Project overview

Samruddhi Evergreen-Phase-4B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700009016. Samruddhi Evergreen-Phase-4B is located at Thane, 421503. This is a On-Going Project being developed by Poddar Housing And Development Limited.

Samruddhi Evergreen-Phase-4B has 1 BHK & SHOP Apartments with carpet areas ranging from 248 to 334 Sq.ft. Carpet. The Project has total 178 of which 19 are currently available for sale.

Samruddhi Evergreen-Phase-4B is being developed on a total land area of 39934 Sq.ft. Samruddhi Evergreen-Phase-4B has 11 Wings / Towers 129,130,131,132,133,134,135,136,137,138,139

ProjectDeveloperLocationPossession
Daimond Lifespace Wing 4Ekveera Skyliner Construction Co Private LimitedThane, 42150331-12-2019 00:00:00
Sky Gardens At Godrej VihaaK. R. Real Estate Pvt. Ltd.Thane, 42150230-12-2023 00:00:00
Adiraj CrystalShree Adiraj Laxmi Builders Pvt. LtdThane, 42150331-12-2017 00:00:00
Panvelkar Greens - Phase IEshan DevelopersBadlapur Neral Road, Joveli, Joveli31-12-2025 00:00:00
Dashmesh Crystal Phase 2Dashmesh InfrastructureNeral Badlapur Highway, Kharvai Chowk, Kharvai Chowk30-06-2024 00:00:00
Sai Tirth Phase IiPinnacle CorporationVillage Joveli, Joveli, Joveli31-03-2025 00:00:00
Samruddhi Evergreen-Phase-4BPoddar Housing And Development LimitedThane, 42150331-03-2019 00:00:00
Usha Kiran Residency Wing E1 E2 E3Usha Construction CoThane, 42150331-10-2017 00:00:00
Samruddhi Evergreens-Phase-4APoddar Housing And Development LimitedThane, 42150331-03-2018 00:00:00
SiddhicitySiddhitech Homes Private LimitedThane, 42150330-06-2017 00:00:00
Siddhicity Phase-VSiddhitech Homes Private LimitedThane, 42150331-10-2017 00:00:00
Godrej Vihaa Phase 2K. R. Real Estate Pvt. Ltd.Thane, 42150214-08-2021 00:00:00
Usha Kiran Residency F1 F2Stalwart Impex Pvt LtdThane, 42150331-12-2018 00:00:00
Shree Uma Shankar ApartmentShree Sai Aashray DevelopersThane, 42150331-03-2018 00:00:00
Godrej Vihaa Phase 5K. R. Real Estate Pvt. Ltd.Thane, 42150230-12-2031 00:00:00
Neelkanth JyotPrapti EnterprisesThane, 42150330-06-2019 00:00:00
Daimond LifespaceEkveera Skyliner Construction Co Private LimitedThane, 42150331-12-2017 00:00:00
Ekveera GardensPradeep DhuleThane, 42150331-12-2018 00:00:00
Shivshakti GreensShivshakti RealityKharvai Naka, Joveli Gaon, Joveli Gaon30-12-2022 00:00:00
Evergreen Residency Wing A,B,D,EBalaji ConstructionBadalapur Gaon, Badlapur West, Badlapur West30-12-2022 00:00:00
Project Details
  • Project:
    Samruddhi Evergreen-Phase-4B
  • Location:
  • Thane, 421503
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Poddar Housing And Development Limited
  • Phone:
  • Address:
  • Unit No. 3-5, Poddar Group Building, 126 N M Joshi Marg, Mathuradas Mill Compound, Lower Parel West, 400013
Project RERA Details
MAHA REARA No: P51700009016
Project Type Others
RERA Project Status On-Going Project
Funding Bank HDFC BANK LTD
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession
Litigations No Litigations
Last Modified 30 Sep 2022
Last Retrived 18 Jan 2025
Samruddhi Evergreen-Phase-4B QR Code
Samruddhi Evergreen-Phase-4B
MahaRERA - P51700009016
Apartment Details & Configuration
TypeArea
1 BHK31 Sq.mts. ( 334 Sq.ft. )
3 BHK64 Sq.mts. ( 689 Sq.ft. )
SHOP12 Sq.mts. ( 129 Sq.ft. )
SHOP24 Sq.mts. ( 258 Sq.ft. )
SHOP30 Sq.mts. ( 323 Sq.ft. )
SHOP23 Sq.mts. ( 248 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Samruddhi Evergreen-Phase-4Blast updated on 18 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Common For Entire Project
Community Buildings100% completed
95% Complete
Common For Entire Project
Electrical Meter Room, Sub-Station, Receiving Station85% completed
85% Complete
Under Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Fire Extinuisher As G+3 Building
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Common
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp Ready For Entire Project
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Samruddhi Evergreen-Phase-4B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Samruddhi Evergreen-Phase-4B by Poddar Housing And Development Limitedlast updated on 18 Jan 2025 as per information obtained from MARA RERA.

39934 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 11

Wings / Towers in Project

Apartments Statistics

178 apartments in total
Total
178
Booked
159
Available
19

Saleable Area Statistics (Sq. ft.)

58718 Total
Total
58718
Booked
52055
Available
6663
Total 178 apartments in project. 159 apartments booked. 89% apartments booked.
Total 58718 Sq.ft. saleable area. 52055 saleable area booked.
89% area booked.

129

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
129Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )16
16 Booked100% Booked
100% Booked
16 total apartments / 16 apartments booked. 100% apartments booked.
Work Description in Building 129Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

130

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
130Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )16
14 Booked87% Booked
87% Booked
16 total apartments / 14 apartments booked. 87% apartments booked.
Work Description in Building 130Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

131

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
131Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )16
14 Booked87% Booked
87% Booked
16 total apartments / 14 apartments booked. 87% apartments booked.
Work Description in Building 131Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

132

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
132Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK64 Sq.mts. ( 689 Sq.ft. )6
6 Booked100% Booked
100% Booked
SHOP12 Sq.mts. ( 129 Sq.ft. )10
10 Booked100% Booked
100% Booked
16 total apartments / 16 apartments booked. 100% apartments booked.
Work Description in Building 132Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

133

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
133Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK64 Sq.mts. ( 689 Sq.ft. )6
4 Booked66% Booked
66% Booked
SHOP12 Sq.mts. ( 129 Sq.ft. )10
9 Booked90% Booked
90% Booked
16 total apartments / 13 apartments booked. 81% apartments booked.
Work Description in Building 133Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

134

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
134Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )16
14 Booked87% Booked
87% Booked
16 total apartments / 14 apartments booked. 87% apartments booked.
Work Description in Building 134Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

135

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
135Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )16
13 Booked81% Booked
81% Booked
16 total apartments / 13 apartments booked. 81% apartments booked.
Work Description in Building 135Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

136

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
136Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )16
13 Booked81% Booked
81% Booked
16 total apartments / 13 apartments booked. 81% apartments booked.
Work Description in Building 136Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

137

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
137Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )12
12 Booked100% Booked
100% Booked
SHOP24 Sq.mts. ( 258 Sq.ft. )5
4 Booked80% Booked
80% Booked
17 total apartments / 16 apartments booked. 94% apartments booked.
Work Description in Building 137Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

138

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
138Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )12
12 Booked100% Booked
100% Booked
SHOP30 Sq.mts. ( 323 Sq.ft. )4
2 Booked50% Booked
50% Booked
16 total apartments / 14 apartments booked. 87% apartments booked.
Work Description in Building 138Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

139

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
139Mar 20194100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )12
12 Booked100% Booked
100% Booked
SHOP23 Sq.mts. ( 248 Sq.ft. )5
4 Booked80% Booked
80% Booked
17 total apartments / 16 apartments booked. 94% apartments booked.
Work Description in Building 139Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Poddar Housing And Development Limited
for Project
Samruddhi Evergreen-Phase-4B
last updated on 18 Jan 2025 as per information obtained from MARA RERA.