Project overview

Sunteck Beach Residences 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000045499. Sunteck Beach Residences 2 is located at Suruchi Beach Road, Village Dhovali, Village Dhovali. This is a New Project being developed by Sunteck Real Estates Private Limited.

Sunteck Beach Residences 2 has 3 BHK Apartments with carpet areas ranging from 767 to 859 Sq.ft. Carpet. The Project has total 306 of which 201 are currently available for sale.

Sunteck Beach Residences 2 is being developed on a total land area of 40742 Sq.ft. Sunteck Beach Residences 2 has 2 Wings / Towers Tower-A1,Tower-A2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sunteck Beach Residences 2
  • Location:
  • Suruchi Beach Road, Village Dhovali, Village Dhovali
  • Const. Stage:
    New Project
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Sunteck Real Estates Private Limited
  • Phone:
  • Address:
  • 5Th Floor, Sunteck Centre, 37-40 Subhash Road, Next To Sbi, Vile Parle East, 400057
Project RERA Details
MAHA REARA No: P99000045499
Project Type Residential
RERA Project Status New Project
Funding Bank Axis Bank Ltd
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations Yes
Last Modified 25 Jan 2024
Last Retrived 13 Jan 2025
Sunteck Beach Residences 2 QR Code
Sunteck Beach Residences 2
MahaRERA - P99000045499
Apartment Details & Configuration
TypeArea
3 BHK71.21 Sq.mts. ( 767 Sq.ft. )
3 BHK78.02 Sq.mts. ( 840 Sq.ft. )
3 BHK79.11 Sq.mts. ( 852 Sq.ft. )
3 BHK79.79 Sq.mts. ( 859 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sunteck Beach Residences 2last updated on 13 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Work Not Started
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Work Not Started
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting
Work Not Started
Open Parking
Work Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Work Not Started
Storm Water Drains
Work Not Started
Street Lighting
Work Not Started
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply
Work Not Started
Buildings / Wings in Sunteck Beach Residences 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sunteck Beach Residences 2 by Sunteck Real Estates Private Limitedlast updated on 13 Jan 2025 as per information obtained from MARA RERA.

40742 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

306 apartments in total
Total
306
Booked
105
Available
201

Saleable Area Statistics (Sq. ft.)

254683 Total
Total
254683
Booked
89529
Available
165154
Total 306 apartments in project. 105 apartments booked. 34% apartments booked.
Total 254683 Sq.ft. saleable area. 89529 saleable area booked.
35% area booked.

Tower-A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-A1Dec 202728111516080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK71.21 Sq.mts. ( 767 Sq.ft. )36
None Booked0% Booked
0% Booked
3 BHK78.02 Sq.mts. ( 840 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK79.11 Sq.mts. ( 852 Sq.ft. )88
46 Booked52% Booked
52% Booked
3 BHK79.79 Sq.mts. ( 859 Sq.ft. )24
9 Booked37% Booked
37% Booked
153 total apartments / 55 apartments booked. 35% apartments booked.
Work Description in Building Tower-A1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Tower-A2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-A2Dec 202728111516080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK71.21 Sq.mts. ( 767 Sq.ft. )36
None Booked0% Booked
0% Booked
3 BHK78.02 Sq.mts. ( 840 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK79.11 Sq.mts. ( 852 Sq.ft. )88
43 Booked48% Booked
48% Booked
3 BHK79.79 Sq.mts. ( 859 Sq.ft. )24
7 Booked29% Booked
29% Booked
153 total apartments / 50 apartments booked. 32% apartments booked.
Work Description in Building Tower-A2Completion
Excavation
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Sunteck Real Estates Private Limited
for Project
Sunteck Beach Residences 2
last updated on 13 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation