Sunteck Beach Residences 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000045599. Sunteck Beach Residences 4 is located at Suruchi Beach Road, Village Dhovali, Village Dhovali. This is a New Project being developed by Sunteck Real Estates Private Limited.

Sunteck Beach Residences 4 has 2 BHK Apartments with carpet areas ranging from 592 to 768 Sq.ft. Carpet. The Project has total 435 of which 364 are currently available for sale.

Sunteck Beach Residences 4 is being developed on a total land area of 66791 Sq.ft. Sunteck Beach Residences 4 has 4 Wings / Towers Tower-A3,Tower-A4,Tower-B3,Tower-B4

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sunteck Beach Residences 4
  • Location:
  • Suruchi Beach Road, Village Dhovali, Village Dhovali
  • Const. Stage:
    New Project
  • Possession:
    31 Jul 2030
Developer Details

  • Developer:
    Sunteck Real Estates Private Limited
  • Phone:
  • Address:
  • 5Th Floor, Sunteck Centre, 37-40 Subhash Road, Next To Sbi, Vile Parle East, 400057
Project RERA Details
MAHA REARA No: P99000045599
Project Type Residential
RERA Project Status New Project
Funding Bank Axis Bank Ltd
Proposed Possession 31 Jul 2030
Revised Possession
Extended Possession
Litigations Yes
Last Modified 25 Jan 2024
Last Retrived 13 Jan 2025
Sunteck Beach Residences 4 QR Code
Sunteck Beach Residences 4
MahaRERA - P99000045599
Apartment Details & Configuration
TypeArea
3 BHK95.86 Sq.mts. ( 1032 Sq.ft. )
3 BHK96.35 Sq.mts. ( 1037 Sq.ft. )
3 BHK98.01 Sq.mts. ( 1055 Sq.ft. )
3 BHK98.11 Sq.mts. ( 1056 Sq.ft. )
2 BHK54.96 Sq.mts. ( 592 Sq.ft. )
2 BHK55.39 Sq.mts. ( 596 Sq.ft. )
2 BHK71.34 Sq.mts. ( 768 Sq.ft. )
2 BHK72.32 Sq.mts. ( 778 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sunteck Beach Residences 4last updated on 13 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Started
Community Buildings
Work Not Started
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Work Not Started
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting
Work Not Started
Open Parking
Work Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Work Not Started
Storm Water Drains
Work Not Started
Street Lighting
Work Not Started
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply
Work Not Started
Buildings / Wings in Sunteck Beach Residences 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sunteck Beach Residences 4 by Sunteck Real Estates Private Limitedlast updated on 13 Jan 2025 as per information obtained from MARA RERA.

66791 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

435 apartments in total
Total
435
Booked
71
Available
364

Saleable Area Statistics (Sq. ft.)

360390 Total
Total
360390
Booked
59796
Available
300594
Total 435 apartments in project. 71 apartments booked. 16% apartments booked.
Total 360390 Sq.ft. saleable area. 59796 saleable area booked.
17% area booked.

Tower-A3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-A3Dec 2028281112117117
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK95.86 Sq.mts. ( 1032 Sq.ft. )88
28 Booked31% Booked
31% Booked
3 BHK96.35 Sq.mts. ( 1037 Sq.ft. )24
12 Booked50% Booked
50% Booked
112 total apartments / 40 apartments booked. 35% apartments booked.
Work Description in Building Tower-A3Completion
Excavation
work-in-progress35% done
35% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tower-A4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-A4Dec 2028281112117117
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK98.01 Sq.mts. ( 1055 Sq.ft. )56
None Booked0% Booked
0% Booked
3 BHK98.11 Sq.mts. ( 1056 Sq.ft. )56
None Booked0% Booked
0% Booked
112 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower-A4Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tower-B3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-B3Jul 203028111315075
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.96 Sq.mts. ( 592 Sq.ft. )60
2 BHK55.39 Sq.mts. ( 596 Sq.ft. )78
26 Booked33% Booked
33% Booked
2 BHK71.34 Sq.mts. ( 768 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK72.32 Sq.mts. ( 778 Sq.ft. )3
None Booked0% Booked
0% Booked
143 total apartments / 31 apartments booked. 21% apartments booked.
Work Description in Building Tower-B3Completion
Excavation
work-in-progress66% done
66% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tower-B4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower-B4Dec 202818111311142
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.96 Sq.mts. ( 592 Sq.ft. )60
None Booked0% Booked
0% Booked
2 BHK55.39 Sq.mts. ( 596 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK71.34 Sq.mts. ( 768 Sq.ft. )2
None Booked0% Booked
0% Booked
68 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower-B4Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Sunteck Real Estates Private Limited
for Project
Sunteck Beach Residences 4
last updated on 13 Jan 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation