Project overview

Rustomjee Virar Avenue L1-L2 And L4 Wing C And D is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000018694. Rustomjee Virar Avenue L1-L2 And L4 Wing C And D is located at Chikhaldongari Road, Avenue L1-L2, Avenue L1-L2. This is a New Project being developed by Keystone Infrastructure Private Limited.

Rustomjee Virar Avenue L1-L2 And L4 Wing C And D has 1 BHK TYPE 1, 2 BHK TYPE 1 & 2 BHK TYPE 2 Apartments with carpet areas ranging from 331 to 512 Sq.ft. Carpet. The Project has total 234 of which 47 are currently available for sale.

Rustomjee Virar Avenue L1-L2 And L4 Wing C And D is being developed on a total land area of 11837 Sq.ft. Rustomjee Virar Avenue L1-L2 And L4 Wing C And D has 2 Wings / Towers Wing C,Wing D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rustomjee Virar Avenue L1-L2 And L4 Wing C And D
  • Location:
  • Chikhaldongari Road, Avenue L1-L2, Avenue L1-L2
  • Const. Stage:
    New Project
  • Possession:
    31 Jul 2022
Developer Details

  • Developer:
    Keystone Infrastructure Private Limited
  • Phone:
  • Address:
  • 702, Natraj, M V Road Junction, Western Express Highway, Andheri Names, 400069
Project RERA Details
MAHA REARA No: P99000018694
Project Type Residential
RERA Project Status New Project
Architect M/S. Abhikalpan Architects &Amp; Planners
Funding Bank ICICI BANK
Proposed Possession 31 Jul 2022
Revised Possession
Extended Possession
Litigations Yes
Last Modified 30 Sep 2023
Last Retrived 13 Jan 2025
Rustomjee Virar Avenue L1-L2 And L4 Wing C And D QR Code
Rustomjee Virar Avenue L1-L2 And L4 Wing C And D
MahaRERA - P99000018694
Apartment Details & Configuration
TypeArea
1 BHK TYPE 130.74 Sq.mts. ( 331 Sq.ft. )
2 BHK TYPE 143.87 Sq.mts. ( 472 Sq.ft. )
2 BHK TYPE 247.54 Sq.mts. ( 512 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rustomjee Virar Avenue L1-L2 And L4 Wing C And Dlast updated on 13 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
box cricket on podium top
As Part Of L1- L2 Avenue Project
common area fire sprinklers
Yes Part Of L1-L2 Project As Per Cfo Requirement
common area lighting
As Part Of L1- L2 Avenue Project
Community Buildings
Na
Designer Entrance Lobby
Yes Except For Commercial Building
DG Back up for Elevators and Common area Lighting
Yes Except For Commercial Building
Earthquake resistant structure
Yes Part Of L1-L2 Project As Per Cfo Requirement
Electrical Meter Room, Sub-Station, Receiving Station
Yes As Proposed Except Receiving Station
Elevators
As Part Of L1- L2 Avenue Project
Energy management
As Per Appvoed Plans
Fire Protection And Fire Safety Requirements
Yes As Proposed
futsal court on podium top
As Part Of L1- L2 Avenue Project
Landscaping & Tree Planting
Na
multipurpose lawn on podium top
Yes As Part Of L1-L2 Project
Open Parking
For Residential Buildings
organic waster converter for recycle of wet garbage
Yes As Part Of L1-L2 Project
podium parking
As Proposed
podium top landscaping and Trees planting
As Part Of L1- L2 Avenue Project
Sewerage (Chamber, Lines, Septic Tank , STP)
Yes As Proposed
Solar System
Yes As Per Environmental Clearance
Solid Waste Management And Disposal
Bins Are Proposed
Staircase and lift lobbies
As Part Of L1- L2 Avenue Project
Storm Water Drains
As Per Appvoed Plans
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
walking cum jogging track on podium top
Yes As Part Of L1-L2 Project
Water Conservation, Rain water Harvesting
Yes As Proposed
Water Supply
Provisiona Will Be Made
Buildings / Wings in Rustomjee Virar Avenue L1-L2 And L4 Wing C And D
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rustomjee Virar Avenue L1-L2 And L4 Wing C And D by Keystone Infrastructure Private Limitedlast updated on 13 Jan 2025 as per information obtained from MARA RERA.

11837 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

234 apartments in total
Total
234
Booked
187
Available
47

Saleable Area Statistics (Sq. ft.)

96192 Total
Total
96192
Booked
76955
Available
19237
Total 234 apartments in project. 187 apartments booked. 79% apartments booked.
Total 96192 Sq.ft. saleable area. 76955 saleable area booked.
80% area booked.

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJul 2022151012341
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 130.74 Sq.mts. ( 331 Sq.ft. )59
48 Booked81% Booked
81% Booked
2 BHK TYPE 143.87 Sq.mts. ( 472 Sq.ft. )28
22 Booked78% Booked
78% Booked
2 BHK TYPE 247.54 Sq.mts. ( 512 Sq.ft. )30
25 Booked83% Booked
83% Booked
117 total apartments / 95 apartments booked. 81% apartments booked.
Work Description in Building Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress52% done
52% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress87% done
87% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress79% done
79% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJul 2022151012440
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 130.74 Sq.mts. ( 331 Sq.ft. )59
46 Booked77% Booked
77% Booked
2 BHK TYPE 143.87 Sq.mts. ( 472 Sq.ft. )28
22 Booked78% Booked
78% Booked
2 BHK TYPE 247.54 Sq.mts. ( 512 Sq.ft. )30
24 Booked80% Booked
80% Booked
117 total apartments / 92 apartments booked. 78% apartments booked.
Work Description in Building Wing DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress52% done
52% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress77% done
77% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress79% done
79% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Keystone Infrastructure Private Limited
for Project
Rustomjee Virar Avenue L1-L2 And L4 Wing C And D
last updated on 13 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation