Project overview

Regency Anantam Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017874. Regency Anantam Phase I is located at Dawadi, Dombivli, Dombivli. This is a New Project being developed by Regency Nirman Ltd.

Regency Anantam Phase I has 2 BHK Apartments with carpet areas ranging from 636 to 640 Sq.ft. Carpet. The Project has total 1327 of which 28 are currently available for sale.

Regency Anantam Phase I is being developed on a total land area of 997363 Sq.ft. out of which 206037 Sq.ft. i.e 21% is reserved for recreational purposes. Regency Anantam Phase I has 8 Wings / Towers Commercial Building No 1,Daffodil Building No 11,Elymus Building No 12,Fern Building No 13,Garget Building No 14,Gloria Building No 15,Lavender Building No 16,Marigold Building No 17

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Regency Anantam Phase I
  • Location:
  • Dawadi, Dombivli, Dombivli
  • Const. Stage:
    New Project
  • Possession:
    30 Mar 2022
Developer Details

  • Developer:
    Regency Nirman Ltd
  • Phone:
  • Address:
  • 1St Floor, Regency House, Opp. Vishnu Darshan, Near Aman Talkies Road, Near Aman Talkies Road, 421002
Project RERA Details
MAHA REARA No: P51700017874
Project Type Others
RERA Project Status New Project
Architect Vitan Consultants
Funding Bank The Saraswat Co operative Bank Ltd
Proposed Possession 30 Mar 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Jan 2024
Last Retrived 16 Jan 2025
Regency Anantam Phase I QR Code
Regency Anantam Phase I
MahaRERA - P51700017874
Apartment Details & Configuration
TypeArea
Shops24.4 Sq.mts. ( 263 Sq.ft. )
2 BHK59.1 Sq.mts. ( 636 Sq.ft. )
2 BHK59.5 Sq.mts. ( 640 Sq.ft. )
1 BHK40 Sq.mts. ( 431 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Regency Anantam Phase Ilast updated on 16 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
-
Community Buildings100% completed
95% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
-
Energy management
-
Fire Protection And Fire Safety Requirements100% completed
95% Complete
-
Landscaping & Tree Planting100% completed
95% Complete
-
Open Parking100% completed
95% Complete
-
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
-
Solid Waste Management And Disposal100% completed
95% Complete
-
Storm Water Drains100% completed
95% Complete
-
Street Lighting100% completed
95% Complete
-
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
-
Water Conservation, Rain water Harvesting100% completed
95% Complete
-
Water Supply100% completed
95% Complete
-
Buildings / Wings in Regency Anantam Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Regency Anantam Phase I by Regency Nirman Ltdlast updated on 16 Jan 2025 as per information obtained from MARA RERA.

997363 Sq. ft.

Project Area

206037 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

1327 apartments in total
Total
1327
Booked
1299
Available
28

Saleable Area Statistics (Sq. ft.)

755930 Total
Total
755930
Booked
747657
Available
8273
Total 1327 apartments in project. 1299 apartments booked. 97% apartments booked.
Total 755930 Sq.ft. saleable area. 747657 saleable area booked.
99% area booked.

Commercial Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Commercial Building No 1Mar 20212100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shops24.4 Sq.mts. ( 263 Sq.ft. )39
14 Booked35% Booked
35% Booked
39 total apartments / 14 apartments booked. 35% apartments booked.
Work Description in Building Commercial Building No 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Daffodil Building No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Daffodil Building No 11Dec 202026111101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.1 Sq.mts. ( 636 Sq.ft. )92
92 Booked100% Booked
100% Booked
2 BHK59.5 Sq.mts. ( 640 Sq.ft. )92
92 Booked100% Booked
100% Booked
184 total apartments / 184 apartments booked. 100% apartments booked.
Work Description in Building Daffodil Building No 11Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Elymus Building No 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Elymus Building No 12Oct 202025101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.1 Sq.mts. ( 636 Sq.ft. )92
92 Booked100% Booked
100% Booked
2 BHK59.5 Sq.mts. ( 640 Sq.ft. )92
92 Booked100% Booked
100% Booked
184 total apartments / 184 apartments booked. 100% apartments booked.
Work Description in Building Elymus Building No 12Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Fern Building No 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Fern Building No 13Oct 202025101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40 Sq.mts. ( 431 Sq.ft. )184
183 Booked99% Booked
99% Booked
184 total apartments / 183 apartments booked. 99% apartments booked.
Work Description in Building Fern Building No 13Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Garget Building No 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Garget Building No 14Oct 202025101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40 Sq.mts. ( 431 Sq.ft. )184
184 Booked100% Booked
100% Booked
184 total apartments / 184 apartments booked. 100% apartments booked.
Work Description in Building Garget Building No 14Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gloria Building No 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gloria Building No 15Oct 202025101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.1 Sq.mts. ( 636 Sq.ft. )92
92 Booked100% Booked
100% Booked
2 BHK59.5 Sq.mts. ( 640 Sq.ft. )92
92 Booked100% Booked
100% Booked
184 total apartments / 184 apartments booked. 100% apartments booked.
Work Description in Building Gloria Building No 15Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Lavender Building No 16

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Lavender Building No 16Dec 202026111101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.1 Sq.mts. ( 636 Sq.ft. )92
92 Booked100% Booked
100% Booked
2 BHK59.5 Sq.mts. ( 640 Sq.ft. )92
91 Booked98% Booked
98% Booked
184 total apartments / 183 apartments booked. 99% apartments booked.
Work Description in Building Lavender Building No 16Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Marigold Building No 17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Marigold Building No 17Dec 202026111101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.1 Sq.mts. ( 636 Sq.ft. )92
91 Booked98% Booked
98% Booked
2 BHK59.5 Sq.mts. ( 640 Sq.ft. )92
92 Booked100% Booked
100% Booked
184 total apartments / 183 apartments booked. 99% apartments booked.
Work Description in Building Marigold Building No 17Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Regency Nirman Ltd
for Project
Regency Anantam Phase I
last updated on 16 Jan 2025 as per information obtained from MARA RERA.