Project overview

Tokyo Bay Phase - 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000618. Tokyo Bay Phase - 1 is located at Fqzxa3zis/Dikh+Wvgafemmvveq3wt9qsussswxmvnw=. This is a Ongoing being developed by Puranik Tokyo Bay Private Limited.

Tokyo Bay Phase - 1 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 407 to 608 Sq.ft. Carpet. The Project has total 168 of which 2 are currently available for sale.

Tokyo Bay Phase - 1 is being developed on a total land area of 51431 Sq.ft. out of which 10776 Sq.ft. i.e 21% is reserved for recreational purposes. Tokyo Bay Phase - 1 has 2 Wings / Towers Wing A - Yuki,Wing B - Saki

ProjectDeveloperLocationPossession
Kavya ParkShree Construction CompanyBye7ts1okoixtfwh97myyodbsyy03+Zh87nfq/Jzcpkhy2alrk3ryxfzlld0u+Gx6p0hr9vp2hlva74h7i8ymw==30-06-2021 00:00:00
Kavya ResidencyKavya Mira RealtyCv4m6c0gagchjuec3nx+Jvijn29tej2md/Hthkmse17tea4qhh9o/Vrcc5+Mb2chb4yh/Ueth4spu/Qvs+Cv7/E1n0ztgrnh6+Uu3pbbuxm=31-12-2019 00:00:00
Tokyo Bay Phase - 2APuranik Tokyo Bay Private LimitedKfjt/Bi/Osqcnb5v9lyz5+Flvijt2mkxsqwqnqh4oofakpr4eos5gohwzzg33w4s30-12-2024 00:00:00
Platinum TowerHaware's Housing Development Finance Corporation Ltd.Ve5ryhgoinvvhml7tefvaqzxguehfk/Eyamce2rzxo3hvzkvmunhlkibucjjsy6z30-09-2022 00:00:00
FalconM/S Ace ConstructionsE1vmrlwc8mhrjuihr8toyeyfbvhfvnmjh2ynyopbhgi=30-06-2018 00:00:00
Pristine TowerIdeal DevelopersThane, 40061531-12-2017 00:00:00
Tropical Lagoon - 4 -JacarandaSoham EstatesT1zlsa9gtldyel4cdthxwablrvgyfzhgubzu8idgxidjz4df1+Co8wxv136yaqbtcaqxyclipco5d0a0+P6zg+Z6d/Ra0xw05qbh2ex4klq=31-05-2018 00:00:00
Tokyo Bay Phase - 1Puranik Tokyo Bay Private LimitedFqzxa3zis/Dikh+Wvgafemmvveq3wt9qsussswxmvnw=30-10-2023 00:00:00
Rumahbali Phase 2Puranik Builders Limited7M3ij+Vst261txvv4aypolelb6k7urjz50f3pdv/Kg2a2gaaurccbsxmkpu1fsnhu9gh7cfbohxkxwbr64jw1fkap4ovy7gv5juggr3cjcipnkrfodrvupjmpyggffcx30-12-2023 00:00:00
Prathamesh TowersShivam DevelopersAm+Tlprs4blyz+6Rayvidq==31-03-2018 00:00:00
ShantaiJanardhan Sakharam Bhoir8Vst+Lz+Bpizsjevejaeqw==31-12-2019 00:00:00
Trinity HeightsAnil Thakurdas KursijaWvc22en0pj8xf4nns6yni562mzxhon6hrcxzhvnq9ba=30-05-2023 00:00:00
Raunak HeightsUnnathi AssociatesB1o+Whhxrxk4lx4cmzd+1S5y6q5oq+L1x9oit2t61ne=30-12-2025 00:00:00
Ashok Smruti DefgM/S KeytechZkyt8sglj5zwaoql7eoqsq==31-12-2019 00:00:00
Puranik City Reserva Phase 1Puranik Builders LimitedM8ai7rxbqbeyiwnechvmtucg2bzmtlkgkvr5d8wq3nahpt+Bvbgprqnxojdztoqsfxiw3z7l8y1kf4mec1xg2+Xnigfcvpoyoodfg9hevoa5j/Dkkdzsqosqo8ipyvvq8xr1yecvxzsz+Mcaqq2zww==30-03-2029 00:00:00
White HouseLaabh Samruddhi EnterprisesCgg2atenl/Q46sotv8wu+W==30-12-2025 00:00:00
Pride Residency DaffodilSahil DevelopersHjxkrxbciqndpps2kbfykjeuviy/Lo/Zrr9k5yyiox0=31-12-2018 00:00:00
Satgurus SolitaireBuildwell Land Developers Private LimitedWkgnycagav9avtopetyglcdibpq0os2tygumy7mtv/A=31-12-2017 00:00:00
Commercial Building 10Vihang Infrastructure Pvt LtdGgebhsg0vswdxdzv8fdjuei84w7hpgy3x6lhtehlftxjcdhn/Mryommn+Tefshoe3dgcwgrf5lcvmnyngvgt30sohm7kbnblrqhmqlsuzq5hyckrn4sp/Pfh94u9rz5ee6fjv1t63exfysdzq67hmcgsymntjysd/Qfvfjbfkucuqafmhzzhao3dqoil7hs2g4g4d6txbaw862qut9zq6vusflp0nxmketg6yujyn76ootvudixfpqowpss1lemf31-12-2024 00:00:00
Ace EnclaveAce Signature Homes LlpQteztealwfqqs97tllfxug==31-12-2026 00:00:00
Rumah Bali Phase 4Puranik Builders LimitedTku0ipksyscbhnc3nenvw6jvat1paqp31/E6pti17u4vylb5llcf58wcdewufphiq895abm7fzm15rh4ycgwnirjkzvd2hfahjqrsxr39sl5c2nt9zsbzm4lnnxutf7/Bavm8cqnuese+Lstqb33l0x5yzeufi4exzndn1wsoqh9c5iafqhbaumy+Lnvdjukkukll7pcminjwdarroc8ezpapnsm717eoomddccyboyxydmdgeyuxlrpmgsgugj4nrjal/Eilslru6auvanifmo19ijbabvpdmqu18xqbxhv0zaojpd9ajv0g45g4o1ocdq9qz9wqm/Tl/Nwlnpz9w==31-12-2028 00:00:00
Pushpanjali Residency Phase IiiShriraam Pioneer Developers Private LimitedYushcu2wpjpeucoiquv4mlgptqzmae3k+6Lyfoknhm9opr1qosvuempldhgv4woenbwf2fvxrq3buxvc8etwk3yp1xtm+Vxp2o/L8skqbdgpkb7lf2xlk7c7qubytksi30-12-2022 00:00:00
Ace Square Phase 1Anant SquareY7wg5zbjabavulofuswwh36t+M75w3k9g7d3kptnjqk=31-12-2017 00:00:00
Mahavir Kalpavruksha - J WingDamji Shamji Realty Pvt.Ltd.32Si2pjqdw2kv9dgpddxzc7hzhjhqoglpkgmc80v0meexnsskymeeiygrwfyxfatlysaz+Kctp2nb1h5x4ght3hnbnteqvfq+Bnhjdfjrruk7/Qpzxevk/R1vznamvg+U2ybi9zime0qo8ezesuowg==30-12-2023 00:00:00
Sai PalaceSai DeveopersDgmnztclbodnwjiji+Vveiboopjo+Fx5hjbcnjcjtny=31-03-2018 00:00:00
Mukund NiwasNew Vegas DevelopersNxorlkwdygklffrbpnbuwg==30-09-2020 00:00:00
Metropolis - Insignia TowersANANT SQUARE4/4, 4/5 And 6/114-04-2026 00:00:00
RAUNAK 108UNNATHI ASSOCIATES73/1, 73/2, 73/3, 73/430-06-2026 00:00:00
HORIZON PALMS - IIIKM DEVELOPERSOld S No 63, New S No 10130-12-2024 00:00:00
Shree SaketUmesh Raosaheb Pawar PatilJypuwuyvkujuvbydkju3ivba+Afsgtzzflggibw0tvi=31-07-2022 00:00:00
Metropolis - RIVERAANANT SQUARE108/2, 108/430-03-2025 00:00:00
Metropolis - Aquaris Phase 2ANANT SQUARE2/2330-09-2025 00:00:00
Aarambh - CM/S. Annapurna Lifespaces Llp7Ihunz6vvh9za4b2wseqwq==30-06-2026 00:00:00
Dahlia Bldg A D And EHaware Engineers And Builders Private LimitedQzrvclapy/Nbnckxo52aiiult+Blspjxz5wybqcpnrc=30-04-2019 00:00:00
Rosa Oasis Phase 2Uma EnterprisesLcwmlmbcwkopccf2ej8hi4acrlcozw85mti9w1gwfixohcwkqozcf4awswerkvhyqdbiyixet9aawv6vy5sweq==31-12-2018 00:00:00
Fiama ResidencyFiama Construction CompanyMbw1kuefz1xuv2cl+Dng+5N3k0ace7fxpr02qtwsxhl7ooczzvfsu1h0whq7hqwe30-12-2021 00:00:00
Pehla Ghar - Shubh Sanket ComplexLaabh RealtorsThane31-12-2020 00:00:00
Horizon Palms IiK M DevelopersHlc1/Z7mu7nnu7wkmwcmkbcezya5/Mkjkkhyhtcdh3kjhy0sg4seem9codxfe0r330-04-2022 00:00:00
Puraniks CapitolPuranik Builders LimitedKfbrv+Hnys0lrlo1lemjyw==30-12-2036 00:00:00
Mahavir Kalpavruksha - Oak, Tulip, Alcacia, AlmondDamji Shamji Realty Private LimitedOwkdt1znwqmfpvq5epnpbd7jbktbuky6rdurrkuy45qsg8apnsnpavioyn2vg8bs+Tnuwryogcsq8bgmrbcgsw3fakqda9ihogeif2amkund60xrlubtv8kcow3d2itu30-12-2021 00:00:00
TaranganMaison Constructions Private LimitedYfitr+Xcfpdsmaxgkbmzpgz+2B50nrc5m9nn5d5cwxeon+Vcgb2ovw3o+Ds4tfjr31-05-2018 00:00:00
Sukur Enclave Phase 1Rajaram ConstructionGb2slhzhny4llyogjolopr4wzne2pxck5rxetg3qqbsjfyasnszypyv8xlhxjnhxxfbxdj2qv98vc65te1jks8tf5k1qgnhgjvrjnqn4rvhk8pvvbpt8hbvm2hwtvocl31-12-2018 00:00:00
Cascade Avenue BellagioAarsh ConstructionW9bxqyztihyailw5sxccao6yj96w7ludbsltpyq8/T9agnoteceqke+Vzmkhsffssh88dflzjzzryrf5ug+Wyq==31-12-2026 00:00:00
Ace CourtyardAce Signature Homes LlpFzmsxsuon/Gp2bd4cobh5q==31-03-2024 00:00:00
Bhakti Pearl - CBhakti CorporationNlmnzhhskvqosmxxawogrg==31-12-2017 00:00:00
Puranik Home Town - EPuranik Builders LimitedWazsfdolkfxaeyd+0Vaxfrlry3psbpmbomqoa4qrtbn9a1qgzp4dltaqhgbsy+Evxzovvp239bswitkxsr7pkw==30-12-2026 00:00:00
AnthuriumAarti EstatesFrtnoe+Acn0y7sz2bbc2zb7z1bleatj5cpc3l0lnak8ytqnqu0fgmuncllozkpcii1l0oxnhaljyzidm3+L1yw==30-10-2023 00:00:00
Shree Savali Wing BUmesh Raosaheb Pawar Patil HufCombb2j6g4nbhuir+Amtfqn44bf5l9zerooijhmvqti=31-07-2019 00:00:00
SubodhNew Homes Corporation/Du1zaescdrfgmtagyqicuhjfdkj21rsqphn0jz3uuq=30-09-2020 00:00:00
PelicanM/S Ace ConstructionsPeymgr7edu8x3bwn86475q==30-06-2018 00:00:00
Horizon Classique-2Sachin Enterprises54Fp9awokgippbuxjlr/5Ty4thqwvcs3sxbebsqr1zk=30-06-2021 00:00:00
Cosmos Enclave - ChestnutMonarch Developers6Xfrsekqn1vfein870i9sw==30-12-2023 00:00:00
Psk SkylarGururaj DevelopersDaehgd97kqf6zukencbyeefrk+Ubkgcrnxorqcvdysl4e2ktv5haz/Luvxcicyh130-12-2023 00:00:00
Dedhia Elita C WingJaydeep CorporationKtxie9dxa7i18agciggvudzr0schxg+Lffenznr3d+Wdrxvvvcnnd7zywfa3wo4u30-06-2018 00:00:00
Ace Square Phase 2Anant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=30-06-2024 00:00:00
Horizon Heights DShreenath EnterprisesX8rgihhobgx3svrlfvpvvg==30-07-2018 00:00:00
Shree SankalpShree ConstructionsK5sggkwkxffxbbgrphmjgg==31-07-2019 00:00:00
Mahavir Estella - Wing A And BCityscape Construction CoBae3d/Ukjbuux22afadashd2ptzxntmhe1roc9ocbws=31-12-2018 00:00:00
Horizon Classique-ISachin EnterprisesDqdfrgahyyq4lxrcgu2q1f6nirkaftosd21jllgm/W0=30-06-2018 00:00:00
Guru AshishShree Gurukrupa Ventures LlpEkycmc6j94nhl7d1zcsz9q==31-12-2018 00:00:00
Trimity AshwaTrimity ConstructionsYbxzv9tsjwpvpr6mjirz9a==31-12-2017 00:00:00
Laabh GloriaLaabh BuildwellOqp7rog+9Jlmkwxg5h5k15gryvjqkvsr7qrsi25vjzm=30-05-2023 00:00:00
Olive ResidencyGoodwill PropertiesH7koywjrvddgb6uxq+Ankxdb1a/Vkkevydnqkdptbfnetf8uocxt7yfuu48xvgzj30-12-2021 00:00:00
Elita D3Vihang Infrastructure Pvt LtdPfxshpkxtbx4/3Gxmqqies75mkayayp8cmdf/Qufqqsyinhfphasy+Rbzqo5zyy7n7fwatputju04istqvs6hdjygdxxjwbr8qf1bowgqsck9yjmr/Ak50unkt+Psn4htioekg935y1z7iatq/Eh1y2hiyvpzwks0tjzfgris1eirwjwapl49zmz79hda+3Yfz1hxewges6az5ldzpfrpl1qeuveqm3qu/Pzzsmypgssnivnl75cm7nw2ucoyeo6gwyqvhs18xznevax1vwf4w==31-12-2029 00:00:00
Delta Greenville - AsterDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-01-2031 00:00:00
Delta Greenville - CedarDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-12-2030 00:00:00
Ace AristoGaurav Land CorporationRfabwxl0jzmylvcd/Yao9mgekebhfe1pt/Cwwvhaxf7biuxytm1nddrtcym/Wcml31-10-2026 00:00:00
Intelligentia Segment By Haware PropertiesSuresh Kashinath Haware1Pwsmo0jgein00kqzhd8/G==31-12-2027 00:00:00
North Imperial Greens -Tower 2Skylark Buildspace Private LimitedTjreuiyavetbg7vrgqkybyw/Jns91ka8ygwf766mrvrpzjrftoj2acclttofrpgtifvzbxukg9xtldweb/3Vaecz9mqhqraajzmiw2nry++Vqmdhkkbhtt5r0lc8+Rk731-12-2031 00:00:00
Kirans Shree SmaranKiran Vasant Thandre+2Fsioqywwynt9cpw6leig==30-12-2021 00:00:00
Ace HomesAarti EstatesRllpa9mh4pk3z5x30vwoza==30-12-2022 00:00:00
KIPL Moryakhade Infrastructre Pvt. Ltd.S.No. 21/12,13,1430-06-2021 00:00:00
Vihang ValleyVihang Infrastructure Pvt LtdNel5ayhy+Zw7s0zie/8Qi+Sv1zkkefnsekdn1lvbhk9wx53u0at3vf0nw9f/Aukmgucedh46wgr4jxzxfafzk8qkw0y6m+E9j1oew+Ajgljnye+0Tnwg6pcbwfsda/Ki7kd7opbk7es+Cxhgzyjfua==30-12-2026 00:00:00
Elyra By PuraniksNeelshilp Constructions Private Limited31-12-2032 00:00:00
Avatara Phase 1Anant Square30-09-2031 00:00:00
Horizon PearlKm DevelopersAbpwlgyfigior1huxez9m0zo+2Cdphkzfkctxhmngxuxurx4fe5domqqnbtjytjm38d8j2o3+Riuenlx0weqdftkklcjbjljhucmvdpl9sxgxd3/Ewhb8cbzz03o+Dyo/Dalgdutmhwuq0onyqyiza==30-04-2027 00:00:00
HORIZON PALMS IVKM DEVELOPERSOld Survey No 68, Hissa No 1/231-12-2027 00:00:00
Rosa Manhattan Phase 3Sai Uma Construction Private Limited30-06-2032 00:00:00
Mahavir Breeze Phase 1Damji Shamji Realty Pvt. Ltd.Wtbwt3x7u0syczfrtb7/Z7r2zu+G1ji9p3oc0l6z+7B7acylot3wcjbsmebxlo5fjsqhdufb6/Bdrkp81i8yqaoet0kzpvtdazza7kbxn2h/Shvqjiawzaqyoocpllc331-12-2024 00:00:00
Metropolis - Aquaris Phase 1ANANT SQUARE2/2330-09-2024 00:00:00
PINE WOODRDC VENTURES11/831-12-2017 00:00:00
Horizon Pearl IiKm DevelopersCfdijxvzkg306qy9geu0udaqbkmegbzbxrwnmalx2gfzbtfoow69k56g8ky3mitxebpisy+Bfxa+9R2vggd7p0xl/X3smweyalhheekbmpu=31-12-2028 00:00:00
Elysia D-4Vihang Infrastructure Pvt Ltd31-12-2031 00:00:00
Prity Park B And C Bldg Phase 2S D Bhalerao AssociatesOwala31-12-2017 00:00:00
Joy SquareAnant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=31-12-2019 00:00:00
Mahavir Estella - Wing EM/S. Cityscape Construction CompanyX4krlej3qnmun9mozxwq4a8gt9y2cgvdjacr0ykc9f38yxemhayg/Neqsf/Uh7jumy4adtjxt1d2mnpoy3atohev+Cwtk+Vmfxzo+Bvq96g=31-01-2021 00:00:00
Puraniks Unicorn Phase 2Puranik Builders LimitedRr1rrykv6ugvifnfn1rrvijxfgf8hbxxzhkl+Xriq1i/Vzc7ztnbgthwcsqrowiltme3o2n2x3jsfzrrwse+Qg==31-12-2029 00:00:00
Project Details
  • Project:
    Tokyo Bay Phase - 1
  • Location:
  • Fqzxa3zis/Dikh+Wvgafemmvveq3wt9qsussswxmvnw=
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2023
Developer Details

  • Developer:
    Puranik Tokyo Bay Private Limited
  • Phone:
  • Address:
  • Puraniks One
Project RERA Details
MAHA REARA No: P51700000618
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Vastushilpa Associates
Funding Bank HDFC BANK
Proposed Possession 30 Oct 2023
Revised Possession 30 Oct 2023
Extended Possession
Litigations No Litigations
Last Modified 18 Jul 2017
Last Retrived 13 Feb 2026
Tokyo Bay Phase - 1 QR Code
Tokyo Bay Phase - 1
MahaRERA - P51700000618
Apartment Details & Configuration
TypeArea
1 BHK TYPE 137.8 Sq.mts. ( 407 Sq.ft. )
1 BHK TYPE 237.97 Sq.mts. ( 409 Sq.ft. )
2 BHK TYPE 156.39 Sq.mts. ( 607 Sq.ft. )
2 BHK TYPE 256.53 Sq.mts. ( 608 Sq.ft. )
Shop No. 134.29 Sq.mts. ( 369 Sq.ft. )
Shop No. 1026.94 Sq.mts. ( 290 Sq.ft. )
Shop No. 255.96 Sq.mts. ( 602 Sq.ft. )
Shop No. 314.72 Sq.mts. ( 158 Sq.ft. )
Shop No. 425.54 Sq.mts. ( 275 Sq.ft. )
Shop No. 534.24 Sq.mts. ( 369 Sq.ft. )
Shop No. 624.55 Sq.mts. ( 264 Sq.ft. )
Shop No. 736.9 Sq.mts. ( 397 Sq.ft. )
Shop No. 838.54 Sq.mts. ( 415 Sq.ft. )
Shop No. 943.48 Sq.mts. ( 468 Sq.ft. )
1 BHK37.79 Sq.mts. ( 407 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tokyo Bay Phase - 1last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Will Be Done Prior To Oc
Community Building
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Will Be Done Prior To Oc
Energy management100% completed
95% Complete
Solar System Will Be Done Prior To Oc
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Will Be Done Prior To Oc
Landscaping & Tree Planting100% completed
95% Complete
Will Be Done Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Will Be Done Prior To Oc
Solid Waste Management And Disposal100% completed
95% Complete
Will Be Done Prior To Oc
Storm Water Drains100% completed
95% Complete
Will Be Done Prior To Oc
Street Lighting100% completed
95% Complete
Will Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Will Be Done Prior To Oc
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Prior To Oc
Water Supply100% completed
95% Complete
Will Be Done Prior To Oc
Buildings / Wings in Tokyo Bay Phase - 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tokyo Bay Phase - 1 by Puranik Tokyo Bay Private Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

51431 Sq. ft.

Project Area

10776 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

168 apartments in total
Total
168
Booked
166
Available
2

Saleable Area Statistics (Sq. ft.)

86858 Total
Total
86858
Booked
85644
Available
1214
Total 168 apartments in project. 166 apartments booked. 98% apartments booked.
Total 86858 Sq.ft. saleable area. 85644 saleable area booked.
99% area booked.

Wing A - Yuki

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A - YukiOct 2022171002088
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 137.8 Sq.mts. ( 407 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK TYPE 237.97 Sq.mts. ( 409 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK TYPE 156.39 Sq.mts. ( 607 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK TYPE 256.53 Sq.mts. ( 608 Sq.ft. )32
32 Booked100% Booked
100% Booked
Shop No. 134.29 Sq.mts. ( 369 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 1026.94 Sq.mts. ( 290 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 255.96 Sq.mts. ( 602 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 314.72 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 425.54 Sq.mts. ( 275 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 534.24 Sq.mts. ( 369 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 624.55 Sq.mts. ( 264 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 736.9 Sq.mts. ( 397 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 838.54 Sq.mts. ( 415 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 943.48 Sq.mts. ( 468 Sq.ft. )1
1 Booked100% Booked
100% Booked
88 total apartments / 88 apartments booked. 100% apartments booked.
Work Description in Building Wing A - YukiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Wing B - Saki

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - SakiOct 2022171002074
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.79 Sq.mts. ( 407 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK37.97 Sq.mts. ( 409 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK56.39 Sq.mts. ( 607 Sq.ft. )16
14 Booked87% Booked
87% Booked
2 BHK56.53 Sq.mts. ( 608 Sq.ft. )32
32 Booked100% Booked
100% Booked
80 total apartments / 78 apartments booked. 97% apartments booked.
Work Description in Building Wing B - SakiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Puranik Tokyo Bay Private Limited
for Project
Tokyo Bay Phase - 1
last updated on 13 Feb 2026 as per information obtained from MARA RERA.