Project overview

Tiara Hills Phase I Bldg No 3, 5 And 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700010406. Tiara Hills Phase I Bldg No 3, 5 And 2 is located at Thane, 401107. This is a On-Going Project being developed by Pnk Space Development Pvt Ltd.

Tiara Hills Phase I Bldg No 3, 5 And 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 295 to 468 Sq.ft. Carpet. The Project has total 406 of which 60 are currently available for sale.

Tiara Hills Phase I Bldg No 3, 5 And 2 is being developed on a total land area of 203938 Sq.ft. out of which 19105 Sq.ft. i.e 9% is reserved for recreational purposes. Tiara Hills Phase I Bldg No 3, 5 And 2 has 3 Wings / Towers Tiara Hills Bldg No 2,Tiara Hills Bldg No 3,Tiara Hills Bldg No 5

ProjectDeveloperLocationPossession
The Palace Tower BJp Infra Realty Private LimitedVinay Nagar Road, Vinay Nagar, Vinay Nagar31-12-2028 00:00:00
The Palace Tower CJp Infra Realty Private LimitedVinay Nagar Road, Vinay Nagar, Vinay Nagar31-12-2028 00:00:00
Apna Ghar Phase-Ii Plot-ASeven Eleven Construction Private LimitedMira Road East, Village Ghodbunder, Village Ghodbunder31-12-2020 00:00:00
Arkade Art Phase 1Arkade RealtyThane, 40110730-06-2017 00:00:00
Jp North CelesteJp Infra (Mumbai) Pvt. Ltd.18M Dp Road, Mira Road, Mira Road31-03-2019 00:00:00
Jp North EstellaJp Infra Realty Private LimitedVinaynagar Road, Vinaynagar, Vinaynagar31-12-2020 00:00:00
Jp North Imperia - Tower 1Jp Infra Realty Private LimitedVinay Nagar Road, Near Vinay Nagar, Near Vinay Nagar30-12-2025 00:00:00
Jp North Imperia - Tower 2Jp Infra Realty Private LimitedVinay Nagar Road, Near Vinay Nagar, Near Vinay Nagar30-12-2025 00:00:00
IndradhanushSonam Homes Private LimitedKashigaon Road, Kashigaon, Mira Bhayander, Kashigaon, Mira Bhayander30-10-2024 00:00:00
Raj AkshayRaj AkshayPleasant Park, Miragaon, Miragaon30-12-2025 00:00:00
North BarcelonaJp Infra Residency Private LimitedVinay Nagar Road, Near Vinay Nagar, Near Vinay Nagar30-12-2025 00:00:00
Gn FirdowsGnr DevelopersWestern Park, Kashi Village, Kashi Village30-12-2024 00:00:00
Jp North AvivaJp Infra Realty Private LimitedVinay Nagar Road, Vinay Nagar, Vinay Nagar30-12-2026 00:00:00
The Willows Phase 1Origin Realtors LlpHatkesh Road, Gaurav Valley, Gaurav Valley30-06-2022 00:00:00
Project Details
  • Project:
    Tiara Hills Phase I Bldg No 3, 5 And 2
  • Location:
  • Thane, 401107
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Pnk Space Development Pvt Ltd
  • Phone:
  • Address:
  • 1St Floor, Asmita Super Market Building, Poonam Sagar Complex, Above Casadella Bakery, Mira Road East, 401107
Project RERA Details
MAHA REARA No: P51700010406
Project Type Residential
RERA Project Status On-Going Project
Funding Bank KOTAK MAHINDRA BANK
Proposed Possession 31 Dec 2024
Revised Possession 30 Dec 2025
Extended Possession 30 Dec 2026
Litigations Yes
Last Modified 27 Dec 2023
Last Retrived 16 Jan 2025
Tiara Hills Phase I Bldg No 3, 5 And 2 QR Code
Tiara Hills Phase I Bldg No 3, 5 And 2
MahaRERA - P51700010406
Apartment Details & Configuration
TypeArea
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )
2 BHK43.51 Sq.mts. ( 468 Sq.ft. )
2 BHK43.01 Sq.mts. ( 463 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tiara Hills Phase I Bldg No 3, 5 And 2last updated on 16 Jan 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Done Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station60% completed
60% Complete
Will Be Done Prior To Oc
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Will Be Done Prior To Oc
FITNESS CENTER
Will Be Done Prior To Oc
Landscaping & Tree Planting
Will Be Done Prior To Oc
Open Parking
Will Be Done Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
Will Be Done Prior To Oc
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Will Be Done Prior To Oc
Street Lighting65% completed
65% Complete
Will Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
Will Be Done Prior To Oc
Water Supply
Will Be Done Prior To Oc
Buildings / Wings in Tiara Hills Phase I Bldg No 3, 5 And 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tiara Hills Phase I Bldg No 3, 5 And 2 by Pnk Space Development Pvt Ltdlast updated on 16 Jan 2025 as per information obtained from MARA RERA.

203938 Sq. ft.

Project Area

19105 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

406 apartments in total
Total
406
Booked
346
Available
60

Saleable Area Statistics (Sq. ft.)

132198 Total
Total
132198
Booked
112400
Available
19797
Total 406 apartments in project. 346 apartments booked. 85% apartments booked.
Total 132198 Sq.ft. saleable area. 112400 saleable area booked.
85% area booked.

Tiara Hills Bldg No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tiara Hills Bldg No 2Dec 202424111017164
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )189
157 Booked83% Booked
83% Booked
2 BHK43.51 Sq.mts. ( 468 Sq.ft. )30
23 Booked76% Booked
76% Booked
219 total apartments / 180 apartments booked. 82% apartments booked.
Work Description in Building Tiara Hills Bldg No 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress70% done
70% Booked
X number of Podiums
X number of Slabs of Super Structure

Tiara Hills Bldg No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tiara Hills Bldg No 3Dec 202424111017146
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )99
88 Booked88% Booked
88% Booked
99 total apartments / 88 apartments booked. 88% apartments booked.
Work Description in Building Tiara Hills Bldg No 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tiara Hills Bldg No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tiara Hills Bldg No 5Dec 202424111017132
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )47
42 Booked89% Booked
89% Booked
2 BHK43.01 Sq.mts. ( 463 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK43.51 Sq.mts. ( 468 Sq.ft. )34
30 Booked88% Booked
88% Booked
88 total apartments / 78 apartments booked. 88% apartments booked.
Work Description in Building Tiara Hills Bldg No 5Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pnk Space Development Pvt Ltd
for Project
Tiara Hills Phase I Bldg No 3, 5 And 2
last updated on 16 Jan 2025 as per information obtained from MARA RERA.