Project overview

Rohit Co-Op Housing Society Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045536. Rohit Co-Op Housing Society Ltd is located at 7Anzu7s8l00fxpcsdhbtex0ux1+Dyg7ces6xey5ztar3ygg5e8nklnnpwtsbpcfztnd1e81nyxt0htdnzibzcq==. This is a New being developed by Vedant Construction.

Rohit Co-Op Housing Society Ltd has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 1096 to 967 Sq.ft. Carpet. The Project has total 18 of which 12 are currently available for sale.

Rohit Co-Op Housing Society Ltd is being developed on a total land area of 5042 Sq.ft. Rohit Co-Op Housing Society Ltd has 1 Wings / Towers Rohit Co-Op Housing Society Ltd

ProjectDeveloperLocationPossession
Laxmi KeshavAditya AssociatesAiootvwknmwvawjsh1t2shcerashzzd+Vvufqo+X3kit/Aiukd18wmc9jsyez5xiebu0z08jgohaj8rjggoapq==31-12-2019 00:00:00
Abhijeet Co-Op Hsg SocietyContinental Maniratna Builders &Amp; Developers400602, Thane30-11-2020 00:00:00
The Vivek Flat Owners Chs LtdYash AshokaQcgpm0tc9+Spob1abuwfj/Dvv2no8abqk5ssofeqajietxbb38qrw9o3z0t5n0copvxwj4x8mwlmdwi33ksomg==25-12-2022 00:00:00
Madhuban Co-Operative Housing Society Ltd.Mahesh Shriram BorkarP9dsv03zmv7+Ngctrwoz9asvyvjsyjr54mvimhxnrdempcfx2vmvd7ciowje0gvh30-12-2020 00:00:00
Nalanda ChsYash InfraWlsevfoftbcfp4mp4rfoxpa0grnuysjzxloklfbontvtljt199lisz54+Dkzyqmz28-02-2021 00:00:00
Kamdhenu Prasad Chs Ltd.Mahesh Shriram BorkarEkuqxntuk+Iodeinsl6whq==31-01-2018 00:00:00
AdijonJ. Alvares & OthersBikyxu56jrgbw5v413ef/Y/2Hbyvbxefd7dadxqvkvg=30-03-2022 00:00:00
Shree Krishna ChsVaibhav DevelopersC8bjqxgwo1fvz2enmax3sq==31-12-2025 00:00:00
Satyabhama Chs LtdMahesh Shriram BorkarIu8rvrmanlg8uychzzcwaa==30-06-2024 00:00:00
Highland Sky Towers A BuildingProvidence Realty LlpYblpbmol6kqlnsctlzm+Hdi4iw+7Ad5tdj/Fvec3b68=31-12-2026 00:00:00
Shyam-KamalManvaibhav ConstructionsTxoxrrep5smjterikgpq6ugoqh8c4xm0qfawiu2s2ks=30-12-2021 00:00:00
Automatic Co-Operative Housing Society LtdJoshi Enterprises/1Mqh5jkxgmg/Coxmynfpw==30-06-2021 00:00:00
Vakratunda ChsArya EnterprisesZtdik/Yxaaagucrn66xolg==31-12-2025 00:00:00
Shree Pradyumna Co. Op. Hsg. Soc. Ltd.Joshi And Yash Realtors LlpDgnyeayhnh7tqe6l0ijd/7Ip8fzkgjaqvf91mvfrfrm=30-06-2025 00:00:00
BeliciaRajshila Construction LlpGpiiipbgp28qskvunvn2lcw9pfblsynxy1bkhlcwsmit3+Ns/Vep38ztx8nwd1zrzpq+Omldr8sdejmxnqvlrbpvtcjntel9cgwszvl8oeu=30-06-2028 00:00:00
New Kirtikar ProposedChaturthi Developers40060201-07-2025 00:00:00
Shanti KunjShreyas EnterprisesSbqnk/Pb/W5kkfo/Hyi2mw==31-12-2017 00:00:00
AtlantisAshwamedh Builders & DevelopersIvlvpwdqdft65dfycojz9pwn3x3gu2t648gbjpp4ve4=30-06-2021 00:00:00
Rohit Co-Op Housing Society LtdVedant Construction7Anzu7s8l00fxpcsdhbtex0ux1+Dyg7ces6xey5ztar3ygg5e8nklnnpwtsbpcfztnd1e81nyxt0htdnzibzcq==31-12-2024 00:00:00
Empire HeritageLakhani Builders Pvt LtdRgql8bvirw4hdmfanz1p6g==31-07-2027 00:00:00
Empire PresidencyLakhani Builders Pvt LtdTierpnapb2kdkzzz9p+Qhw==31-07-2025 00:00:00
SushanVenus RealtorsY37et+8Av92cc3ubutaoclgo4i+Kjb5srtgti0cgxq0=30-12-2022 00:00:00
Shree GaurangGaurang AssociatesThane30-12-2022 00:00:00
Laaman Industrial ParkLaaman DevelopersDp5plqpku8yvnaqhy3bz9g==31-12-2024 00:00:00
Highland Sky Tower Damani B BuildingProvidence Realty LlpYblpbmol6kqlnsctlzm+Hdi4iw+7Ad5tdj/Fvec3b68=30-04-2025 00:00:00
TarabaugVidyadhar Achyut VaishampayanGqzbkirrdddgf1lqt0dppzeqve3zhf+A+Otn5fg7tsm=20-12-2024 00:00:00
Empire TowersLakhani Realty LlpI8yttrkcrvg9e4frywvuqg==31-07-2024 00:00:00
Sandhya BuildingS D Bhalerao Constructions Pvt Ltd - SandhyaKi+3J2zwezzxzlyhwnxbxuk06xtxc3uiz2pr6m+Azsu=31-03-2019 00:00:00
Dreamland Co-Op. Hsg. Soc. Ltd.Vaastusukh DevelopersDypglcwmtse3zohct4pcxq2wy6olkcldfym6mct/Lfvnqecs5/Sctayxymh+4Jh130-12-2021 00:00:00
White RoseM/S Eeshan EnterprisesH6siidk71pvzzcy5zawzuw==30-03-2024 00:00:00
Sai DarshanShree Sai EnterprisesLaujnnsicry6xvcih5gmlq==30-12-2022 00:00:00
PadmalaxmiKedar Bhikaji BapatCpr9o8d9/Hbpynbt5xwsw/Xd7blhhh5txvx273z4mea=31-03-2018 00:00:00
Ashwa PlatinumAshwamedh Builders And Developers6Isxyewy7qqtx/Iotpveog==31-12-2019 00:00:00
Redevelopment Of Parijat Building Of Sanksriti Nagar Coop Hsg Soc LtdOjass ConstructionsGw8betc32dinsqp8nz6hmjgx0cvf3g9dlvizsjqw3df1qfnjl9vn1a4mbe/3Ltzqy90vns2zblzodntf4h7ub484t9mnjck1bllttibyix0=19-12-2021 00:00:00
Morya HeightsMorya Infraconstruct Private LimitedYw5twfhrbtaarhu3odrjxw==30-12-2024 00:00:00
Sahakar NiwasJnm EnterprisesA+Vkqhamy9hbjuuv+Fjg6z+Hxbx0wauydiaohr8h/4E=31-08-2018 00:00:00
Ghantali Sainath PlazaKalpataru EnterprisesRgq1njssk+Ult+4Blx8em9nonpkr3jjnqt52x1jzkc4=10-08-2022 00:00:00
Urban VillaYash Infra1Gr8xjq7ee03whct/Maoag==15-12-2022 00:00:00
Siddhashram Chs LtdStandard InfrastructureQztlml1zhln+Itinf8vngq==01-10-2018 00:00:00
Ramkrishna NiketanYash Govinda Build Infra Llp5Ahv0hyiihmj7bgu/W5rqa==30-12-2020 00:00:00
PERIWINKLE VILLA (DURGADHAM)SURESH SHALIK MHATRE20/8, 33/B, Tika No 1628-11-2022 00:00:00
Anand Bhavan Co op Hsg.Shri Swami Samarth Developers219 B30-12-2024 00:00:00
TRUSHNA CHS LTDMahesh Shriram BorkarOriginal Survey No 337, Final Plot No 36230-06-2024 00:00:00
Madan VilasIshaan Enterprise0Gqnj6vj0il6ngertdaabq==31-03-2018 00:00:00
Thana Co-Op Housing Society SopanAditya AssociatesDkv4atn2xql1npkg6n14gq/3Fqanugzoiki8ldiuvrdy52rqbvan1no+Wlhwcqwklu93coxoyxxzzw3q+N2hxba5svqecfgp3umxqfqmqbjx1airstzg8d9i03viuzcr31-12-2019 00:00:00
Seasons EliteSai Mahavir DevelopersB5hnphkv8xdmxtxrvn+Wdwyw52cfdaqyodggrbqjcj+Dnihpfy/Vp18rivgin0qgta8ukpvrgder/9Is2ghiig==31-08-2019 00:00:00
Om Shiv Samarth ChsShree Saibaba Constructions Private LimitedSuri/9Jjlasgbrwef66i1q==31-12-2019 00:00:00
AudumberAadyashakti Enterprises0I+Peyqrqrfgsezgdvjx6w==31-12-2018 00:00:00
CrossvillaShreeya EnterprisesPolte1kjesduidsgrmaxzg==30-06-2021 00:00:00
Shree SadanShrinivas Dattatray KaleL7bjbkmb11f90ax1u/Pfdw==31-01-2020 00:00:00
Rajesh Co-Operative Housing SocietyJoshi EnterprisesThane, 40060208-08-2019 00:00:00
Ashwa AnnexAshwamedh ConstructionQwdraiczn3tbiow7+Fjq7w==31-05-2018 00:00:00
Anmol SapphireM/S Ekdant HousingK+Viu63fpckmv1sq2gdrmg==01-08-2019 00:00:00
Oasis RoyaleMagestic Premises Private LimitedHo8ra21x+Ugiki4bqopmtwv7uzbtotynz4u3e/Gmgk4=31-12-2018 00:00:00
Eashan Dattaprasad Co Op Hsg Society LtdSripad Vallabh VenturesNfcrzioaxtuxpgb3w5murwk3ekwtfq1frh+6Hat2iqe=30-03-2023 00:00:00
Sai Lavkik HeightsSailavkik Realty Private Limited8Widqbxevlcsqgicezhc+Rp9ly7qefq6e/6Bnaf3abo=30-12-2021 00:00:00
Redevelopment Of The Bombay Thana ChsGaurang Properties Pvt. Ltd.Shivaji Nagar, 40060231-12-2019 00:00:00
MaithiliSharda Vastu Nirmitee Pvt. Ltd.Rqq/Cxqzvuwl9uket15kfg6cyvfqhkb7bpfhvcvrjfgm5uoalv5quskanqgvi4xu31-03-2019 00:00:00
Heera KrushnaA And J Constructions=00S7kkp4qtioscstaa8ptluw==31-01-2028 00:00:00
Thane Shivam Chs LtdMahesh Shriram BorkarD2evvcnwulayyxqtbiiwkdis6gwi3hdj7a5c8mchfi5lzynwscrszvpif9ewz6ayskiu+Ckulds20bzj1m+Przxl2vndi32lq7svsvwoczj1iuf/Eft/Fq09tx4yfu0i4gqzrxi4wogc4sbhw79e3w==31-12-2026 00:00:00
Manohar MahalSharda Vastu Nirmitee Pvt. Ltd.O7dyaplfbdu5xpfr0xynaxvbj/Onqxfeuhepu5a98yl6geky8wsiainrwxujmuy331-12-2025 00:00:00
Mai Kripa Co. Op. Hsg. Soc.Ojass ConstructionsVmbnvnk1ewxivhbrdlaam2cmvxdvzix4b/Lajp6dwmm=31-03-2024 00:00:00
Hira Chambers ChsVaibhav Shashikant Kadam0G6fspwofwaa0len/Zbezgfxzdtx1mb1cbry4hjx3me=31-10-2025 00:00:00
Crystal CornerAdishwar Enterprises3Hz3x9lt5mzp5h/2G7d0jxuygudmefix9uw4t7uzkw8=31-12-2024 00:00:00
Shree DattaAadyashakti EnterprisesNvjkd1fkptxs074pomwcaufsuampoebv0zb0/Uatrx0=30-12-2022 00:00:00
Priyadarshani Chs LimitedAniruddha Group Shilpali ProjectSsfsysf+67Yb1q5dmsap7q==30-12-2021 00:00:00
Mahashweta - Ojass ConstructionsOjass ConstructionsGskkaggouubtk74wod/Vymldubqknu8i4ffdrqq+9Bq=31-10-2019 00:00:00
Pushpak HeightsJ K AssociatesNmjs4pe1r00fpjnjdg31bg==31-12-2024 00:00:00
Pradeep Co-Operative Housing Society Ltd.Squarefeet Real EstateF8o+Orelf8nr9uwd+Bkhuwrhtavwcdumc6uk3v5lihbh6buvb08viexghtaoei9l30-09-2027 00:00:00
Chaitraban SkylineM/S Skyline InfraOoketjlipkckftfqeubv3juv0jwlqumbrz5yrntcowa=30-06-2026 00:00:00
ShivkrupaAnant Arjun Madhavi+Ergnd+8Qudhbi4x9efycq==31-03-2018 00:00:00
Snehadeep Co-Operative Housing Society LtdJoshi EnterprisesAcg42dpcsqlw58y5+Rgebg80zk8fcygge/Pydvq0wc/D9iwwseo9zwz3upyvwrmr7cxpe4q5ntn1kajoxgouc6fjce3zlxjle8yo8r0oqqe=31-12-2017 00:00:00
ManeeshaPadmanabh Developers0Rmis2xl+Truypbxulkhhlzrpsr5gt+Uekeczz1w2vvcfumfbzpmiagm4lyyr6jb30-05-2022 00:00:00
Pratik SahaniwasM/S Ekdant HousingGdx3gsbplksz0l3xg6hyiaxvtxrxlwjia+E6dhutznp9v8pwduqlshn3ysv8afzk28-11-2022 00:00:00
Geeta PlazaRoyal DevelopersVzlugvh2ufmwygvprczem+Kvzhfmajtovy924juspli=30-06-2026 00:00:00
Highland Sky ArcadeProvidence Realty LlpRwp8zc5pu6nnrlndmhqo2gdqivcm7v6lptfermcewpu=31-08-2024 00:00:00
Rahul Co.Op. Housing Society LtdSna Build-Tech4Ssjcyxj1gw4hhg3gkopkq==15-02-2025 00:00:00
Dev AshokaDev Land & Housing Pvt Ltd+Fwetpmxybfl1ldugkmff+Xy8tmaqn55y8mdvrwtgqc=31-05-2019 00:00:00
StarlivingTheme Developers Private Limited39Lh8hhxdeaqr5niqkeqs5mgczyiq01bcn8jq4ltozsr0axripg8udwpq43kw4qj89y6xfzlykeasjnhpeqjag==30-12-2025 00:00:00
Valencia ParkPrakash Trading CompanyA+Tmlm3vjowz5zqiin15ng==31-12-2019 00:00:00
Suyog Society ChsDream RealtorsAm6h4sj6alktwol87dc1tq==31-12-2019 00:00:00
Tropical EliteSchema Enterprises Private LimitedGycphfiaugcg3vuzo0u1piafaxr3w1xogcqfv0lcpbw=31-05-2018 00:00:00
Rameshwar Co-Op Housing Society Ltd.Aditya AssociatesMek/Ekyfrcycxboqx0c0uctqomhzyaq70k/Lwvk9lw0hemueqddnxcgrnwbfx7oh10-03-2027 00:00:00
Blue BerryAshwamedh CorporationUfzgcgzpcc5hyksnacuxg4jlvwu7a5oyqtgcoqbm0dnorhzpessm5ogk1cc269ba30-06-2026 00:00:00
Veer VishwaVeer Life Spaces LlpPzam9sosrnlebhnvpkyu3xmereefhbz7fnqnkruzgeq=20-02-2027 00:00:00
Sapphire HeightsSpace CorporationC156ucvzk76+Vxcjdx26ug==25-12-2024 00:00:00
MaansarovarMeridian Buildpro Private LimitedA6pdrbe1xfnfgaslkobibhjoul7y41/Ixjho13/Elsw=30-12-2022 00:00:00
GiriviharAbhinandan EnterpriseNjmntqdegqntrp+Ptq1nmg==31-05-2019 00:00:00
Auralis The TwinsDeep Homes & Constructions Llp+Dxf2i8gozq4k5wncymckq==01-03-2019 00:00:00
Nandishwar PlazaNandishwar Cons CoB3yie2onrb67neq9sbwycivhpvl0kiqaehtbxvpsxgi=10-08-2023 00:00:00
Ashtavinayak ResidencyAshvattha Realty LlpRoi5uff/Cab+Zxepxrah1lwj3mp67lrcjpy7q7u5f6e=31-12-2025 00:00:00
Rbi Employees Awantika Co Op Hsg Soc LtdGovind Ojass Edifice Pvt. Ltd.Jnvsfc722+Jqszczwvhowlseonvired8i8aenfvxgbsca2n3iw0iwcjfszchx1izoekobrlksvjhoxzdq/Rzjdjfdzxcwkpe0aivcfbbhbw=31-12-2024 00:00:00
Orchid Square Phase 2M/S Squarefeet Eco Housing Llp+O6zo+Fd/See9dqzbypfcq==31-12-2018 00:00:00
SindhusmrutiYogiraj Powertech Pvt Ltd0Vws4tyz14hgmqmk6fxmcrzfgdbnxzc0swl3m49seqe=30-11-2018 00:00:00
NEW THANA CHSGAURANG PROPERTIES PVT. LTD.Eastern Express Highway, 40060223-09-2018 00:00:00
Raghuanand ChsVijay Sawant400602, Thane30-06-2018 00:00:00
Suraj Rama HeightsShree Rama Shree Construction Pvt LtdAwqux7y31u/Ggpc6lqr0ts3xr1tqq/Ebdcvpuwjh7q0=30-06-2021 00:00:00
Mauli Krupa ApartmentJayvijay Builders And Developers9Hqpg1wxrmvkqjgraszvrw==30-09-2018 00:00:00
Gautam Co-Operative Housing SocietyMahesh Shriram BorkarEc8voyi4zudwxtmxfqdyta1glwigygq3hwicv+4Cjxu=31-07-2018 00:00:00
Dhanashree Co-Operative Housing SocietyL. K. Realtors400602, Thane31-12-2019 00:00:00
Laabh NeelkanthLaabh BuildtechY0dzrlmno95ql7nigttqww==31-12-2019 00:00:00
Godrej Alive AModella Textile Industries Limited40060231-12-2020 00:00:00
Naiks Central PlazaClean Construction Co.Opp Gaondevi Ground31-12-2018 00:00:00
Veer HeightsVEER LIFE SPACES LLPFinal Plot No 101 Part T.P. Scheme 130-04-2028 00:00:00
TRIVIDHCosmos SKyline Green View LLP60/A28-02-2029 00:00:00
DEBONAIR CLASSICANANT SQUARE DEVELOPERST.P.S.No. 1, Final Plot No. 365/B30-04-2029 00:00:00
Hks Silver PalaceHk RealtorsC3uxpdjf7zhqyqwj4ovkrb+Sehevxkjsarw2m/Fkzdk=31-12-2027 00:00:00
Veer EnclaveVeer Life Spaces LlpUv5aac0pjgkbmzfbozdnnlhmqv+Lok5aytbxlk6puzae/7Ozoqq9n/Ez5ztkmxcds2li6sis5+Thfhb5aya5jocuylz/Z3mbeoaolqbovty=14-06-2028 00:00:00
AshirwadGautam Shanti EnterprisesTpuy5f12vg8y/Tl4kaj42i0icl9ekmmfxe9u7jyz9hs=31-07-2027 00:00:00
Arvind Co-Op Housing Society LtdAditya AssociatesCiad3ktzxrgo72mxr9id9cfi0alksnc4q9uhv1wplq+Hijrrt9t5kmzgjdcwdeybipgb4qk0j7clhy5jggnbyg==08-06-2027 00:00:00
Suasha Co.Operative Housing Society LimitedAnantnath Enterprises2Zwkihiqjb708+Ssbanuwcvkwouv9vakiagvc3zzmmtsreeehs8qusjudzf8vgvs3nu76tpkrpmfdytwgp45nw==31-12-2027 00:00:00
Bakul Co-Operative Housing Society LimitedAdhiraaj DevelopersKtcs+0E9lxds6rv97puu2crwga5qi2416/Sv2cfz7kns5xcmydqbsgvlr1/Sp3lf09-07-2027 00:00:00
Narsinha Co-Op. Hsg. Soc. Ltd.Real Homes DevelopersDzls1npuzaclcipmvrrcl8txdbh3aaxteh5qa6qxgj5klo/Srkhfctep6ksimq4y31-12-2027 00:00:00
Veer YashodeepYash InfraUk5a87nb8euvfl23smkbxayssst7xqhcu0ivtjfqrcctunygtt+2Egfut6/Tgia216-01-2028 00:00:00
WindsorBorkar RealtyPuw8xha8imh/Vtphm7a19+Gbvd5yr8qjr1knbzgbu01aad4dj2sx4hsfkhgtslbuxcwqxzqqn7hmbpn9cu16va==31-12-2028 00:00:00
Surshree Co Op Hsg Soc LtdVaibhav Shashikant KadamYz+7Qcctegzv3qjaq/Joem1yu+Dk1kpzjgb5tf5gd4e=31-12-2027 00:00:00
Adityaraj SahyadriAdityaraj Builders And DevelopersDjm1juyoaumtaxi09du+V8wtrz5swz7hhwhj1gu9+Eo=31-01-2029 00:00:00
Matru MandirParnad Anil GuptePltlo9oatryvqxtqe3+G/1Odcweatx3ebnw3ko1vs+E=31-12-2026 00:00:00
Alhad Co-Op. Hsg. Soc. LtdAnantnath DevelopersJlbtotuettuxhfwkaplvsa==31-12-2025 00:00:00
Solanki Co-op. Hsg. Soc. Ltd.REAL HOMES DEVELOPERSFinal Plot No. 112 (Part)31-03-2027 00:00:00
Dream PragatiEmpire Horizons Private Limited31-12-2028 00:00:00
Nishigandha Co-Operative Housing Society LtdPadmanabh Developers31-03-2028 00:00:00
Lumos CrestReva Realty Developers Llp31-12-2031 00:00:00
Lumos 1Reva Realty Developers Llp31-12-2031 00:00:00
Deepjyoti Co. Op. Housing SocietyAditya Associates31-01-2028 00:00:00
Maher Premises Co Op Hsg Soc LtdShrusti Casa28-08-2028 00:00:00
Shree KrupaMagnum Builders31-12-2027 00:00:00
Anupam Chs. Ltd.Shree Mangalmurti Enterprises25-12-2029 00:00:00
Samrin HeritageSamrin Infra Private LimitedIw3ki2u8kgrx3p0pk1suuw==30-12-2023 00:00:00
ParadiseShree Yash DevelopersQe1qpfgva0w+P2z3iyepva==30-03-2022 00:00:00
Kalika HeightsSanjay PandeyPanchpakhadi01-01-2011 00:00:00
Devyani CHSShree Swami Sanket Enterprises31-05-2028 00:00:00
KISHIN MAHAL CO OPERATIVE SOCIETYKISHIN MAHAL CO OP HSG SOCIETY LIMITED31-12-2028 00:00:00
Poonam Chhaya ChslVastu Vaibhav Creations Llp31-12-2026 00:00:00
Ekdanta EnclaveEkdanta Developers Private Limited31-12-2029 00:00:00
MohandeepMagestic Premises Private Limited15-06-2027 00:00:00
Sapphire SquareVedant Construction31-05-2027 00:00:00
Metro ImperialPragati Combines31-12-2028 00:00:00
Gaurang RoyaleGaurang Properties Pvt. Ltd.Gokhale Road31-12-2019 00:00:00
Krishna DhamKarma ConstructionThane, 40110531-07-2018 00:00:00
Pankaj Co-Op Housing Society Ltd.Aditya AssociatesKtfidi4kkko6mtpir1pi+Bm1x+8X5aii4tx8nyuk4/G=10-09-2023 00:00:00
Madhu Milind Co-Op Housing Society LtdAditya AssociatesIpcdtsqdh/Lkvmpbdvumankwuuctn/Amsa2rzpei3jw=10-03-2025 00:00:00
MAYUR CHS LTDMahesh Shriram BorkarCts No 20/1 Tikka No 1630-12-2023 00:00:00
RhythmAradhana Lifespace LLPCts 247/230-06-2026 00:00:00
One ArthasyaTop Floor Realty Llp31-12-2030 00:00:00
Yashaswi Chs Ltd.Sarth Shilp Pvt. Ltd.1Qbnpofnfokkhbr3dt5xuv5xypqj3nkaj0updwume9g=30-09-2022 00:00:00
Empire DynastyLakhani Builders Pvt Ltd6Pmygb5i9gmkldffoqsavw==31-12-2030 00:00:00
CELEBRATIONSHINDUSTAN CONSTRUCTION CORPORATIONPlot No.2331-12-2017 00:00:00
Ekatva CrescentJ V Buildpro Llp31-12-2028 00:00:00
Nav OmkarAvighna Redevelopers Nav Omkar31-12-2028 00:00:00
Shram Safal Co-Operative Housing Society LtdAdeshwar Developers31-05-2029 00:00:00
PRAKASH VILLA CHS LTD.SHARDAVENUE REALTYSPACES LLP31-05-2028 00:00:00
Project Details
  • Project:
    Rohit Co-Op Housing Society Ltd
  • Location:
  • 7Anzu7s8l00fxpcsdhbtex0ux1+Dyg7ces6xey5ztar3ygg5e8nklnnpwtsbpcfztnd1e81nyxt0htdnzibzcq==
  • Const. Stage:
    New
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Vedant Construction
  • Phone:
  • Address:
  • Sumeet Enclave
Project RERA Details
MAHA REARA No: P51700045536
Project Type Residential / Group Housing
RERA Project Status New
Architect Joshi Deshaware And Associate
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 May 2022
Last Retrived 13 Feb 2026
Rohit Co-Op Housing Society Ltd QR Code
Rohit Co-Op Housing Society Ltd
MahaRERA - P51700045536
Apartment Details & Configuration
TypeArea
1 BHK45.78 Sq.mts. ( 493 Sq.ft. )
1 BHK55.07 Sq.mts. ( 593 Sq.ft. )
2 BHK66.86 Sq.mts. ( 720 Sq.ft. )
3 BHK89.85 Sq.mts. ( 967 Sq.ft. )
3 BHK101.8 Sq.mts. ( 1096 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rohit Co-Op Housing Society Ltdlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Commence
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo
Landscaping & Tree Planting
Tree Plantation
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Yet To Commence
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Commence
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Commence
Water Supply
Yet To Commence
Buildings / Wings in Rohit Co-Op Housing Society Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rohit Co-Op Housing Society Ltd by Vedant Constructionlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

5042 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
6
Available
12

Saleable Area Statistics (Sq. ft.)

14484 Total
Total
14484
Booked
5308
Available
9176
Total 18 apartments in project. 6 apartments booked. 33% apartments booked.
Total 14484 Sq.ft. saleable area. 5308 saleable area booked.
37% area booked.

Rohit Co-Op Housing Society Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rohit Co-Op Housing Society LtdDec 20249101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.78 Sq.mts. ( 493 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK55.07 Sq.mts. ( 593 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK66.86 Sq.mts. ( 720 Sq.ft. )6
2 Booked33% Booked
33% Booked
3 BHK89.85 Sq.mts. ( 967 Sq.ft. )6
4 Booked66% Booked
66% Booked
3 BHK101.8 Sq.mts. ( 1096 Sq.ft. )2
None Booked0% Booked
0% Booked
18 total apartments / 6 apartments booked. 33% apartments booked.
Work Description in Building Rohit Co-Op Housing Society LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vedant Construction
for Project
Rohit Co-Op Housing Society Ltd
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation