Project overview
Sai River Palace is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000009277. Sai River Palace is located at Palghar, 401501. This is a On-Going Project being developed by Sai Universal Realtors &Amp; Developers Llp.
Sai River Palace has 1 BHK Apartments with carpet areas ranging from 295 to 326 Sq.ft. Carpet. The Project has total 121 of which 80 are currently available for sale.
Sai River Palace is being developed on a total land area of 144258 Sq.ft. out of which 15127 Sq.ft. i.e 10% is reserved for recreational purposes. Sai River Palace has 7 Wings / Towers Building No 1,Building No 2,Building No 3,Building No 4,Building No 6,Building No 7E,Building No 7F
Project | Developer | Location | Possession |
-
Project:
Sai River Palace
-
Location:
-
Palghar, 401501
-
Const. Stage:
On-Going Project
-
Possession:
20 Dec 2018
-
Developer:
Sai Universal Realtors &Amp; Developers Llp
-
Phone:
-
Address:
-
130 Unit, Blue Rose Industrial Estate, Above Maruti Showroom, Next To Metro Mall, Borivali East, 400066
MAHA REARA No: |
P99000009277 |
Project Type |
Residential |
RERA Project Status |
On-Going Project |
Architect |
Mr Nishant Patil |
Funding Bank |
Vijaya Bank |
Proposed Possession |
20 Dec 2018 |
Revised Possession |
20 Dec 2021 |
Extended Possession |
20 Dec 2022 |
Litigations |
No Litigations |
Last Modified |
13 Apr 2022 |
Last Retrived |
13 Jan 2025 |
Sai River Palace QR Code
Sai River Palace
MahaRERA - P99000009277
Type | Area |
Row House | 77.52 Sq.mts. ( 834 Sq.ft. ) |
1 BHK | 22.4 Sq.mts. ( 241 Sq.ft. ) |
1 BHK | 22.53 Sq.mts. ( 243 Sq.ft. ) |
StudioFlat1 | 21.45 Sq.mts. ( 231 Sq.ft. ) |
StudioFlat2 | 32.5 Sq.mts. ( 350 Sq.ft. ) |
StudioFlat3 | 35.2 Sq.mts. ( 379 Sq.ft. ) |
StudioFlat4 | 29.28 Sq.mts. ( 315 Sq.ft. ) |
StudioFlat5 | 32.65 Sq.mts. ( 351 Sq.ft. ) |
StudioFlat6 | 33.11 Sq.mts. ( 356 Sq.ft. ) |
Studio | 22.71 Sq.mts. ( 244 Sq.ft. ) |
Studio | 24.29 Sq.mts. ( 261 Sq.ft. ) |
1 BHK | 32.66 Sq.mts. ( 352 Sq.ft. ) |
2 BHK | 40.56 Sq.mts. ( 437 Sq.ft. ) |
2 BHK | 41.97 Sq.mts. ( 452 Sq.ft. ) |
Shop | 2.94 Sq.mts. ( 32 Sq.ft. ) |
Shop | 5.62 Sq.mts. ( 60 Sq.ft. ) |
1 BHK | 27.45 Sq.mts. ( 295 Sq.ft. ) |
1 BHK | 28.36 Sq.mts. ( 305 Sq.ft. ) |
1 BHK | 29.42 Sq.mts. ( 317 Sq.ft. ) |
1 BHK | 30.3 Sq.mts. ( 326 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai River Palacelast updated on 13 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
Club House Will Be Provided Before Oc |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Will Be Provided Before Oc |
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Will Be Provided Before Oc |
|
|
Will Be Provided Before Oc |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Will Be Provided Before Oc |
Solid Waste Management And Disposal
|
|
Na |
|
|
Will Be Provided Before Oc |
|
|
Will Be Provided Before Oc |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Will Be Provided Before Oc |
Water Supply100% completed
|
|
Borewell Has Been Completed |
Buildings / Wings in Sai River Palace
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai River Palace by Sai Universal Realtors &Amp; Developers Llplast updated on 13 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
121
apartments in total
Saleable Area Statistics (Sq. ft.)
49360
Total
Total 121 apartments in project. 41 apartments booked. 33% apartments booked.
Total 49360 Sq.ft. saleable area. 25483 saleable area booked.
52% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building No 1 | Jan 1900 | 2 | 0 | 1 | 1 | 0 | 7 | 1 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
Row House | 77.52 Sq.mts. ( 834 Sq.ft. ) | 7 | |
7 total apartments / 7 apartments booked. 100% apartments booked. |
Work Description in Building Building No 1 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building No 2 | Jan 1900 | 2 | 1 | 0 | 1 | 0 | 8 | 1 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
Row House | 77.52 Sq.mts. ( 834 Sq.ft. ) | 8 | |
8 total apartments / 8 apartments booked. 100% apartments booked. |
Work Description in Building Building No 2 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building No 3 | Jan 1900 | 2 | 1 | 0 | 1 | 0 | 7 | 1 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
Row House | 77.52 Sq.mts. ( 834 Sq.ft. ) | 7 | |
7 total apartments / 7 apartments booked. 100% apartments booked. |
Work Description in Building Building No 3 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building No 4 | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 5 | 0 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 22.4 Sq.mts. ( 241 Sq.ft. ) | 4 | |
1 BHK | 22.53 Sq.mts. ( 243 Sq.ft. ) | 16 | |
StudioFlat1 | 21.45 Sq.mts. ( 231 Sq.ft. ) | 1 | |
StudioFlat2 | 32.5 Sq.mts. ( 350 Sq.ft. ) | 2 | |
StudioFlat3 | 35.2 Sq.mts. ( 379 Sq.ft. ) | 1 | |
StudioFlat4 | 29.28 Sq.mts. ( 315 Sq.ft. ) | 4 | |
StudioFlat5 | 32.65 Sq.mts. ( 351 Sq.ft. ) | 8 | |
StudioFlat6 | 33.11 Sq.mts. ( 356 Sq.ft. ) | 4 | |
40 total apartments / 6 apartments booked. 15% apartments booked. |
Work Description in Building Building No 4 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building No 6 | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 10 | 0 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 35.2 Sq.mts. ( 379 Sq.ft. ) | 5 | |
Studio | 22.71 Sq.mts. ( 244 Sq.ft. ) | 4 | |
Studio | 24.29 Sq.mts. ( 261 Sq.ft. ) | 10 | |
19 total apartments / 7 apartments booked. 36% apartments booked. |
Work Description in Building Building No 6 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building No 7E | Jan 1900 | 5 | 1 | 0 | 1 | 0 | 5 | 1 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 32.66 Sq.mts. ( 352 Sq.ft. ) | 1 | |
2 BHK | 40.56 Sq.mts. ( 437 Sq.ft. ) | 1 | |
2 BHK | 41.97 Sq.mts. ( 452 Sq.ft. ) | 16 | |
Shop | 2.94 Sq.mts. ( 32 Sq.ft. ) | 2 | |
Shop | 5.62 Sq.mts. ( 60 Sq.ft. ) | 2 | |
22 total apartments / 5 apartments booked. 22% apartments booked. |
Work Description in Building Building No 7E | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Building No 7F | Jan 1900 | 5 | 1 | 0 | 1 | 0 | 5 | 1 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
1 BHK | 27.45 Sq.mts. ( 295 Sq.ft. ) | 1 | |
1 BHK | 28.36 Sq.mts. ( 305 Sq.ft. ) | 8 | |
1 BHK | 29.42 Sq.mts. ( 317 Sq.ft. ) | 1 | |
1 BHK | 30.3 Sq.mts. ( 326 Sq.ft. ) | 8 | |
18 total apartments / 1 apartments booked. 5% apartments booked. |
Work Description in Building Building No 7F | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Sai Universal Realtors &Amp; Developers Llp
for Project
Sai River Palace
last updated on
13 Jan 2025
as per information obtained from MARA RERA.
Name |
Company |
Location |
Mobile |
Designation |