/13X7iqiw4=30-12-2022 00:00:00
Mayur Pankh Chs Ltd.Brightmen Buildspaces LlpOdltdaghukpxcdmkngovwa==30-12-2022 00:00:00
Rakhi Tower Phase 2 9Th To 11Th Floor PartWestern DevelopmentsMumbai Suburban, 40006621-12-2020 00:00:00
Sakshat NavkarNavkar Infra Projects4Ftzuz95iazeikpjlkzhpxgu/3Gdk1xd0tqiz1pnwss=30-09-2019 00:00:00
Sajag ChsNavkar Infra Projects5S6snxgjtjt3dgklkx6bmw==24-06-2019 00:00:00
Dlh KesleyDlh Pansn Developers LlpLthbsqomckzkfg2zc39f9g==31-03-2019 00:00:00
Meghalok HeightsS S Landmark Private LimitedQw2twsb5a9yzwpm50pvrkw==31-12-2025 00:00:00
Preesha ParadiseVastu Realtors And DevelopersMlhmjwgmcni5mg0ujpmpqg==31-12-2025 00:00:00
Rivali Park - SunburstCci Projects Private LimitedTewscg0+Oi9ocasccbketg==31-08-2028 00:00:00
Ekta Appartment From 18Th Floor To 22Nd FloorAditya Enterprise 0F6qnzdzeajed7+Kubynjq==30-12-2021 00:00:00
SiddhivinayakTriumph Ventures0F6qnzdzeajed7+Kubynjq==30-06-2021 00:00:00
Jessika Chs.Ltd.Vinayak DevelopersPa/Neqil66m+54Atxxa7ow==30-12-2020 00:00:00
Rathi NiveraGhori Developers3Aoc9iyia6z/0Vu90u3ovg==31-12-2026 00:00:00
Zen PristineKonark Shakti Group Of CompanyBx/Ic+Ygfnc7f2cnmgfj5w==31-12-2028 00:00:00
Dahisar Sagar Co-Operative Housing Society LimitedM/S. Trilogy Realtors Private LimitedCkzlimpqf4eofeb7x6lhpq==31-12-2029 00:00:00
AriaAum Zyj Developers Llp.Pibj3ccfkdebsgjohjamtq==31-10-2027 00:00:00
Ashtavinayak NxAshtavinayak InfrastructureUmmfxwidvtcdgy0zl4p75cjkqltugqi6szkwd3bi91q=31-03-2019 00:00:00
Shraddha ParadiseShraddha Prime Projects LimitedPp5wyv8nhamja7wycq9rilfg7/H+Aerux2fby84fxys=31-12-2028 00:00:00
Proposed Red On Plot Bearing Fp No 40 Of Tps Iii Village Borivali West MumbaiSurbhi Midas ConstructionC8bjqxgwo1fvz2enmax3sq==31-05-2025 00:00:00
Harsiddhi Sadan Chs LtdRk ConstructionS78jumgciz8wvvdk/Knb9g==30-06-2025 00:00:00
Arvind NiwasHridyaa Infraprojects LlpW/Gakpvhyola7dreedzrrewrq7lw9mes5wwqwamg9/Tlkdaz0knyqea56lucakat30-06-2025 00:00:00
Rivali Park - StargazeCci Projects Private LimitedTewscg0+Oi9ocasccbketg==31-10-2029 00:00:00
SwastikReliance CorporationDxcyhwmruvmzh2l9bqfvqg==30-09-2026 00:00:00
Anmol ResidencyB B EnterpriseNe2gbhrptgulmii1ocepyg==31-12-2028 00:00:00
Anjani ShikharGeetaspans Realtors Private Limited1Kx3kwz3nd1gs73m5wlhxg==31-12-2027 00:00:00
TreviAshirwad Nice Developers1Bhxkrolxvxgicmpwczdgstiiqamtmutvici0x+R5rw=31-12-2025 00:00:00
Saraswati SadanS.S. EnterpriseMumbai City, 40006631-12-2019 00:00:00
Siddhi Apartment ChsK. Talsania ConstructionsDqw1/Pqlu48bxm2al2ihtg==30-12-2025 00:00:00
Rivali Park - MoonriseCci Projects Private LimitedTewscg0+Oi9ocasccbketg==30-06-2030 00:00:00
Balaji Heights Redevelopment Of Rajendra Nagar Om Sairam Chs LtdBalaji Builders And DevelopersIi3/Ouu7o9ncusak2/Idxg==31-05-2027 00:00:00
Parshuram HeightsSpacewalk Realty Llp30-09-2028 00:00:00
Himat Mansion Chs LtdBhatia Builders And Developers Pvt LtdcTa2a4komixsk0cnxcinfua==30-06-2027 00:00:00
AAKRUTI BUILDING NO. 4 AND 5AAKRUTI BUILDERS & DEVELOPERS15A/2/B/1 And 15A/4,5A,6A And 18/1,2,3 And 19/1,2 And 20,1,230-06-2021 00:00:00
AtulyaPhoenix Developers/2Iy8ztmc4wnu4ewskljea==31-12-2026 00:00:00
Nirala OpalShree Nirala Construction30-06-2029 00:00:00
Megh Mahal ChslSamarpan Homes & Developers31-12-2027 00:00:00
Sambhav Darshan Purshottam Park Co-Operative Housing Society LtdSamarpan Homes & Developers31-12-2027 00:00:00
GiirnarMahavir Land Developer31-12-2029 00:00:00
Shreenath RegencyShreenathji Infracon Build Private Limited31-10-2027 00:00:00
The CrimsonI M Builtkon Private Limited30-12-2030 00:00:00
Vanita Niketan Co Operative Housing SocietySamarpan Buildtech Llp31-12-2028 00:00:00
Narayan ResidencyNarayan Vventures30-01-2030 00:00:00
Rivali Park - SkyleapCci Projects Private Limited31-07-2032 00:00:00
Gold LeafShelaji Horizon Llp31-12-2029 00:00:00
66 Infinia Parsh Realtors31-12-2028 00:00:00
One ReserveNeminath And Disha Realtors31-12-2030 00:00:00
Sky City Tower FIncline Realty Private Limited6Xvgy8exxz1fnyng0oqonw6y6gvgdngl4xiu75iwsshrmcqa7x6t0t093i51vone30-06-2027 00:00:00
Rbies Jaidatta ChslRbies Jaidatta ChslO5bnrb2zlbe2nbygomxozg==31-12-2023 00:00:00
Project Details
  • Project:
    Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.
  • Location:
  • W1uctr/Wqtozxf9hv8eega==
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Kaustubh Construction Private Limited
  • Phone:
  • Address:
  • Gundecha Solitaire Premises
Project RERA Details
MAHA REARA No: P51800006765
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Creative Consultants & Designeers (Prop. Vinayak V. Patil)
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 25 Jan 2019
Last Retrived 13 Feb 2026
Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd. QR Code
Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.
MahaRERA - P51800006765
Apartment Details & Configuration
TypeArea
1 BHK54.11 Sq.mts. ( 582 Sq.ft. )
2 BHK TYPE 177.19 Sq.mts. ( 831 Sq.ft. )
2 BHK TYPE 263.18 Sq.mts. ( 680 Sq.ft. )
2 BHK TYPE 375.98 Sq.mts. ( 818 Sq.ft. )
3 BHK TYPE 183.51 Sq.mts. ( 899 Sq.ft. )
3 BHK TYPE 2101.09 Sq.mts. ( 1088 Sq.ft. )
3 BHK TYPE 3101.71 Sq.mts. ( 1095 Sq.ft. )
3 BHK TYPE 484.53 Sq.mts. ( 910 Sq.ft. )
4 BHK116.02 Sq.mts. ( 1249 Sq.ft. )
STUDIO APARTEMT20.19 Sq.mts. ( 217 Sq.ft. )
1 BHK43.35 Sq.mts. ( 467 Sq.ft. )
1 RK31.35 Sq.mts. ( 337 Sq.ft. )
2 BHK71.05 Sq.mts. ( 765 Sq.ft. )
2 BHK78.19 Sq.mts. ( 842 Sq.ft. )
3 BHK98.48 Sq.mts. ( 1060 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
O.C. Received
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
O.C. Received
FITNESS CENTRE100% completed
95% Complete
O.C. Received
Landscaping & Tree Planting100% completed
95% Complete
O.C. Received
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
O.C. Received
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
O.C. Received
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
O.C. Received
Water Supply100% completed
95% Complete
O.C. Received
Buildings / Wings in Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd. by Kaustubh Construction Private Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

34211 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

172 apartments in total
Total
172
Booked
153
Available
19

Saleable Area Statistics (Sq. ft.)

138147 Total
Total
138147
Booked
121182
Available
16965
Total 172 apartments in project. 153 apartments booked. 88% apartments booked.
Total 138147 Sq.ft. saleable area. 121182 saleable area booked.
88% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 2018230012090
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK54.11 Sq.mts. ( 582 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK TYPE 177.19 Sq.mts. ( 831 Sq.ft. )20
20 Booked100% Booked
100% Booked
2 BHK TYPE 263.18 Sq.mts. ( 680 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK TYPE 375.98 Sq.mts. ( 818 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK TYPE 183.51 Sq.mts. ( 899 Sq.ft. )18
14 Booked77% Booked
77% Booked
3 BHK TYPE 2101.09 Sq.mts. ( 1088 Sq.ft. )17
17 Booked100% Booked
100% Booked
3 BHK TYPE 3101.71 Sq.mts. ( 1095 Sq.ft. )19
19 Booked100% Booked
100% Booked
3 BHK TYPE 484.53 Sq.mts. ( 910 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK116.02 Sq.mts. ( 1249 Sq.ft. )1
1 Booked100% Booked
100% Booked
STUDIO APARTEMT20.19 Sq.mts. ( 217 Sq.ft. )2
None Booked0% Booked
0% Booked
82 total apartments / 74 apartments booked. 90% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2018230012078
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.35 Sq.mts. ( 467 Sq.ft. )37
37 Booked100% Booked
100% Booked
1 RK31.35 Sq.mts. ( 337 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK71.05 Sq.mts. ( 765 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK TENANT REHAB71.05 Sq.mts. ( 765 Sq.ft. )24
24 Booked100% Booked
100% Booked
78 total apartments / 78 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 2018150012017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK78.19 Sq.mts. ( 842 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK98.48 Sq.mts. ( 1060 Sq.ft. )11
12 total apartments / 1 apartments booked. 8% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kaustubh Construction Private Limited
for Project
Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation