Project overview

The Green Orchid Phase Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000023554. The Green Orchid Phase Ii is located at Survey No.139. This is a New being developed by Shakti Developers.

The Green Orchid Phase Ii has 1 BHK & 1RK Apartments with carpet areas ranging from 203 to 332 Sq.ft. Carpet. The Project has total 226 of which 185 are currently available for sale.

The Green Orchid Phase Ii is being developed on a total land area of 67889 Sq.ft. out of which 6792 Sq.ft. i.e 10% is reserved for recreational purposes. The Green Orchid Phase Ii has 3 Wings / Towers E Wing Lavender,F Wing Lilly,G Wing Lotus

ProjectDeveloperLocationPossession
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Kapleshwara ResidencyKapleshwara Homes Llp119/6C (Old), 84/6C (New)31-12-2029 00:00:00
Sara TowerHope Builders And Developers233 And 23431-12-2026 00:00:00
Vedang Lake CityVedang ConstructionS. No. 4 H. No. 2/1 And S. No. 12 H. No 1/331-12-2025 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Project Details
  • Project:
    The Green Orchid Phase Ii
  • Location:
  • Survey No.139
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Shakti Developers
  • Phone:
  • Address:
  • Kashi Kunj Chs.,
Project RERA Details
MAHA REARA No: P52000023554
Project Type Residential / Group Housing
RERA Project Status New
Architect The Design India
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 19 Dec 2019
Last Retrived 28 Jul 2025
The Green Orchid Phase Ii QR Code
The Green Orchid Phase Ii
MahaRERA - P52000023554
Apartment Details & Configuration
TypeArea
1 BHK26.29 Sq.mts. ( 283 Sq.ft. )
1 BHK26.62 Sq.mts. ( 287 Sq.ft. )
1 BHK26.74 Sq.mts. ( 288 Sq.ft. )
1 BHK30.88 Sq.mts. ( 332 Sq.ft. )
1RK18.84 Sq.mts. ( 203 Sq.ft. )
1RK20.78 Sq.mts. ( 224 Sq.ft. )
Shop7.7 Sq.mts. ( 83 Sq.ft. )
Shop10 Sq.mts. ( 108 Sq.ft. )
Shop10.1 Sq.mts. ( 109 Sq.ft. )
Shop18.06 Sq.mts. ( 194 Sq.ft. )
1 BHK26.27 Sq.mts. ( 283 Sq.ft. )
1 BHK26.61 Sq.mts. ( 286 Sq.ft. )
1 BHK26.63 Sq.mts. ( 287 Sq.ft. )
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )
1RK20.35 Sq.mts. ( 219 Sq.ft. )
1 BHK26.17 Sq.mts. ( 282 Sq.ft. )
1 BHK26.3 Sq.mts. ( 283 Sq.ft. )
1 BHK26.49 Sq.mts. ( 285 Sq.ft. )
1 BHK26.75 Sq.mts. ( 288 Sq.ft. )
1 BHK30.54 Sq.mts. ( 329 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Green Orchid Phase Iilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
As Per Approved Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
As Per Approved Plan
Buildings / Wings in The Green Orchid Phase Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Green Orchid Phase Ii by Shakti Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

67889 Sq. ft.

Project Area

6792 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

226 apartments in total
Total
226
Booked
41
Available
185

Saleable Area Statistics (Sq. ft.)

60977 Total
Total
60977
Booked
10956
Available
50021
Total 226 apartments in project. 41 apartments booked. 18% apartments booked.
Total 60977 Sq.ft. saleable area. 10956 saleable area booked.
18% area booked.

E Wing Lavender

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E Wing LavenderDec 2023510001700
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.29 Sq.mts. ( 283 Sq.ft. )12
6 Booked50% Booked
50% Booked
1 BHK26.62 Sq.mts. ( 287 Sq.ft. )38
1 BHK26.74 Sq.mts. ( 288 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK30.88 Sq.mts. ( 332 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK18.84 Sq.mts. ( 203 Sq.ft. )8
5 Booked62% Booked
62% Booked
1RK20.78 Sq.mts. ( 224 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop7.7 Sq.mts. ( 83 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop10 Sq.mts. ( 108 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.1 Sq.mts. ( 109 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop18.06 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
81 total apartments / 19 apartments booked. 23% apartments booked.
Work Description in Building E Wing LavenderCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

F Wing Lilly

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F Wing LillyDec 2023510001700
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.27 Sq.mts. ( 283 Sq.ft. )16
7 Booked43% Booked
43% Booked
1 BHK26.61 Sq.mts. ( 286 Sq.ft. )10
3 Booked30% Booked
30% Booked
1 BHK26.63 Sq.mts. ( 287 Sq.ft. )24
6 Booked25% Booked
25% Booked
1 BHK26.74 Sq.mts. ( 288 Sq.ft. )6
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK30.88 Sq.mts. ( 332 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK18.84 Sq.mts. ( 203 Sq.ft. )8
5 Booked62% Booked
62% Booked
1RK20.35 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK20.78 Sq.mts. ( 224 Sq.ft. )1
None Booked0% Booked
0% Booked
74 total apartments / 22 apartments booked. 29% apartments booked.
Work Description in Building F Wing LillyCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

G Wing Lotus

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G Wing LotusDec 2023510001700
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.17 Sq.mts. ( 282 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK26.3 Sq.mts. ( 283 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK26.49 Sq.mts. ( 285 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK26.61 Sq.mts. ( 286 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK26.63 Sq.mts. ( 287 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK26.74 Sq.mts. ( 288 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.75 Sq.mts. ( 288 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK30.54 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.88 Sq.mts. ( 332 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK26.17 Sq.mts. ( 282 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK18.84 Sq.mts. ( 203 Sq.ft. )8
None Booked0% Booked
0% Booked
1RK20.78 Sq.mts. ( 224 Sq.ft. )2
None Booked0% Booked
0% Booked
71 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building G Wing LotusCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Shakti Developers
for Project
The Green Orchid Phase Ii
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation