Project overview

Ruparel Livia is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800026450. Ruparel Livia is located at S.G. Barve Marge, Nehru Nagar, Nehru Nagar. This is a New Project being developed by Shree Siddhivinayak Classic Construction Private Limited.

Ruparel Livia has 1 BHK & Shop Apartments with carpet areas ranging from 272 to 368 Sq.ft. Carpet. The Project has total 98 of which 37 are currently available for sale.

Ruparel Livia is being developed on a total land area of 13158 Sq.ft. Ruparel Livia has 1 Wings / Towers Ruparel Livia

ProjectDeveloperLocationPossession
Ratnadeep Chs LtdS D Bhalerao Constructions Pvt Ltd Bldg No 60 JvSambar Galli, Nehru Nagar, Nehru Nagar31-05-2019 00:00:00
Skyline Sparkle Wing C Skyline GreathillsMumbai Suburban, 40007831-12-2018 00:00:00
Project Details
  • Project:
    Ruparel Livia
  • Location:
  • S.G. Barve Marge, Nehru Nagar, Nehru Nagar
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Shree Siddhivinayak Classic Construction Private Limited
  • Phone:
  • Address:
  • Plot No 273, Ruparel Iris, Sb Marg, Near Big Bazar, Matunga Road West, 400016
Project RERA Details
MAHA REARA No: P51800026450
Project Type Residential
RERA Project Status New Project
Architect Mr Rahul Kamathi
Funding Bank Kotak Mahindra Bank
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Oct 2023
Last Retrived 14 Jan 2025
Ruparel Livia QR Code
Ruparel Livia
MahaRERA - P51800026450
Apartment Details & Configuration
TypeArea
1 BHK34.2 Sq.mts. ( 368 Sq.ft. )
Shop25.28 Sq.mts. ( 272 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ruparel Livialast updated on 14 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Prior To Oc
Energy management
Prior To Oc
Fire Protection And Fire Safety Requirements
Prior To Oc
Landscaping & Tree Planting
Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Prior To Oc
Solid Waste Management And Disposal
Prior To Oc
Storm Water Drains
Prior To Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Prior To Oc
Water Conservation, Rain water Harvesting
Prior To Oc
Water Supply
Prior To Oc
Buildings / Wings in Ruparel Livia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ruparel Livia by Shree Siddhivinayak Classic Construction Private Limitedlast updated on 14 Jan 2025 as per information obtained from MARA RERA.

13158 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

98 apartments in total
Total
98
Booked
61
Available
37

Saleable Area Statistics (Sq. ft.)

35981 Total
Total
35981
Booked
22360
Available
13621
Total 98 apartments in project. 61 apartments booked. 62% apartments booked.
Total 35981 Sq.ft. saleable area. 22360 saleable area booked.
62% area booked.

Ruparel Livia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel LiviaDec 202319100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.2 Sq.mts. ( 368 Sq.ft. )97
60 Booked61% Booked
61% Booked
Shop25.28 Sq.mts. ( 272 Sq.ft. )1
1 Booked100% Booked
100% Booked
98 total apartments / 61 apartments booked. 62% apartments booked.
Work Description in Building Ruparel LiviaCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress43% done
43% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Siddhivinayak Classic Construction Private Limited
for Project
Ruparel Livia
last updated on 14 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation