Project overview
Sunteck Beach Residences 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000045599. Sunteck Beach Residences 4 is located at Suruchi Beach Road, Village Dhovali, Village Dhovali. This is a New Project being developed by Sunteck Real Estates Private Limited.
Sunteck Beach Residences 4 has 2 BHK Apartments with carpet areas ranging from 592 to 768 Sq.ft. Carpet. The Project has total 435 of which 364 are currently available for sale.
Sunteck Beach Residences 4 is being developed on a total land area of 66791 Sq.ft. Sunteck Beach Residences 4 has 4 Wings / Towers Tower-A3,Tower-A4,Tower-B3,Tower-B4
Project | Developer | Location | Possession |
-
Project:
Sunteck Beach Residences 4
-
Location:
-
Suruchi Beach Road, Village Dhovali, Village Dhovali
-
Const. Stage:
New Project
-
Possession:
31 Jul 2030
-
Developer:
Sunteck Real Estates Private Limited
-
Phone:
-
Address:
-
5Th Floor, Sunteck Centre, 37-40 Subhash Road, Next To Sbi, Vile Parle East, 400057
MAHA REARA No: |
P99000045599 |
Project Type |
Residential |
RERA Project Status |
New Project |
Funding Bank |
Axis Bank Ltd |
Proposed Possession |
31 Jul 2030 |
Revised Possession |
|
Extended Possession |
|
Litigations |
Yes |
Last Modified |
25 Jan 2024 |
Last Retrived |
13 Jan 2025 |
Sunteck Beach Residences 4 QR Code
Sunteck Beach Residences 4
MahaRERA - P99000045599
Type | Area |
3 BHK | 95.86 Sq.mts. ( 1032 Sq.ft. ) |
3 BHK | 96.35 Sq.mts. ( 1037 Sq.ft. ) |
3 BHK | 98.01 Sq.mts. ( 1055 Sq.ft. ) |
3 BHK | 98.11 Sq.mts. ( 1056 Sq.ft. ) |
2 BHK | 54.96 Sq.mts. ( 592 Sq.ft. ) |
2 BHK | 55.39 Sq.mts. ( 596 Sq.ft. ) |
2 BHK | 71.34 Sq.mts. ( 768 Sq.ft. ) |
2 BHK | 72.32 Sq.mts. ( 778 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Sunteck Beach Residences 4last updated on 13 Jan 2025
as per information obtained from MARA RERA.
Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Work Not Started |
|
|
Work Not Started |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Work Not Started |
|
|
Work Not Started |
Fire Protection And Fire Safety
Requirements
|
|
Work Not Started |
Landscaping & Tree Planting
|
|
Work Not Started |
|
|
Work Not Started |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Work Not Started |
Solid Waste Management And Disposal
|
|
Work Not Started |
|
|
Work Not Started |
|
|
Work Not Started |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Work Not Started |
Water Conservation, Rain water Harvesting
|
|
Work Not Started |
|
|
Work Not Started |
Buildings / Wings in Sunteck Beach Residences 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sunteck Beach Residences 4 by Sunteck Real Estates Private Limitedlast updated on 13 Jan 2025
as per information obtained from MARA RERA.
Apartments Statistics
435
apartments in total
Saleable Area Statistics (Sq. ft.)
360390
Total
Total 435 apartments in project. 71 apartments booked. 16% apartments booked.
Total 360390 Sq.ft. saleable area. 59796 saleable area booked.
17% area booked.
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Tower-A3 | Dec 2028 | 28 | 1 | 1 | 1 | 2 | 117 | 117 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
3 BHK | 95.86 Sq.mts. ( 1032 Sq.ft. ) | 88 | |
3 BHK | 96.35 Sq.mts. ( 1037 Sq.ft. ) | 24 | |
112 total apartments / 40 apartments booked. 35% apartments booked. |
Work Description in Building Tower-A3 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Tower-A4 | Dec 2028 | 28 | 1 | 1 | 1 | 2 | 117 | 117 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
3 BHK | 98.01 Sq.mts. ( 1055 Sq.ft. ) | 56 | |
3 BHK | 98.11 Sq.mts. ( 1056 Sq.ft. ) | 56 | |
112 total apartments / 0 apartments booked. 0% apartments booked. |
Work Description in Building Tower-A4 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Tower-B3 | Jul 2030 | 28 | 1 | 1 | 1 | 3 | 150 | 75 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
2 BHK | 54.96 Sq.mts. ( 592 Sq.ft. ) | 60 | |
2 BHK | 55.39 Sq.mts. ( 596 Sq.ft. ) | 78 | |
2 BHK | 71.34 Sq.mts. ( 768 Sq.ft. ) | 2 | |
2 BHK | 72.32 Sq.mts. ( 778 Sq.ft. ) | 3 | |
143 total apartments / 31 apartments booked. 21% apartments booked. |
Work Description in Building Tower-B3 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
Tower-B4 | Dec 2028 | 18 | 1 | 1 | 1 | 3 | 111 | 42 |
Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
2 BHK | 54.96 Sq.mts. ( 592 Sq.ft. ) | 60 | |
2 BHK | 55.39 Sq.mts. ( 596 Sq.ft. ) | 6 | |
2 BHK | 71.34 Sq.mts. ( 768 Sq.ft. ) | 2 | |
68 total apartments / 0 apartments booked. 0% apartments booked. |
Work Description in Building Tower-B4 | Completion |
Excavation | |
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
Overall Percentage of Completion of the work done For the entire Building /Wing | |
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
Stilt Floor | |
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
X number of Basement(s) and Plinth | |
X number of Podiums | |
X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Sunteck Real Estates Private Limited
for Project
Sunteck Beach Residences 4
last updated on
13 Jan 2025
as per information obtained from MARA RERA.