Project overview

SAI TIRTH PHASE I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020430. SAI TIRTH PHASE I is located at S No. 2 H No 4/B Joveli Village Badlapur East 421503. This is a New being developed by PINNACLE CORPORATION.

SAI TIRTH PHASE I has 1 BHK & 1RK Apartments with carpet areas ranging from 255 to 392 Sq.ft. Carpet. The Project has total 105 of which 16 are currently available for sale.

SAI TIRTH PHASE I is being developed on a total land area of 24004 Sq.ft. SAI TIRTH PHASE I has 2 Wings / Towers Ganga Wing A,Ganga Wing B

ProjectDeveloperLocationPossession
ELITE RESIDENCYE. R. CONSTRUCTIONS27/B/130-06-2024 00:00:00
SHANTI HOUSESHANTISTAR BUILDERSOld Survey No. 197 New Survey No. 2930-12-2021 00:00:00
JP REGENCY PHASE 2JP DEVELOPERSS No 54 H No 4A, S No 57 H No 1Pt, S No 57 H N 2Pt28-02-2023 00:00:00
Krishna IconShree Hari Realty6Zk9tadg0u92fwyor4v/G7sb1et0k4ofqzom9gp/7So=30-05-2022 00:00:00
Palava Olivia CLodha Developers Limited P0vvh2lbjtrias3um5rgkv/Qfhqxb9t1qrn0gpnwcpwhjr18pnslfmg5uwz7pk+V28-08-2023 00:00:00
James Cottage Co-Operative Housing Society LtdShrusti Realtors3Wbleunxv16zuam77o79hq==30-09-2023 00:00:00
Precious ImperialRkr RealityI51mmbbd5fhikswisxfk5/Ekvjhq3dldhtlm8lv7k89val0hiciffkqroumi9tzxfqkhdnqg1selwt1jnil4v+Rsmqampbipeddtudqaqdu=31-08-2025 00:00:00
Chintamani Habitat Angelica Type K And LJashnani Construction Private LimitedNxqghaza5hc30xivihnbu638qc2wj9rr4w6w6fnlzqeyb0ncbbi/Wccrlzykxmda30-12-2024 00:00:00
Giriraj Dreams, The State Bank Of India Employees Cooperative Housing Society LtdPridedream Realtors Private LimitedP7fvdr+Kpckl98hmp/5Sm40auyt7snmm4y2iplyub2o=30-12-2023 00:00:00
KAIRALI PARKRAI RESIDENCY Private LimitedSurvey No 56 Hissa No 3/3 3/4 3/6 4/1 5/130-06-2024 00:00:00
REDEVELOPMENT OF GURUCHARAN CHSSAIRAJ DEVELOPERSS No. 26, H. No. 1/430-03-2023 00:00:00
SHREE PRASTM/S SHREE PRASTSr.No. 58.H.No.4/44 Pt28-02-2022 00:00:00
Sky Villas Wing B1Vertex Newton Projects Private LimitedCkmcz8hixjoputdby/Cefcifntgbi+Dticf7hjrzh/6Sbiupnlxvdymfmkp8i9erjemcbh73gb+A9g/F8oj5k2xv5su2fr4supfplrirnmt1ehyk/6Cokvgcr+Ysryrhkdn94wyv6zf5vyrknj31wg==30-05-2029 00:00:00
Sai SrushtiShakti RealtyWf3krqousfmxgavdqdtsiikhldcd8acgtff/Zr4qc14=30-06-2022 00:00:00
Krishna DhamAtree RealtorsEbpofs4rsmljzw2kk/Xk+3Mmic+7Mdiv+1Yuruvma2juzplshkfmncvtgybvnbrktmmrcts2wtmwhic4c78bbw==31-12-2025 00:00:00
Shreeji Heights Phase IiShubh BuildconBoi3bhk2hw0laqdaeroj4sliws0y/Du47bbqqwpjjvk=31-05-2023 00:00:00
Iris A B And K Phase IiiJeetendra Alias Ravi Amarnath KapoorL/94Ekqshjkm7rtw4wflgonzhbchxo6fxheqyhzswqbdt4vptmzn6ea99+Gynmpu31-12-2025 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesHgoihqktylzdcsviw1heqmuq7etthn6/Jfk06sfhdj4=31-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.G5agszvroya+Uq26azsv+H3fs+Zmktcddfgwslfj0qg=31-12-2028 00:00:00
Green ValleyM S DevelopersGsmyn+Zjm6awrhwp3guylw==30-12-2023 00:00:00
Vighnaharta ArcadeVighnaharta EnterprisesXvk5zqir0j2jysttf6qd5whofvrx2gblccv0ih8+Yoq=30-12-2021 00:00:00
Shree SarvaUmesh Raosaheb Pawar PatilHomfeoaqvp0yd/Z1cwg6ew==30-12-2025 00:00:00
Shiv Aangan ResidencyDHANANJAY DEVELOPERSSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
NANA PATIL RESIDENCYQUALITY BUILDERS & DEVELOPERSPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
SATYAM ORCHIDGIRIJA INFRASTRUCTUREPlot No 1030-12-2021 00:00:00
Lake ViewSai Mahima Infradevelopers Llp1Trb1s7dtvnqweqqhxawuq4adjolfcm4uojigjjnvu+Nyalgzdfgxudrgnuz7kom30-12-2022 00:00:00
Krishna EmpireL K Earth Developers Private LimitedWb5kysirdmvftlz9gzv8oeq5bjnnp8av2gpputg0c+G=28-02-2021 00:00:00
Trident TowerShri Krishna HomesLvcnf/Gjvg9mh5hwbxb+9A==30-12-2022 00:00:00
Wing C-5 GajmukhM K Patil DevelopersVpncibwje6kc3e1sobn4xq==31-12-2019 00:00:00
Valencia EnclaveSiddhivinayak Builders And Developers2Kk7+M3+Kt5cdm2rztq6vq==30-12-2022 00:00:00
Mahek MillenniaSunrise Builders And Developers/7Bkp+Phati75qzn2qkljbckvajufpc8/Ug5p1a0avc=31-07-2024 00:00:00
Vikram Villa Co-Op Housing SocietyChaturthi Developers3Gpa8dxmsfyxvq+G1hiqkib1cbecidonvyilfbjxujy=01-08-2022 00:00:00
Pawan Atharva Phase IPawan Real EstateJfvu/70Yamkh+5Eecnibvyysjdfldb7qedjbdrseockeyw6zkerd+Ovog4a9khel31-08-2026 00:00:00
Mauli SadanMauli ConstructionJojt3nbwrcnel1gcmv+0Ntzgb7p3cdx7qppvssvdffk=04-02-2024 00:00:00
Shivaay AvyaanShreeram BuildconD4+Lrf7ckkiawufuqswhukkcua3ezibumam/Wspkwz2zvn+Rvcf6kcvlhkpg4lli30-11-2025 00:00:00
Shubh Mangalam Phase IiShubh RealityPbhlqjus5dkuu7mgtk74ccbm1al7avb3ppkkbmridio=25-12-2026 00:00:00
SAI LAKE ATULYAMMatoshree ConstructionOld 129/1/A Paiki-3 Plot No. 5, New 129/1/Sh/Plot No. 530-12-2025 00:00:00
IRIS MIRA ROAD EJEETENDRA ALIAS RAVI AMARNATH KAPOOR21/1, 24/230-12-2022 00:00:00
SAI ENCLAVEVIGHNAHARTA DEVELOPERSSurvey No 57 Hissa No 1 And 2 Part30-12-2023 00:00:00
Pyramid CentriaPyramid Infratech CoUzrqserv5r0a9t+Unik90oguaso2kokkjtulhk1aibc=31-12-2028 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdCxqcg/J/Oxk++2Qil2n28a==31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces Infrastructure5Iu9ez7dibcqacol4dh/Goilebivy6pev/9Ests1ci8=30-06-2026 00:00:00
GautamSahara BuildconU3l8ttb+Nacv0zquxjwhaq==30-09-2020 00:00:00
Sai MarinaMahalaxmi Infrastructure6Jwx0r7liw9i4i/E7szhzrjooui9x7kkcufuihg2ibxii12gp1kdrskofesdv/U6cfah5x8vbe2luth16s4lgq==31-12-2019 00:00:00
Walchand HeightsPrakash Hamirmal JainMkfo6szq887ekfky7s3pgg==30-09-2022 00:00:00
Sai CityOm Sai Builders & DevelopersVajipq3mj9xceeueqbb0h6oohbxeafeupj5mwzq34bgw3sttzgncucvqugccolok31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-GenWpn9o/6I5ndycvugo2coxgx+Vkl7hokw46iaiar/Md3w6dqptzzpsvvfaxixr5qu31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevPhfnreyq5bh542emy/Assw==31-12-2025 00:00:00
Balaji GopalSai Balaji EnterprisesSurvey No 30 Hissa No 1 And 2 Part30-06-2026 00:00:00
Balaji KrishnaS S LifespacesSurvey No 29 Hissa No 530-06-2027 00:00:00
Lodha Quality Home Tower 7LODHA DEVELOPERS LIMITED33/9Cp 33/10P 33/11P 33/17P30-03-2026 00:00:00
Ramdev BaseraRamdev BaseraWygjikszj7x1joymkfzrvpgi0mg4vaaotzdos8p6hj0qpqcqminy/R4f1uwmdz5i31-12-2025 00:00:00
Navkar AvenueNavkar EnterprisesCghtuqprdwojhe9gurtnaef5ug/Qzn1me5/Le+Ws2hi=31-12-2025 00:00:00
Krishna Highlands Phase 1M/S Rohan ConstructionBivk0em2gxxnghf4lytygaxt3xy8ho09i3apkby4aji=31-12-2025 00:00:00
Shivdas ArcadeAdi EnterprisesLhuvyvcz2qygcmczyfcr6ilmgeumpbnbycurxwos120ho65dgd3d2ccdqte6wyypt+Beyyzmyclbki5oyhfhsq==31-01-2023 00:00:00
Watson ApartmentSai Prakash Builders And DevelopersRz9l21azsvaoi9g7co8nnvwrrkg7+Wddjbjwmnh83w8=31-10-2024 00:00:00
Narayani Dham Building No 1AMaya Developer9Khczfzuk8woau0yn5qypgwvhcqrs2c00ysuhlpj9lh59sdwj49etqmxyyybdqm831-12-2026 00:00:00
Sai Shatabdi ResidencyPrarthana EnterprisesMt29fy+Huh1jobasflimtg==30-12-2020 00:00:00
Shiv Sai AwasVidisha ConstructionsFmupky6li/Gbasnlodkimcq1t+Wdhjngfi++Aftv9w0=31-03-2024 00:00:00
Palm LandsSadguru Build Projects Private LimitedEupuqv5nkxnxyxqhoqjkqw==31-03-2024 00:00:00
Siyara EliteShakti Realty5Iphxox4dpsmx8rrd9j6rnpc00rj7nwyrtior0zo7yaaxr4bhm9ga+Nhrfdf5g6/Ha2ed4jgkxfchvhe8fm2t26duuq+Pvy/2Ibkkwrlemq=31-03-2025 00:00:00
RITZ PHASE - 1VIKAS HARAKCHAND JAINSurvey No 39/5 Part30-12-2022 00:00:00
M/S OM SHAKTI SWASTIK Co-Op Hsg Soc LtdM/S SPARSH INFRAPlot No. 15, Gatt No. 5830-06-2022 00:00:00
Codename One and OnlyLODHA DEVELOPERS LIMITED21/14,21/16,21/17,21/19 Of Vehele, 21/7 To 21/9, 27/1, 33/10, 33/11, 33/9, 34/2P Of Mankoli, 41/1 To 41/3, 46/1, 47/1,47/5A,47/5B,47/8,47/10 To 47/18,47/2,47/21,47/23,47/24P,47/3B&C,47/7,48/1,48/330-06-2026 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanJcpieco0pjhg4ucc0aqrdg==30-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti RealtyCawncmsdjx659n1v/Tzrqmwpfapjyfqysxm8n08gqfn5euyipra56utkioqdrxuquffawsovllqfefa3rh1owq==31-12-2027 00:00:00
Aai Mauli ParkHendar Laxman MhatreCmi923ycmq2lo5im1m5k1csjn0ivihytzhpbtvriv0oplnbh0anhtvw3i/Leb0j7nep/Rjxmiw+Cw2auc9kaga==31-12-2025 00:00:00
Priyal AumShree Mauli Chs LtdZejakr71ylapmxpxirpd3xuu9uk2xlaiwjhcqcz5etu=01-06-2024 00:00:00
Chandrakant ResidencyAmogh ConstructionHbbalqqdhr+L2fkuzroyqidzy5plj0mlcajjdl+Himm53+Ckaw0mc09njuhddtxlns/Jgzgklpo9tt2cllgaqg==31-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersW+Ur6sbb6ndevg1ndcqvkknrelxa0w4hdyjry9o1sak=30-06-2026 00:00:00
Laxmi KrupaOmkar EnterprisesZyxvudxfxzxhjnkljqmajv9erzwmmibqy3z1bl2083jh0dtrri7z5z2kf8qqx8sr30-03-2023 00:00:00
Priti HeightsAarti Home Makers Private LimitedJpovxouclhrqbdprjveyqcy8cdd1/5Zjy7shkc+Eceq=30-09-2019 00:00:00
Regency Anantam Phase IRegency Nirman Ltd8Sil+Dau5prbtuf1l12hco9nxfzlmk3bfpjlhs66njjn2p7+Utwhdlxbeyiridps5p1x00iv+Mxirylvtbdfodi1opee/Wkktmzxnfezcey=30-03-2022 00:00:00
ANAND DHAMVHS Developers10720,10721,10722,1072330-09-2023 00:00:00
SARVODAYGREENSGIRIRAJ REALTORS107/1 90/4 89/2/1 90/3 110/2 110/1 110/1/6 107/2 110/1/2 110/1/730-06-2024 00:00:00
MOHAN DEEPSUNIL PURUSHOTTAM DESHMUKHOld Survey No 2 Hissa No 6 Pt New Survey No 23 Hissa No 6 Part30-09-2026 00:00:00
Project Details
  • Project:
    SAI TIRTH PHASE I
  • Location:
  • S No. 2 H No 4/B Joveli Village Badlapur East 421503
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    PINNACLE CORPORATION
  • Phone:
  • Address:
  • Shreeji Centre
Project RERA Details
MAHA REARA No: P51700020430
Project Type Residential / Group Housing
RERA Project Status New
Architect Pramod V Patil And Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Apr 2019
Last Retrived 13 Feb 2026
SAI TIRTH PHASE I QR Code
SAI TIRTH PHASE I
MahaRERA - P51700020430
Apartment Details & Configuration
TypeArea
1 BHK33.37 Sq.mts. ( 359 Sq.ft. )
1 BHK33.4 Sq.mts. ( 360 Sq.ft. )
1RK21.9 Sq.mts. ( 236 Sq.ft. )
1RK26.41 Sq.mts. ( 284 Sq.ft. )
2 BHK51.47 Sq.mts. ( 554 Sq.ft. )
Office space16.78 Sq.mts. ( 181 Sq.ft. )
Office space12.13 Sq.mts. ( 131 Sq.ft. )
Office space12.98 Sq.mts. ( 140 Sq.ft. )
Shop13.06 Sq.mts. ( 141 Sq.ft. )
Shop14.44 Sq.mts. ( 155 Sq.ft. )
Shop16.09 Sq.mts. ( 173 Sq.ft. )
Shop12.84 Sq.mts. ( 138 Sq.ft. )
Shop9.25 Sq.mts. ( 100 Sq.ft. )
Shop10.45 Sq.mts. ( 112 Sq.ft. )
Shop11.59 Sq.mts. ( 125 Sq.ft. )
Shop16.8 Sq.mts. ( 181 Sq.ft. )
Shop18.15 Sq.mts. ( 195 Sq.ft. )
1 BHK34.42 Sq.mts. ( 370 Sq.ft. )
1 BHK36.41 Sq.mts. ( 392 Sq.ft. )
1RK23.71 Sq.mts. ( 255 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of SAI TIRTH PHASE Ilast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
CCTV IN COMMON AREA
At The Time Of Completion
Community Buildings75% completed
75% Complete
Society Office And Security Cabin
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
At The Time Of Completion
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Before Completion
FITNESS CENTRE AND MEDITATION AREA
At The Time Of Completion
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Septic Tank At The Time Of Completion
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
At The Time Of Completion
Water Supply80% completed
80% Complete
At The Time Of Completion
YOGA AND MEDITATION AREA
At The Time Of Completion
Buildings / Wings in SAI TIRTH PHASE I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of SAI TIRTH PHASE I by PINNACLE CORPORATIONlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

24004 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

105 apartments in total
Total
105
Booked
89
Available
16

Saleable Area Statistics (Sq. ft.)

34362 Total
Total
34362
Booked
30021
Available
4341
Total 105 apartments in project. 89 apartments booked. 84% apartments booked.
Total 34362 Sq.ft. saleable area. 30021 saleable area booked.
87% area booked.

Ganga Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ganga Wing ADec 20228100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.37 Sq.mts. ( 359 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK33.4 Sq.mts. ( 360 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK21.9 Sq.mts. ( 236 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK26.41 Sq.mts. ( 284 Sq.ft. )7
5 Booked71% Booked
71% Booked
2 BHK51.47 Sq.mts. ( 554 Sq.ft. )7
5 Booked71% Booked
71% Booked
Office space16.78 Sq.mts. ( 181 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space12.13 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space12.98 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.06 Sq.mts. ( 141 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.44 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.09 Sq.mts. ( 173 Sq.ft. )3
2 Booked66% Booked
66% Booked
Shop12.84 Sq.mts. ( 138 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop9.25 Sq.mts. ( 100 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop10.45 Sq.mts. ( 112 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.59 Sq.mts. ( 125 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.8 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.15 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
56 total apartments / 44 apartments booked. 78% apartments booked.
Work Description in Building Ganga Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress83% done
83% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress97% done
97% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Ganga Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ganga Wing BDec 20228100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.37 Sq.mts. ( 359 Sq.ft. )28
24 Booked85% Booked
85% Booked
1 BHK34.42 Sq.mts. ( 370 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK36.41 Sq.mts. ( 392 Sq.ft. )7
7 Booked100% Booked
100% Booked
1RK23.71 Sq.mts. ( 255 Sq.ft. )7
7 Booked100% Booked
100% Booked
49 total apartments / 45 apartments booked. 91% apartments booked.
Work Description in Building Ganga Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress83% done
83% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress97% done
97% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
PINNACLE CORPORATION
for Project
SAI TIRTH PHASE I
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation