Project overview

Royal Oasis Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002382. Royal Oasis Phase 1 is located at Jankalyan Nagar, Malad West, Malad West. This is a On-Going Project being developed by Rikki Ronie Developers.

Royal Oasis Phase 1 has 1 BHK TYPE 1, 1 BHK TYPE 2, 1 BHK TYPE 3, 2 BHK TYPE 1, 2 BHK TYPE 2, 2 BHK TYPE 3 & 2 BHK TYPE 4 Apartments with carpet areas ranging from 457 to 669 Sq.ft. Carpet. The Project has total 328 of which 114 are currently available for sale.

Royal Oasis Phase 1 is being developed on a total land area of 59202 Sq.ft. out of which 8889 Sq.ft. i.e 15% is reserved for recreational purposes. Royal Oasis Phase 1 has 1 Wings / Towers Royal Oasis Abcd Wing

ProjectDeveloperLocationPossession
Shivraj HeightsKailash YadavDr Baba Saheb Ambedkar Road, Bhabrekar Nagar, Bhabrekar Nagar30-12-2023 00:00:00
Kailash EnclaveShrreeya DeveloperssJagdish Shetty Marg, Kandivali West, Kandivali West30-06-2024 00:00:00
Redevelopment Of Sparsh ChslPranav Constructions Limited16 Jankalyan Nagar Kharodi Malad West, Mumbai, Mumbai31-03-2025 00:00:00
Marina Enclave Wings Op Phase IiiGurukrupa Developers D.N.Nagar Project90 Ft Road, Jankalyan Nagar Malad West Mumbai, Jankalyan Nagar Malad West Mumbai30-06-2023 00:00:00
Marina Enclave Wings Q And R With Kindergarten Phase - IvGurukrupa Developers D N Nagr Project90 Ft Road, Malvani Malad West, Malvani Malad West31-12-2025 00:00:00
Redevelopment Of New Shalimar Apartments ChslPranav Constructions LimitedBuilding No 4 Jankalyan Nagar Kharodi Malad West, Mumbai, Mumbai30-09-2025 00:00:00
Raj ShivgangaRaj Arcades &Amp; Enclaves Private LimitedMumbai Suburban, 40006431-12-2014 00:00:00
Bay VueH And Y Realities Privae LimitedKharodi, Malvani, Malvani30-06-2021 00:00:00
Gajanan PlazaBalaji Construction Co.120 Ft Link Road, 90Ft Poisur Charkop Rd, Mahavir Nagar, Mahavir Nagar, 120 Ft Link Road31-03-2017 00:00:00
Project Details
  • Project:
    Royal Oasis Phase 1
  • Location:
  • Jankalyan Nagar, Malad West, Malad West
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2016
Developer Details

  • Developer:
    Rikki Ronie Developers
  • Phone:
  • Address:
  • 6Th Floor, Shah Trade Centre, Rani Sati Marg, Near Western Express Highway, Malad East, 400097
Project RERA Details
MAHA REARA No: P51800002382
Project Type Residential
RERA Project Status On-Going Project
Architect Barai Architect
Funding Bank HDFC Bank
Proposed Possession 31 Dec 2016
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 18 Feb 2020
Last Retrived 16 Jan 2025
Royal Oasis Phase 1 QR Code
Royal Oasis Phase 1
MahaRERA - P51800002382
Apartment Details & Configuration
TypeArea
1 BHK TYPE 142.5 Sq.mts. ( 457 Sq.ft. )
1 BHK TYPE 244.22 Sq.mts. ( 476 Sq.ft. )
1 BHK TYPE 344.64 Sq.mts. ( 481 Sq.ft. )
2 BHK TYPE 155.19 Sq.mts. ( 594 Sq.ft. )
2 BHK TYPE 255.65 Sq.mts. ( 599 Sq.ft. )
2 BHK TYPE 362.09 Sq.mts. ( 668 Sq.ft. )
2 BHK TYPE 462.18 Sq.mts. ( 669 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Royal Oasis Phase 1last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Before Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Complied At Site
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Complied At Site
Landscaping & Tree Planting
Before Oc
Open Parking
Before Oc
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Complied At Site
Solid Waste Management And Disposal
Before Oc
Storm Water Drains100% completed
95% Complete
Complied At Site
Street Lighting100% completed
95% Complete
To Be Installed By Mcgm
Treatment And Disposal Of Sewage And Sullage Water90% completed
90% Complete
Installation Under Progress
Water Conservation, Rain water Harvesting100% completed
95% Complete
Complied At Site
Water Supply
Before Oc
Buildings / Wings in Royal Oasis Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Royal Oasis Phase 1 by Rikki Ronie Developerslast updated on 16 Jan 2025 as per information obtained from MARA RERA.

59202 Sq. ft.

Project Area

8889 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

328 apartments in total
Total
328
Booked
214
Available
114

Saleable Area Statistics (Sq. ft.)

179941 Total
Total
179941
Booked
120974
Available
58967
Total 328 apartments in project. 214 apartments booked. 65% apartments booked.
Total 179941 Sq.ft. saleable area. 120974 saleable area booked.
67% area booked.

Royal Oasis Abcd Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Royal Oasis Abcd WingDec 2018231011100204
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 142.5 Sq.mts. ( 457 Sq.ft. )84
51 Booked60% Booked
60% Booked
1 BHK TYPE 244.22 Sq.mts. ( 476 Sq.ft. )42
15 Booked35% Booked
35% Booked
1 BHK TYPE 344.64 Sq.mts. ( 481 Sq.ft. )42
18 Booked42% Booked
42% Booked
2 BHK TYPE 155.19 Sq.mts. ( 594 Sq.ft. )21
16 Booked76% Booked
76% Booked
2 BHK TYPE 255.65 Sq.mts. ( 599 Sq.ft. )59
56 Booked94% Booked
94% Booked
2 BHK TYPE 362.09 Sq.mts. ( 668 Sq.ft. )21
16 Booked76% Booked
76% Booked
2 BHK TYPE 462.18 Sq.mts. ( 669 Sq.ft. )59
42 Booked71% Booked
71% Booked
328 total apartments / 214 apartments booked. 65% apartments booked.
Work Description in Building Royal Oasis Abcd WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress94% done
94% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress90% done
90% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Rikki Ronie Developers
for Project
Royal Oasis Phase 1
last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation