Project overview

SHREE SARASWATI CHSL PLOT 8 A is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001302. SHREE SARASWATI CHSL PLOT 8 A is located at Cts No 8 A. This is a Ongoing being developed by Nav Durga Construction Company.

SHREE SARASWATI CHSL PLOT 8 A has A2WING2 BHK, A3WING1 BHK, WING A2 1BHK, WINGA2SHOP1, WINGA2SHOP2 & WINGA2SHOP3 Apartments with carpet areas ranging from 262 to 668 Sq.ft. Carpet. The Project has total 69 of which 18 are currently available for sale.

SHREE SARASWATI CHSL PLOT 8 A is being developed on a total land area of 15141 Sq.ft. SHREE SARASWATI CHSL PLOT 8 A has 1 Wings / Towers Shree Saraswati Chsl Wing A2 And A3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    SHREE SARASWATI CHSL PLOT 8 A
  • Location:
  • Cts No 8 A
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Nav Durga Construction Company
  • Phone:
  • Address:
  • Big Splash
Project RERA Details
MAHA REARA No: P51800001302
Project Type Others
RERA Project Status Ongoing
Architect B H Wadhwa
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 27 Jul 2017
Last Retrived 13 Feb 2026
SHREE SARASWATI CHSL PLOT 8 A QR Code
SHREE SARASWATI CHSL PLOT 8 A
MahaRERA - P51800001302
Apartment Details & Configuration
TypeArea
A2WING2 BHK62.02 Sq.mts. ( 668 Sq.ft. )
A3WING1 BHK34.62 Sq.mts. ( 373 Sq.ft. )
WING A2 1BHK39.54 Sq.mts. ( 426 Sq.ft. )
WINGA2SHOP157.5 Sq.mts. ( 619 Sq.ft. )
WINGA2SHOP224.36 Sq.mts. ( 262 Sq.ft. )
WINGA2SHOP355.15 Sq.mts. ( 594 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of SHREE SARASWATI CHSL PLOT 8 Alast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal50% completed
50% Complete
-
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
-
Water Supply
Na
Buildings / Wings in SHREE SARASWATI CHSL PLOT 8 A
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of SHREE SARASWATI CHSL PLOT 8 A by Nav Durga Construction Companylast updated on 13 Feb 2026 as per information obtained from MARA RERA.

15141 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

69 apartments in total
Total
69
Booked
51
Available
18

Saleable Area Statistics (Sq. ft.)

35705 Total
Total
35705
Booked
26765
Available
8940
Total 69 apartments in project. 51 apartments booked. 73% apartments booked.
Total 35705 Sq.ft. saleable area. 26765 saleable area booked.
75% area booked.

Shree Saraswati Chsl Wing A2 And A3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Saraswati Chsl Wing A2 And A3Jan 1900151010048
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
A2WING2 BHK62.02 Sq.mts. ( 668 Sq.ft. )28
22 Booked78% Booked
78% Booked
A3WING1 BHK34.62 Sq.mts. ( 373 Sq.ft. )12
5 Booked41% Booked
41% Booked
WING A2 1BHK39.54 Sq.mts. ( 426 Sq.ft. )26
24 Booked92% Booked
92% Booked
WINGA2SHOP157.5 Sq.mts. ( 619 Sq.ft. )1
None Booked0% Booked
0% Booked
WINGA2SHOP224.36 Sq.mts. ( 262 Sq.ft. )1
None Booked0% Booked
0% Booked
WINGA2SHOP355.15 Sq.mts. ( 594 Sq.ft. )1
None Booked0% Booked
0% Booked
69 total apartments / 51 apartments booked. 73% apartments booked.
Work Description in Building Shree Saraswati Chsl Wing A2 And A3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress46% done
46% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked
Channel Partners
Channel Partners Registered by Developer
Nav Durga Construction Company
for Project
SHREE SARASWATI CHSL PLOT 8 A
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation